| 1 | Earth work in all kinds of soil within 50 M initial lead and 1.5 M initial lift including rough dressing and breaking clods to maximum 5cm to 7cm. And laying in layers not exceeding 0.3 M in depth and as per direction of the Engineer-in-charge. |
| 2 | Filling sand in foundation and plinth with well waterd and rammed etc…….complete. |
| 3 | Providing,laying and spreading and compacting with RSP Slag including all cost etc. all complete. |
| 4 | C.C -(1:4:8) using 40mm size H.G Metal with all cost, conveyancy including rigid smooth shuttering |
| 5 | C.C M-20 using 20mm size stone chips with all cost, conveyancy including rigid smooth shuttering |
| 6 | Providing HYSD Bar reinforcement for R.C.C work including straighting, cutting, binding, welding, tying the grills, laying and placeing the proper position as per approved design and drawing including cost, conveyancye of 18 to 20 gauge binding wire cost and conveyance HYSD bars complete in all respect as per specification for road and bridge and direction of engineers in charge. |
| 7 | Providing and laying of M40 grade 80 mm thick factory made interlocking pavers on floors with all cost,convey,labours,T&P etc…….complete. |
| 8 | Rigid smooth centring and shuttering……..etc. all complete. |
| 9 | Fixing tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement : 1 sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost of chquared floor tiles of approved shade |
| 10 | Providing ,fitting and fixing of stainless steel railing of 304 grade in hand railing using 50 mm dia and 2 mm thick circular pipes with balustrade with three horizontal bars and height of 0.90 mt. height as per instruction of engg- in -charge. |
| 11 | Extra for head load ( Beyond 50.00 mtr. to 100.00 mtr.) |
| 12 | For bhuin ghat Earth,stone,chips,metal and sand etc |
| 13 | For Area padhi ,teli and hadpoka ghat Earth,stone,chips,metal and sand etc |
| 14 | Cleaning lifting excavated earth by mechanical means |