| 1 | Removal of plants/ ficus growth by pulling out root system embedded in masnory, cutting stem and application of hing/gur/lime formulation as specified by the Architect or other patented chemical biocide treatment such as biocide 'Glycel' (isoproplamine salt of glyphosate) or other chemical as specified by the Engineer in charge etc. complete |
| 2 | Removing the tar or coba and disposing of the material as directed etc. complete. |
| 3 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. |
| 4 | Dismantling brick masonry in lime or cement mortar and stacking the materials as directed with all leads, lifts etc. |
| 5 | Dismantling stone masonry in lime or cement mortar including stacking the materials as directed with all leads, lifts etc. |
| 6 | Removing R.S. girders of any size and span lowering the same and stacking neatly wherever directed in the compound scaffolding etc. complete. |
| 7 | Removing pointing and other epoxy-based hard material from joints and surface area of Basalt stone masonary manually with chisel and hammer or with the help of electric grinders wherever directed by Engineer In charge. Proper care should be taken not to damage the stone during removal. |
| 8 | Removing old paint from steel or other metal surfaces and making the surfaces even with hand scrapping, scaffolding, etc. complete. |
| 9 | Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete. |
| 10 | Removing and resetting Mangalore tiles from roof including refixing loose battens etc. complete. |
| 11 | Removing G.I. or A.C. sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete. |
| 12 | Removing planking from roof or ceiling and stacking them sa directed with all leads and lifts etc. complete. |
| 13 | Removing cement tiles or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all lead, lifts, etc. complete.. |
| 14 | Removing cast iron or wrought iron or A.C. pipe and stacking them as directed with all leads, lifts etc. complete. |
| 15 | Removing corrosion of steel reinforcement by mechanical means like wire brushing, chipping to remove loose rust and then applying rust removal solution by using brush application, leaving the surface for at least 15 to 30 minutes, then removing loose materials by scrubbing or with brush. After detachment of loose scales reddish rusted surface is still left exposed, this has to be retreated or as per approved manufacturers specifications. (Note:- Consider surface area of concrete for payment) |
| 16 | Gently cleaning the surface of stone masonry and piers with specialized water misting techniques employing air water jet using a fine nozzle sprinkling system calibrated to spray fine mist along the stone surface without over wetting followed up by gentle brushing with soft nylon brushes and removing dirt, dust, bird dropping, grease, oil, algae, fungus, monkey beats, vegetable growth etc.as specified. Gentle surface cleaning may include using water misting and mild pH balanced surfactants as specified for indicated areas to remove the surfce dirt, grit accretions by means of water misting and cleaning etc. complete as directed by the Engineer in Charge.(The rate is inclusive of all materials & labours involved except scaffolding). |
| 17 | Lowering down the debris obtained from breaking and removing the cement plaster/burnt brick masonry of the first floor by any means without causing dust nuisance and damage to structure, stacking the same as and where directed including cleaning the site complete. |
| 18 | Providing and laying green net of minimum shade dencity 75 percent as per requrinment on site as per instruction by engr incharge |
| 19 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/ structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:-(1) The elevational area of the scaffolding shall be measured for payment purpose.(2) The payment will be made once only for execution of all items for such works. |
| 20 | Conveying the excavated materials, debris of brick or stone masonary, R.C.C. slab, water proofing, stone members/ materials, cement/ lime concrete, tiles/ marbles/ stone slab/ brick bat coba, etc. upto 5 km, away from the site and cleaning the site properly. |
| 21 | Crack Stitching 8mm Helibar Providing and fixing of Helifix Hi-fin reinforcement Helibars of 8mm dia, single bar in one slot, MOC Austenitic stainless steel, ASTM 304, having cross section area of 10.5sqmm, pitch 38/40, with ultimate tensile strength not less than 1370 N/sqmm, shear strength 7.2kN, along with Helibond Grout, a special cementitious grout with low expansion, non gassing and injectable with exceptional non shrink thixotropic properties having compressive strength at 28 days of not less than 45 N/sqmm. Including chasing of slot in mortar bed upto a depth of 40mm for HeliBars, cleaning the dust and debris from the slot, making damp with water to achieve good bonding of HeliBar with HeliBond grout in the groove of brick/stone masonry ensuring that it remains tight at the joint after curing, including all tools, tackles and equipments using specified machines, excluding Staging & Scaffolding, at various places where there is crack in brick/ stone/ block masonry as directed by structural engineer in charge/ Helifix. |
| 22 | Creating HeliBeam using two 6mm Helibars Providing and fixing of Helifix Hi-fin reinforcement Helibars of 6mm dia, two bars in one slot, MOC Austenitic stainless steel, ASTM 304, having cross section area of 8sqmm, pitch 29/30, with ultimate tensile strength not less than 980 N/sqmm, shear strength 5.5 kN of single bar, along with Helibond grout, a special cementitious grout with low expansion, non gassing and injectable with exceptional non shrink thixotropic properties having compressive strength at 28 days of not less than 45 N/sqmm. Including chasing of slot in mortar bed upto a depth of 50mm for HeliBars, cleaning the dust and debris from the slot, making damp with water to achieve good bonding of HeliBar with HeliBond grout in the groove of brick/stone masonry ensuring that it remains tight at the joint after curing, including all tools, tackles and equipments using specified machines, excluding Staging & Scaffolding, at various places where there is crack in brick/ stone/ block masonry as directed by structural engineer in charge/ Helifix. |
| 23 | Pinning with cemTie 8mm (SS 304) Providing and fixing of Helifix Hi-Fin reinforcement Helical pins / CemTies of 8mm dia. and specified length into a predrilled hole of not more than 18mm dia. MOC Austenitic Stainless Steel ASTM-304, having cross-section area of 10.5sqmm having helical pitch of 38/48 with ultimate tensile strength not less than 1370N/sqmm along with Helibond grout, a special cementitious grout with low expansion, non gassing and injectable with non shrink thixotropic properties having compressive strength at 28 days of minimum 45N/sqmm and specified length along with Helibond grout. Including drilling of holes for CemTies upto 15 mm more than the specified depth, cleaning the dust and debris from the hole and making damp with water ensuring to achieve good bonding of CemTie with HeliBond in the holes of masonry ensuring that it remains tight after curing, at locations as per instructions provided by structural Engineer in charge/ Helifix, including all tools tackles and equipments using specified machines, excluding Staging & Scaffolding. |
| 24 | CrackBond TE 250 Providing & fixing of CrackBond TE 250ml an injectable special purpose non shrink thixotropic epoxy resin with the help of manual pressure applicator and nozzle, including opening of crack, cleaning and ensuring sealing of cracks of 2mm - 12mm width upto a maximum depth of 150mm. |
| 25 | Polyplus SF Providing and filling of general purpose styrene free resin with the help of manual pressure applicator and nozzle, to be used for anchoring helical bars wherever needed/ specified by structural engineerin charge/ Helifix. |
| 26 | Injection Grouting High Performance Polymer Cement Grout: Providing & injecting high performance non shrink, Anti- washout Polymer Cement Grout per pack of 225gm for 50kg bag of cement as per manufacturer’s specifications into honeycombing area / porous concrete with suitable pump at pressure of 2.0 Kg/Cm2 and subsequently cutting /removal of nozzles and sealing of holes with grout etc., complete. This does not include the rate of cement bag. |
| 27 | Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete. |
| 28 | Providing first class Brick masonry with conventional / IS. type bricks in cement mortar 1:4 including scaffolding, racking out joints pointing in C.M 1:3 and watering etc. in pillars of curved shapes, as shown on the drawing or as directed etc. complete. |
| 29 | Providing & mixing Bipolar Concrete Penetrating Corrosion Inhibiting Admixture to provide corrosion protection to both anodic and cathodic sites on the steels surface in fresh concrete |
| 30 | Waterproofing the terrace slab and staircase roof slab with average 100 mm thick concrete of broken brick bats and cement mortar (1:4) inthe proportion of 2 parts of brick bats and 1 part of mortar, laid in proper slope (1:100) well rammed, watered and consolidated with vata 15 cm at junction of walls and Indian patent stone flooring 1:2:3 (12.5 mm chips) 40 mm thick and with admixture of approved water proofing compound as per manufacturers specifications laid after grouting the surface of brickbat coba with neat cement slurry in alternate suitable squares to required slope as directed including filling in joints with bitumen and cleaning the slab top of all dust and loose material; tamping, finishing and curing complete as directed and specified. (Horizontal measurements clear between walls will be paid for). |
| 31 | Waterproofing the terrace slab and staircase roof slab with average 100 mm thick concrete of broken brick bats and cement mortar (1:4) inthe proportion of 2 parts of brick bats and 1 part of mortar, laid in Providing and laying in situ seven course water proofing treatment with APP (Atactic Polypropylene) modified Polymeric memberane over roof consisting of first coat of bitumen primer @ 0.40 Kg per sqm, 2nd, 4th & 6th courses of bonding material @ 1.20 kg/sqm, which shall consist of blown type bitumen of grade 85/25 conforming to IS : 702, 3rd and 5th layers of roofing membrane APP modified Polymeric membrane 2.0 mm thick of 3.00 Kg/sqm weight consisting of five layers prefabricated with centre core as 100 micron HMHDPE film sandwiched on both sides with polymeric mix and the polymeric mix is protected on both side with 20 micron HMHDPE film. 7th, the top most layer shall be finished with brick bats of class designation 10 grouted with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% integral water proofing compound by weight of cement over a 12 mm layer of cement mortar 1:3 ( 1 cement : 3 fine sand) and finished neat (item of laying brick tiles shall be paid for separately). |
| 32 | Providing and fixing 25 mm.(1½″) thick Teak Wood Flooring or Planking for ceiling, as per detailed specifications and drawings or as directed including the thoroughly seasoned and greatest length best Moulmein teak boards, boards to be 38 mm. (1½″) thick and from 10 m. to 15 cm. (4″ to 6″) in width, side joints to be tongued and grooved or tongued and ploughed as may be specified, heading joints to rest upon the joist below, to break joint with one another and to be rebated and tongued together, the boards to be jammed together by flooring clamps, each board to be secured in position by two 2½″ screws screwed to each of the joists below, the heads of all screws to be countersunk and the exposed surface of boards then planed quite smooth, etc. complete. Teakwood planks in kadipat ceiling, wall cladding,flooring : Providing and fixing Ist quality (Superior Quality) Teakwood planks in kadipat ceiling, wall cladding,flooring or any other wooden members etc. TOUNGH AND GROOVE STYLE including removing damage/decayed wood members,fixing stainless steel screws, cutting, sawing,making groove, making rounding on edges if required, making proper wood jonery, scaffolding if necessary all iron work and applying one coat of primer or as directed by Enginner Incharge etc. complete For wood size = 5\\" x 1.5\\" to 7\\" x 1.5\\"“ It is mandatory to use well seasoned and first quality Indian Teak Wood from the Forest Department’s FDCML.” |
| 33 | Providing and fixing Indian T.W beams of size beam - 0.20 x 0.10 - upto 5 m (7.87 x 4 inch x 17ft) for wooden members including scaffolding if necessary etc. complete.Teakwood in Structural members : Providing and fixing Ist quality (Superior Quality- Berma) Teakwood in structural members likebeams,columns,joist,rafters,purlins,purlin cleats,hip rafters, jack rafters, ridges, wall plates, post plates and posts, pedestals or any other wooden members etc. including removing damage/decayed wood members,fixing stainless steel screws, cutting, sawing,making proper wood jonery, scaffolding if necessary all iron work and applying one coat of primer or as directed by Enginner Incharge etc. complete For wood size = 6\\" x 7\\" to 6\\" x 8\\"“ It is mandatory to use well seasoned and first quality Indian Teak Wood from the Forest Department’s FDCML.” |
| 34 | Providing and fixing Indian T.W Battens of size (0.025 x 0.025 (1 x 1 inch) thick length 3 m ) for roofing wooden members including scaffolding if necessary etc. complete.Teakwood in Structural members : Providing and fixing Ist quality (Superior Quality- Berma) Teakwood in structural members likebeams,columns,joist,rafters,purlins,purlin cleats,hip rafters, jack rafters, ridges, wall plates, post plates and posts, pedestals or any other wooden members etc. including removing damage/decayed wood members,fixing stainless steel screws, cutting, sawing,making proper wood jonery, scaffolding if necessary all iron work and applying one coat of primer or as directed by Enginner Incharge etc. complete For wood size = 6\\" x 7\\" to 6\\" x 8\\"“ It is mandatory to use well seasoned and first quality Indian Teak Wood from the Forest Department’s FDCML.” |
| 35 | Providing and applying melamine polish of required finish to the wood work by spray machine including knotting and preparing the even surface by scraping, applying French polish , scaffolding if required etc. complete.Note:The work to be executed on prior approval of Superintending Engineer will be necessary. |
| 36 | Providing and laying Hyperplas standard or equivalent polymeric multiple monolithic five layer water proofing flexible, pliable and high tensile strength membrane (3 Kilogram/ One Square Metre) & consist of centre core of 90 micron thick High Molecular High density Polyethylene film (HMHDPE) which is protected on both the side with polymeric mix. Applying the membrane by thermofusing to roof & parapet after applying thin film of hot blown bitumen 85/25 or 90/15 grade @ 1.2 Kilogram/ One Square Metre maximum as per surface condition or Hyperplas primer @ 250 gms/ One Square Metre as per site condition on the surface to be treated with 10 cm overlapping including finishing etc. complete and covering guarantee of 7 years on stamp paper of Rs. 100/- and as directed by Engineer-in-charge. (Prior permission of S.E.in writing is necessary before inclusion of this item in estimate). |
| 37 | Providing and fixing plain zinc sheeting of 0.80 mm thick (22 B.W.G.) over the ridge hip or valley to galvanized iron sheet roofing including all fastening and bolt galvanised iron screws and bolts, lead and bitumen washers etc. complete.(Weight of 6.8 Kilogram/sq.m.) |
| 38 | Providing and fixing Mangalore tiled roofing with class ' AA' tiles including securing the last course of tiles near the eaves with steel flat 40 mm x 3 mm and 1.22 mm wire fixing 50 mm x 25 mm horizontal teak wood battens and iron works and oiling the battens etc. complete. (Excluding ridge and hip tiles). |
| 39 | Providing and fixing Mangalore tile ridge and hip tiles of class 'AA' including scaffolding if necessary, pointing with coloured cement mortar and curing etc. complete. |
| 40 | Providing and laying cast iron pipes of B class of 100mm diameter with sockets and spigot ends/ flanges and cast centrifugally/vertically including specials, laying pipes and back filling the trench complete including excavation. |
| 41 | Application of water, oil and stain repellent, breathable, Chlorophyllin based Protectguard MG of Killickguard or equivalent with brush on Stone Façade in two coats. Applications to be done |
| 42 | Providing Lime Pointing to stone work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete |
| 43 | Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete. |
| 44 | Providing 12 mm. thick Rough Cast Lime Plaster in single coat in lime mortar 1:1½ in superstructure, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 kg jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete. |
| 45 | Providing internal cement plaster 12mm thick in single coat in cement mortar 1:5 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. |
| 46 | Stucco work in lime, surkhi and sand (1:1:1) as per traditional practices and design, the mortar should be prepared by grinding mill only. The thickness varies from 10mm to 100mm as per design. |
| 47 | Providing and applying integral fine coat, with addition of colour pigments, as paint to the plain lime stucco plaster in 2 layers, including scaffolding, curing, all leads and lifts, etc. complete. 1) The first coat to be laid is a mixture of fine lime and white washing lime in proportion of 2:1,made smooth with wooden rubbers and very lightly beaten. 2)The finishing coat consisting of fine lime, white washing lime, mixed with the appropriate pigment in 1:2:1 proportion is to be applied and well polished with trowels. . |
| 48 | Providing and applying Royale Luxury Emulsion of approved make on internal wall surface as detailed below Scrapping for surface with emery paper and wipe clean for area. wall primer with brush by adding mineral turpentine oil by 8 to 10 % or water by 15 to 20% allowing to dry for 6 to 8 hoursAfter applying acrylic wall putty with appropriate prpportion of water of allow to dry for period of 4 to 6 hours of activity. Scrapping with emery paper and wipe clean Applying paints Royale Luxury emulsion 1st coat with brush water content water 40 to 45% or 65 to 70% by role Applying paints Royale luxury emulsion 2nd coat with brush with water content 40 to 45% or 65 to 70 % by roller. (With prior approval of S.E.) |
| 49 | Providing and applying synthetic enamel paint or flat oil paint in any requiered shade in 3 coats over a primer coat as per manufacturers specifications including scrapping, cleaning the surface etc. Complete. |
| 50 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means |
| 51 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. |
| 52 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 53 | Filling in plinth and floors with approved excavated material in 15 cm . To 20 cm. layers including watering and compacting etc. complete. |
| 54 | Providing uncoursed rubble masonry of trap/ granite/ quartzite/ gneiss stones in cement mortar 1:6 in foundation and plinth of inner walls/ in plinth of external walls including bailing out water manually , striking joints on un exposed faces and watering etc.complete. |
| 55 | Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete. |
| 56 | Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist. |
| 57 | Providing and fixing Ductile iron Man Hole Covers/ Strom Water Grating and Grating with frame of Various sizes, weight and types and load bearing capacity as per EN-124, equivalent NECO with prior approval of concerned Superitending Engineer. |
| 58 | Basalt stone Paving in cement Mortar - Providing and Laying Newasa Stone for paving and thread risers in cement mortar of 150 mm thick (Two line dressed stone 0.45x0.30x0.125 to 0.15 and not less than 0.30x0.30x0.15 Mtrs cut in shape and two adjacent sides to be dressed, from Newasa, Dist Ahmednagar) in plain/diamond pattern on a bed of 1:4 C.M. over 150mm thick cement concrete , and filling the gap in 1:2 Mortar etc, complete) STONE DRESSING IN TICHIV STYLE |
| 59 | Providing and casting in situ or precast tapering R.C.C. M-20 Barrier type Kerb without gutter ( as per IRC 86 1983) embedded 125mm below ground level over M-10 PCC finished neatly with C.M. 1:2, setting the same in C.M. 1:2, including the required excavation in any strata and removing the excavated stuff any where in city and redoing the surface as specified and directed by Engineering In-charge. Using Concrete Batching and Mixing Plant |
| 60 | Providing and laying Polished Shahabad Stone flooring 25mm to 30mm thick and required width wide in plain/ diamond pattern on a bed of 1:6 C.M. including cement float, filling joints, with neat cement slurry, curing, polishing and cleaning etc. complete. Please Enable Macros to View BoQ information |