| 1 | Material and labour for preparation of existing surface and cleaning off loose and unstable materials by mechanical means , filling the crack in brick tile joints with filler and PU sealant and providing 15mm thick plastering in cement mortar 1:3 with proper slope towards the spouts/drain pipe finishing even and smooth complete all as specified with including WPC @2% by wt of cement as per manufacturer's instruction, applied over prepared surfaces, complete all as specified and directed. |
| 2 | Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineerin-Charge. Note : Complete material shall be approved by GE and procured in bulk and kept in lock and key Note : The applicationshall be carried out by personnel trained and authorized by Manufacturer & installation to be carried out as per manufacturers approved method statement . All auxiliary & accessories involved during application should be all as per manufactureres instructions. |
| 3 | Supplying and fixing 5 mm thick interlocking PVC wall lining consisting of plain colour PVC sheet 1 mm yhick inclusive of solvent cement,PVC frames,PVC fasteners/SS screws and all necessary items like C-section at edges/L-section at corners of matching colour etc for fixing at site, complete all as specified and directed. |
| 4 | Material and labour for Gl frame work for seamless ceiling comprising of Gl perimeter channnel 0.55 mm thick with two unequal flanges of 20 and 30 mm and web of 27 mm fixed to surrounding wall using nylon sleeves and screws at 450 mm centre to centre/intermediate channel 0.9 mm thick having two equal flanges of 15 mm each and web of 45 mm suspended from soffit at approx 900 mm centre to centre with Gl cleat and steel expansion fasteners with and including ceiling section (not exc 1.2 m length) of 0.55 mm thickness having kurled web of 50 mm and flange of 26 mm each with lips of 10.5 mm fixed to the intermediate channel with connecting clips across the intermediate channel at 457 mm centre to centre complete all as specified and directed. |
| 5 | Providing and fixing 12 mm thick Gypsum board to flat surface over aluminium snap grid 600mmx600mm frame work, or metal frame work and reinforced with G.I. wiremesh (Fillets, metal frame work and G.I. wire mesh paid separately) complete all as specified and directed. |
| 6 | Taking down Chowkats or frames from the opening of size not exceeding 1.5 sqm each with shutters ( without taking off shutters from the frames) complete all as specified and directed |
| 7 | Taking down Chowkats or frames from the opening of size exceeding 1.5 Sqmtr but not exceeding 4 Sqmtr each with shutters ( without taking off shutters from the frames) complete all as specified and directed. |
| 8 | Supplying and fixing powder coated aluminium frame for doors ,windows, ventilators, partition with one or more rebates including joining cleats, rubber neoprene packing for fixing, complete all as specified and directed. ( Min. thickness of powder coating 50 micron) |
| 9 | Supplying and fixing Aluminium powder coated (of any colour) window and ventilator shutters, sliding , without sash bar, aluminium section weighing 0.55 kg/m including necessary joining cleats, glazing clips, rubber packing, anodised aluminium snap beading, screws etc. complete all as specified and directed. (Min. thickness of powder coating 50 micron) |
| 10 | Supplying and fixing Factory made single extruded WPC (Wood Polymer Composite) solid door/ window/Clerestory windows & other Frames/ Chowkhat of size 65x100 mm comprising of virgin PVC polymer of K value 58 60 (Suspension Grade), calcium carbonate and natural fibers(wood powder/ rice husk wheat husk)and non toxic additives (maximum toxicity index of 12 for 100 gms) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 750 kg/ cum, screw withdrawal strength of 2200 N(Face)& 1100 N (Edge), minimum compressive strength of 58 N/mm2, modules of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/ moisture proof and fire retardant and fixed in position with MS hold fast/ lugs/SS dash fasteners of required dia and length complete all as specified and directed. |
| 11 | Supplying and fixing Factory made single extruded WPC (Wood Polymer Composite) solid door/ window/Ceosetory windows & other Frames/ Chowkhat of size 65x125 mm comprising of virgin PVC polymer of K value 58 60 (Suspension Grade), calcium carbonate and natural fibers(wood powder/ rice husk wheat husk)and non tonic additives (maximum toxicity index of 12 for 100 gms) fabricated with miter joints after applying PVC solventcement and screwed with full body threaded star headed ss screws having minimum frame density of 750 kg/ cum, screw withdrawal strength of2200 N(Face)& 1100 N (Edge), minimum comp (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2, modules of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/ moisture proof and fire retardant and fixed in position with MS hold fast/ lugs/SS dash fasteners of required dia and length complete all as specified and directed. |
| 12 | Supplying and fixing Factory made single extruded WPC (Wood Polymer solid plain flush door shutter of 30mm size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/ rice husk'wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face)& 900 N(Edge), minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof,water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S Screw complete all as specified and directed. |
| 13 | Supplying and fixing Factory made single extruded WPC (Wood Polymer solid glazed and skelton door shutter of 30mm size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/ rice husk'wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum density of 650 kg/cum and screw withdrawal strength of 1800 N (Face)& 900 N(Edge), minimum compressive strength 50 N/mm2, modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof,water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S Screw complete all as specified and directed. |
| 14 | Supplying and fixing Floor door stopper of aluminium alloy body and tongue anodised with hard drawn steel spring fixed to door shutter of size 150mm. |
| 15 | Material and labour for PCC 1:1.5:3 type B0 using 12.5 mm graded stone aggregate for repair of Chajja, Fascia, parapets etc using chicken wiremesh upto 8 m height including necessary formwork, scaffolding. And applying two coats of cement base paint over coat of primer over cement plaster 1:4 complete all as specified and directed. |
| 16 | Dismantling floor, hearth or wall tiling including cement mortar bedding ( but not backing), removing serviceable tiles to store and rubbish off the premises. |
| 17 | Material and labour for 75mm thick Cement concrete type D2, 1:4:8 using 40mm graded agregate as in sub base of floor complete all as specified and directed. |
| 18 | Material and labour for Machine cut Kota stone slab flooring 20-25 mm thick (size not less than 0.5 sqm each) over cement screed base of 15mm thick in CM 1:6 laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete all as specified and directed. |
| 19 | Supplying and fixing non skid ceramic light coloured tiles 7 to 8mm thick (square/rectangular) area of each tile exceeding 0.11 Sqm but not exceeding 0.18 Sqm in floors etc set and jointed in neat cement slurry and pointed in white or colour cement to match the colour of tiles over and including 15mm thick screed bed in CM 1:6 & complete all as specified and directed. |
| 20 | All as per srl Item No 19 here-in-before but as skirting/dado over rendering 15mm thick in CM 1:4. |
| 21 | Supplying and fixing glazed ceramic coloured tiles 450x300mmx6mm thick, etc. on vertical surfaces such as skirting , dados and risers to steps etc. set and jointed in neat cement slurry and pointed in white cement mixed with pigment to match over and including 10mm thick rendering plaster in CM 1:4 on brick surface complete all as specified and directed. |
| 22 | Material and labour for Vitrified ceramic light shade tiles 8/10mm thick (Square/ rectangular) polished, area of each tiles n.exc 0.36 sqm in floors and skirting etc set and jointed in neat cement slurry and pointed in white or coloured cement to match including screed bed or bedding layer of cement mortar(1:6) 15mm thick for laying floor finishes complete all as specified and directed. |
| 23 | All as per srl Item No 22 here-in-before but as skirting/dado over 10mm thick rendering in CM 1:4. |
| 24 | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons etc.Laid, bedded and pointed in any mortar. |
| 25 | Demolition of cement concrete in ground floors and paving not exceeding 15 cm thickness ( below or above ground level) and disposing the rubbish to a distance exceeding 50 Mtr but not exceeding 250 Mtr away to low lying areas complete all as specified and directed. |
| 26 | Brickwork with sub- class ‘B’ bricks, straight or curved on plan to any radius in half brick thick walls built in CM 1:4 complete all as specified and directed. |
| 27 | Demolition of brickwork, built in cement mortar including all quoins, arches, pillars, etc. complete all as specified and directed. |
| 28 | Material and labour for brick work with sub-class 'B' bricks straight or curved on plan exceeding 6 metres mean radius built in cement mortar 1:4 complete all as specified and directed. |
| 29 | All as per Srl item No 28 above but except bricks (old dismantled serviceable bricks obtained from Srl item No 27 shall be reused after necessary cleaning of mortar). |
| 30 | Taking down cement plaster of any description on brick walls, etc including raking out joints, hacking for key scrubbing down with water etc complete all as specified and directed. |
| 31 | Material and labour for rendering 15 mm thick on brick work or concrete surfaces on walls in CM 1:4 with water proffing compound as per manufacturer instructions finishing even and smooth without using extra cement complete all as specified and directed. |
| 32 | Material and labour for rendering 15 mm thick on brick work or concrete surfaces on walls in CM 1:6 with water proffing compound as per manufacturer instructions finishing even and smooth without using extra cement complete all as specified and directed |
| 33 | Material and labour for rendering 10 mm thick on brick work or concrete surfaces on ceiling in CM 1:3 with water proffing compound as per manufacturer instructions finishing even and smooth without using extra cement complete all as specified and directed. |
| 34 | Supply only water proofing compound complete all as specified and directed. |
| 35 | Material and labour for applying three coats of whitewash on ceiling including preperation of newly plastered/old decorated surfaces complete all as specified and directed. |
| 36 | Material and labour preparation of newly plastered surface of wall and Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer's specification including Two or more coats on new work over 2mm thick wall care putty complete all as specified. |
| 37 | Material and labour for Preparing of old decorated brick/concrete plastered/un-plastered surfaces of walls pillars cornices by complete removal of existing treatment by manually or mechanically from wall and applying two coat of oil bound distemper over a coat of primer incl 1 mm thickplaster of paris putty on complete surface and making smooth surface complete all as specified and directed. |
| 38 | Material and labour for Preparing of old decorated brick/concrete / plastered surfaces of walls pillars cornices by complete removal of existing treatment by manually or mechanically from wall and applying two coat of weather proof exterior paint over a coat of primer incl 1 mm thickplaster of paris putty complete and making smooth surface complete all as specified and directed. |
| 39 | Material and labour for Preparing of old decorated brick/concrete /un-plastered / pointed surfaces of walls pillars cornices applying two coat of weather proof exterior paint over a coat of primer incl 1 mm thickplaster of paris putty in depression and making smooth surface complete all as specified and directed. |
| 40 | Material and labour for preparation of old plastered surfaces on ceiling and applying two coats of white wash on surfaces complete all as specified and directed. |
| 41 | Material and labour for preparation of newly plastered surfaces and applying two coats of exterior emulsion paint paint over a coat of cement primer including 1 mm thick birla white putty on external wall surfaces complete all as specified and directed. |
| 42 | Hacking out old broken glass from wooden/ steel window cleaning the surface and removing from the site, thenafter Supplying and fixing clear glass, 3.5 mm thick ordinary quality, in any shape, not exceeding 0.50 sqm in each pane including and glazing with oil putty/wooden beading as per site requiremnets, complete all as specified and directed. |
| 43 | Supplying and fixing in Stainless steel wire cloth, 0.36mm nominal dia of wire and average width of aperture 1.40mm and fixed with stainless steel wire staples complete all as specified and directed |
| 44 | Supplying and fixing in repair Helical door spring 300mm, ordinary rat tail rod pattern springs, including roller and roller plate fixed to iron chowkats with weilding complete all as specified and directed. |
| 45 | Supplying and fixing Solid PVC Door Frame of Size 50mm x 47mm made out of 5mm thick wood grain printed PVC Sheetused instead of plain colour PVC Sheet &edges will be painted to match with printed sheet reinforced with MS Square tube in opening as per specification and frawing. |
| 46 | Supplying and fixing 28 to 30 mm thick (Rajshri brand) factory made solid PVC moulded Door shutter with 2,3 or6 raised psnel design with 2mm thick moulded PVC Sheet on the front face and 2mm thick 3D wood grain moulded r PVC Sheet polyurethene painted on the front face & 2 mm thick prelem PVC Sheet on back side fixing in iron frame at site complete all as specified and directed. |
| 47 | Material and labour for PCC 1:2:4 , type B-0 (using 12.5 mm graded stone aggregates) in bed blocks for hold fast and similar nature of works, complete all as specified and directed. |
| 48 | Supplying and fixing factory made 30 mm thick flush shutters solid core construction with block board core and plywood face panels, complete all as specified and directed. |
| 49 | Material and labour for apply One coat of synthetic enamel pain on steel surfaces of any description over 10 cm in width or girth not otherwise described including prepration of OLD surfaces complete all as specified and directed |
| 50 | Material and labour for One coat of synthetic enamel painting on wooden surfaces of any description over 10 cm in width or girth not otherwise described including prepration of OLD surfaces complete all as specified and directed. |
| 51 | Material and labour for water proofing treatment to sunken floors of kitchen, toilets, laboratories, bath and WCs etc shall be as under:-(a) Remove all the existing sunken treatment and clean the sunken/lowered portion of RCC slab surface for full depth of sunken floor by wire brush .Chisel out any mortar sticking the surface .(b) All pipes passing through walls of sunken floors shall be laid before water proofing treament is carried out.One No. 50 mm dia , 35 cm long medium grade GI pipe with wire gauge on inside mouth shall be provided to each sunken portion.(C) Applying FOSROC Nitroproof 600 PF (Minimum 0.8 mm dft) over a priming coat of Nitroproof WB Primer or equivalent product of Asian Paints ,M/s MC Bauchemie /CIPY/ SIKA/Pidilite Dr Fixit/Thermax/STP/Berger applied as per manufacturer's instructions to bottom and full verticle sides of sunken floors.(d) Fill it with water and check for dampness and seepage . In case the slightest indications of seepage/leakage is noticed , the same shall be rectified by injection grouting to seal all cracks or application of Polymer modified mortar of FOSROC Nitobond SBR or equivalent of M/s MC Bauchemie / CIPY / SIKA / Pidilite Dr. Fixit / asian paints / Thermax / STP/ Berger admixed with integral WPC or cementitious crystalline waterproofing compound in the affected area to seal all cracks and micro cracks if any and this shall be done by contractor at his own cost.(e) Apply additional coat of FOSROC Nitoproof 600 PF or equivalent or Asian paints/M/s MC Bauchemie /CIPY/SIKA/Pidilite Dr Fixit /Thermax /STP / Berger Please Enable Macros to View BoQ information |
| 52 | Material and labour for water proofing treatment to sunken floors of kitchen, toilets, laboratories, bath and WCs etc shall be as under:-(a) Remove all the existing sunken treatment and clean the sunken/lowered portion of RCC slab surface for full depth of sunken floor by wire brush .Chisel out any mortar sticking the surface .(b) All pipes passing through walls of sunken floors shall be laid before water proofing treament is carried out.One No. 50 mm dia , 35 cm long medium grade GI pipe with wire gauge on inside mouth shall be provided to each sunken portion.(C) Applying FOSROC Nitroproof 600 PF (Minimum 0.8 mm dft) over a priming coat of Nitroproof WB Primer or equivalent product of Asian Paints ,M/s MC Bauchemie /CIPY/ SIKA/Pidilite Dr Fixit/Thermax/STP/Berger applied as per manufacturer's instructions to bottom and full verticle sides of sunken floors.(d) Fill it with water and check for dampness and seepage . In case the slightest indications of seepage/leakage is noticed , the same shall be rectified by injection grouting to seal all cracks or application of Polymer modified mortar of FOSROC Nitobond SBR or equivalent of M/s MC Bauchemie / CIPY / SIKA / Pidilite Dr. Fixit / asian paints / Thermax / STP/ Berger admixed with integral WPC or cementitious crystalline waterproofing compound in the affected area to seal all cracks and micro cracks if any and this shall be done by contractor at his own cost.(e) Apply additional coat of FOSROC Nitoproof 600 PF or equivalent or Asian paints/M/s MC Bauchemie /CIPY/SIKA/Pidilite Dr Fixit /Thermax /STP / Berger Please Enable Macros to View BoQ information |