| 1 | Earth work in excavation by mechanical means (hydraullic excavator ) / manual over area (exceeding 30cm in depth 1.5 m in width as well as 10 sqm on plan ) including getting out and disposal excavated earth lead upto 50m and lift up to 1.5m in comp position D.S.R 2023 SI NO 2.6.1 |
| 2 | CC in (1:6:12)in brick wall bed with 4cm gauge brick ballast ,cement ,c/sand in comp.position (s.i-273) |
| 3 | CC in (1:2:4)mortor on brick work top with approved stone grit cement and c/sand in comp.position DSR2023 SI. NO . 4.1.3 |
| 4 | brick work with common brunt clay f.p.s (non modular )bricks of classdesigin 7.5 in super stucture above plinth level in (1;4) motor DSR 2023 SI. NO 6.4.1 |
| 5 | 12 mm thick plaster in (1:4) mortar with cement and f/sand on brick work in comp position DSR 2023 SI NO 13.4.1 |
| 6 | Rcc work in (1:1;5;3) mortar in plinth beam with 2cm gauge stone grit cement c/sand including all material labour tools etc in comp.position DSR 2023 SI NO 5.2.2 |
| 7 | mild steel in rcc work in comp.position |
| 8 | S/fixing 100mm dia M.S pipe for teen shed with base plate. |
| 9 | S/fixing galvanized corrugated iron roofing 24B.W.G in comp.position including al material labour tools etc in comp.position (s.i-536) |
| 10 | S/fixing 22B.W.G ridge, velly,and gutters for iron roofing fixed with J&U bolt 10mm dia with G.Ilimped and bitumin washer in comp.position including wastage(s.i-537) |
| 11 | providing wall putty on new surface with approvel quality material of berger /j.k./birla/or similar make 2 coats, DSR SI NO 13.8 |
| 12 | finishing wall with Acrylic smooth exterior paint of required shade new work (two or more coat applied). DSR 13.46.1 |
| 13 | thematic painting by an artistic painter of patterns like theme drawing madhubani art modern art oicyure logo swachta slogen etc. with high glow finish exterior emulusion oaint paint brush etc complete as per direction and entire satusfaction of engineer in charge (note measurement of geometrical shapes thematic painting drawing slogans rct. shall be done in a rectangular pattern by measuring the external edges i.e blank space inside geometrical shape shall also be including in the measurement for payment ). item no 03 |
| 14 | Construction of embankment /patri with material obtained from borropit cartage 5.00km . Construction of embankment / patri with material obtained from borropits cartage 5.00 km . Construction of embankment /patri with approved material obtained from borrow pits with all lift and leads transporting to site spreading grading to required slope and compacting to meet requirement of table 300.2 |
| 15 | Contruction of granular sub- base by providing well graded material spreading in uniform layers with motor grader on prepared surface ,mixing by mix in place method with rotavtor at OMC,and compacting with smooth wheel roller to achieve the desired drnsity ,as per MORD,specification 401 |
| 16 | Cement Concrete Pavement.construction of un - reinforcement dowel jointed at expansion and construction joint only, plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other as per clause 1501.2.2 M 30 (Grade) coarse and fine aggregates conforming to is 383 maximum size of coarse aggregate not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and opproriate weigh batcher using approved weigh batcher using mix design ,laid in approved fixed side formwork (steel channel laying and fixing of 125 micron thick polythen film wedges steel plates including leveling the formwork as per drawing) spreeding the concrete with shovels rakes compacted using needle screed and plate vibrators and finished in continuous opertion including provision of contraction and expansion construction joint applying debonding strips primer sealant dowel bars near approaches to bridge / culvert and construction joints admixture as approved curing of concrete slab for 14 days using curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501. with out dowel bar . |
| 17 | STEEL WORK WELDED IN BUILT UP SECTIONS / FRAMED WORK INCLUDING CUTTING HOISTING FIXING IN POSITION AND APPLYING A PRIMING COAT OF APPROVED STEEL PRIMER USING STRUCTURAL STEEL ETC AS REQUIRED . IN GRADING FRAMES GUARD BAR LADDER RALLING BRACKETS GATES AND SIMILAR WORKS INcluding leaser cutting in complete/ possition in DSR 10.25 .2 |
| 18 | s/fixing sign board at site in comp .position |
| 19 | GST Please Enable Macros to View BoQ information |