| 1 | Repairs and Maintenance of 1250KVA Transformer with OLTC installed at SKICC |
| 2 | Disconnecting, Dismentalling, Reinstalling after repairs/maintenance of the transformer including carriage to and from the site. This includes cost of hirng of suitable crane, testing and commisioning on load at site. |
| 3 | Labour charges for unloading, detanking, removal of core coil, retanking and loading at workshop |
| 4 | Hot Oil bath of core-coil assembly |
| 5 | Baking of Core-coil assembly |
| 6 | Filtration of transformer Oil (As per actual requirement) |
| 7 | Fresh Transformer oil for OLTC and Main Tank Topping.(As per actual requirement) |
| 8 | Gasket Set |
| 9 | Servicing of OLTC including Replacement of Roller Contacts and Electricals and to make it functional in all modes of operation. |
| 10 | Silcagel breather for transformer and OLTC |
| 11 | Inside and outside Cleaning of Transformer with painting of transformer tank |
| 12 | P/F of LT Bush rod sets (Set of Four) (If required) |
| 13 | P/F of HT Bush rods (Set of Three) (If required) |
| 14 | Repairs and Maintenance of 630KVA Transformer with OLTC installed at SKICC |
| 15 | Disconnecting, Dismentalling, Reinstalling after repairs/maintenance of the transformer including carriage to and from the site. This includes cost of hirng of suitable crane, testing and commisioning on load at site. |
| 16 | Labour charges for unloading, detanking, removal of core coil, retanking and loading at workshop |
| 17 | Hot Oil bath of core-coil assembly |
| 18 | Baking of Core-coil assembly |
| 19 | Filtration of transformer Oil (As per actual requirement) |
| 20 | Fresh Transformer oil for OLTC and Main Tank Topping.(As per actual requirement) |
| 21 | Gasket Set |
| 22 | Servicing of OLTC including Replacement of Roller Contacts and Electricals and to make it functional in all modes of operation. |
| 23 | Arching Hornes |
| 24 | Silcagel breather for transformer and OLTC |
| 25 | Inside and outside Cleaning of Transformer with painting of transformer tank |
| 26 | P/F of LT Bush rod sets (Set of Four) (If required) |
| 27 | P/F of HT Bush rods (Set of Three) (If required) Please Enable Macros to View BoQ information |