| 1 | Supply of 110 KV Outdoor termination kit for 1X 630 Sq.mm Alu.XLPE cable including the cost of all labour,lead,lift etc., complete as per IS Standard and as directed by the dept. engineer at site. |
| 2 | Labour for Dismantling jumpers and droppers including the cost of all labour,lead,lift etc., complete as per IS Standard and as directed by the dept. engineer at site. |
| 3 | Labour charges for Dismantling of cable terminations and retrieval of 1x630 sq.mm fault cable in the trench laid between Auto transformer -II to 110 kV LV-II breaker as cutbit scrap based on site condition including cost of materials labour, transport, lead and lift etc complete in all respects. |
| 4 | Loading of cable cutbit at MM Nagar site and unloading /devolution at GCC stores. (Approximate Weight - 5.9 MT of Cables) including cost of labour, lead, lift, tools and plants etc complete. |
| 5 | Loading of New Cable at GCC Stores/Allotted place and Unloading at M.M.nagar SS . Approximate Weight - 3 MT of Cables ) including cost of labour, lead, lift, tools and plants etc complete. |
| 6 | Transporting the New 1x630 sq.mm Cable from GCC store/Alloted Place to M.M.Nagar SS site and devoltion of cable scrap from MM Nagar SS site to Ambattur Stores including cost of labour, lead, lift, tools and plants etc complete. Distance from Ambattur store to Maraimalai Nagar 230kV SS site. |
| 7 | Laying of 1x630 sq.mm 110KV XLPE UG Cable in trench by means of winch over rollers, dressing the cable in trefoil formation, tying the cable with nylon rope at every 3m intervals.The rate includes providing of winch, steel wire drum, cable drum stand, rollers, ramp and including all T&P's required for laying of cable and pulling the steel wire rope from winch side to drum side, all tools & plants, labour consumables, lead, lift etc., complete. |
| 8 | Erection charges for 110kV Termination with both end of Auto Transformer-II and LV-II breaker including cost of materials labour, transport, lead and lift etc complete in all respects as per standard specification. |
| 9 | Labour for providing jumpers and droppers as directed by the dept. engineer at site including the cost of all labour,lead,lift etc., complete as per IS Standard and as directed by the dept. engineer at site. |
| 10 | Labour Charges for sheath testing charges per cableas directed by the dept. engineer at site including the cost of all labour,lead,lift etc., complete as per IS Standard and as directed by the dept. engineer at site. |
| 11 | GST for bidders within TamilNadu |
| 12 | GST for bidders outside TamilNadu (IGST) Please Enable Macros to View BoQ information |