| 1 | Carefully removing dense vegetation and heavy jungle growth from the lower moat walls and adjoining sides, including collection and disposal of the removed materials to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 2 | Excavation and leveling of the area to a depth of 0.30 metres, including removal of unwanted debris, and conveying and disposing of the excavated earth to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 3 | Carefully removing fallen huge size stones, including boulders and debris, from a depth of 4.70 metres, and collecting, conveying, and stacking the same at a designated location using pulley block and scaffolding, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 4 | Dismantling of undulated and collapsed brick flat form in lime mortar, including collection and disposal of the dismantled debris to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 5 | Carefully dismantling and removing the precariously standing, out-of-plumb lower moat wall from a height of 4.00 metres, including lifting, collecting, conveying, and stacking the serviceable stones for reuse, and disposing of unserviceable debris to a designated location away from the site, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 6 | Earthwork excavation in hard black cotton soil, including collection, conveying, and disposal of the excavated earth away from the fort premises by lorry, including loading and unloading charges, cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 7 | Providing and filling sand below foundation concrete, including watering, ramming, and consolidating to achieve proper compaction, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 8 | Providing and laying lime concrete in proportion 1:2:4 (1 part lime : 2 parts dry river sand : 4 parts 20 mm size brick aggregate) to a thickness of 100 mm as bed for stone flooring, including mixing, laying, leveling, compacting, curing, and finishing, including cost and conveyance of all materials, hire charges of tools and plants, labour charges, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 9 | Construction of coursed rubble masonry revetment wall using rough granite stones set in lime mortar 1:2 (1 part lime : 2 parts dry river sand), including dressing of stones, laying in courses, providing through and bond stones of size 24 × 24 × 39 cm at required intervals, jointing, curing, scaffolding, and all incidental works, including cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials |
| 10 | Reconstruction of fallen and out-of-plumb stone masonry of the lower moat wall using 70% available old stones and 30% new rough granite stones(approximate size 0.25 m × 0.25 m × 0.15 m), dressed, cut, and shaped to the required size and conforming to the existing cylindrical fortification profile (approximate size 0.80 m × 0.45 m × 0.45 m), set in lime mortar 1:2 (1 part lime : 2 parts dry river sand), including lifting, placing, proper bonding, jointing, curing, erection and dismantling of scaffolding, use of chain pulley blocks, and all incidental works. The item includes cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 11 | Backfilling and consolidating the rear side of the lower moat wall using gravel (size 3 mm to 6 mm) and 20% new rough granite (RR) stones(approximate size 0.25 m × 0.25 m × 0.15 m), for packing, including spreading in layers, watering, ramming, and proper consolidation to achieve required compaction, including all incidental works. The item includes cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 12 | Reconstruction of brick platform using new country bricks of size 230 mm × 110 mm × 75 mm in lime mortar 1:2 (1 part lime : 2 parts dry river sand) to form outer locking for the lower moat wall and retaining wall, preventing ingress of rainwater into the core, including proper laying, bonding, jointing, finishing, curing, and all incidental works. The item includes cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials |
| 13 | Providing and applying 20 mm thick plastering over the brick platform using lime mortar 1:2 (1 part lime : 2 parts dry river sand), finished with proper slope to facilitate drainage, including surface preparation, application, leveling, finishing, curing, and all incidental works. The item includes cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 14 | Pointing to stone masonry joints using lime mortar 1:1.5 (1 part lime : 1.5 parts dry river sand) for strengthening of the wall, including raking out joints, cleaning, filling, finishing, curing, and all incidental works. The item includes cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. |
| 15 | Providing, erecting, maintaining, and dismantling scaffolding at the moat water area and at the top of the fortification wall for execution of works under difficult site conditions, including all supports, staging, platforms, safety measures, and all incidental works. The item includes cost and conveyance of all materials, labour charges, hire charges of tools and plants, and all applicable taxes including GST, etc., complete in all respects as per the instructions of the Site-in-Charge and directions of the departmental officials. Please Enable Macros to View BoQ information |