| Sl. No. | Item Description |
| 1 | [10.1]Providing and laying of base course of floors consisting of 100 mm thick cement 1:8:16 and 100 mm sand or stone filling. [Through Rate] |
| 2 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] |
| 3 | [10.30.1]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 1. Light shade pigment using white cement [Through Rate] |
| 4 | [10.4]Providing and laying of screed of 50 mm thick cement concrete 1:8:16 to be laid below the topping. [Through Rate] |
| 5 | [10.49.1]Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge : 1. Flamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. [Through Rate] |
| 6 | [10.50.1]Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. 1. Polished Granite stone slab jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. [Through Rate] |
| 7 | [10.51]Providing and fixing granite stone in all shades 15mm to 18 mm thick in skirting /dado, risers of steps, pillars and wall facing, laid in any pattern as specified over base of 12mm thick cement coarse sand mortar 1:3 and jointed with white cement slurry mixed with pigment to match the shade of Granite including labour for fixing cramps pins and dowels etc. [Through Rate] |
| 8 | [10.58]Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete. [Through Rate] |
| 9 | [10.63.2]Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. 2. Size of Tile 600x600 mm [Through Rate] |
| 10 | [10.65]Providing and fixing glazed/ Ceramic/ Vitrified floor tiles with cement based high polymer modified quick-set tile adhesive (Water based) conforming to IS: 15477, in average 3mm thickness. [Through Rate] |
| 11 | [10.67.2]Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours and shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joint with white cement and matching pigments etc. complete. 2. Size of Tile 600x600 mm [Through Rate] |
| 12 | [10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate] |
| 13 | [11.4.2]10 mm thick cement plaster 2. 1:3 (1 cement: 3 fine sand) [Through Rate] |
| 14 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] |
| 15 | [11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand) [Through Rate] |
| 16 | [11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [Through Rate] |
| 17 | [11.59]Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. [Through Rate] |
| 18 | [11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) [Through Rate] |
| 19 | [11.69.2]Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. 2. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre [Through Rate] |
| 20 | [11.71.1]Wall painting on a cement plaster surface with acrylic emulsion paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work [Through Rate] |
| 21 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] |
| 22 | [11.82.1]Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work [Through Rate] |
| 23 | [11.98.1]Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali and fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives. 1. New work (Two or more coats applied @ 1.43 litre/ 10 sqm Over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm [Through Rate] |
| 24 | [12.101]Providing and fixing 50 cm long aluminium kicking plate of size 100x3.15 mm, anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade, with necessary screws etc. complete. [Through Rate] |
| 25 | [12.102.1]Providing and fixing aluminium handles, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade, with necessary screws etc. complete : 1. 125 mm [Through Rate] |
| 26 | [12.103.1]Providing and fixing aluminium hanging floor door stopper, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour and shade, with necessary screws etc. complete. 1. Single rubber stopper [Through Rate] |
| 27 | [12.12.2]Providing and Fixing decorative high pressure laminated sheet of plain / wood grain in gloss / matt/ suede finish with high density protective surface layer and reverse side of adhesive bonding quality conforming to IS : 2046 Type S, including cost of adhesive of approved quality. 2. 1.0 mm thick [Through Rate] |
| 28 | [12.132.1]Providing and fixing factory made uPVC white colour fixed glazed windows/ventilators comprising of uPVC multi-chambered frame and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape and size according to uPVC profile), , uPVC extruded glazing beads of appropriate dimension, EPDM gasket, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware`s and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing and direction of Engineer-in-Charge. (Single / double glass panes and silicon sealant shall be paid separately). Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made. 1. Fixed window / ventilator made of (small series) frame 47 x 50 mm & mullion 47 x 68 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area up to 0.75 sqm) [Through Rate] |
| 29 | [12.133.1]Providing and fixing factory made uPVC white colour casement/ Casement cum fixed glazed door comprising of uPVC multi-chambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape and size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, zinc alloy (white powder coated) 3D hinges and one handle on each side of panels along with zinc plated mild steel multi point locking having transmission gear, cylinder with keeps and one side key, G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws, etc. Profile of frame and sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware`s and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing and direction of Engineer-in-Charge. (Single / double glass panes and silicon sealant shall be paid separately). Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made. 1. Casement door with 3D hinges made of (big series) frame 67 x 64 mm & sash 67 x 110 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of door up to 2.00 sqm). [Through Rate] |
| 30 | [12.134.4]Providing and fixing factory made uPVC white colour sliding glazed window up to 1.50 m in height dimension comprising of uPVC multi-chambered frame with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape and size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame and sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware`s and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing and direction of Engineer-in-Charge. (Single / double glass panes, wire mesh and silicon sealant shall be paid separately). Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made. 4. Three track three panels sliding window with fly proof S.S wire mesh (Two Nos. glazed & one no. wire mesh panels) made of (big series) frame 116 x 45 mm & sash 46 x 62 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of window above 1.75 sqm). [Through Rate] |
| 31 | [12.158.2]Providing and fixing 12 mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS: 12823 Grade l Type ll, in panelling fixed in aluminium doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer-in-charge. 2. Pre-laminated particle board with decorative lamination on both sides [Through Rate] |
| 32 | [12.36.1]Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 1. 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws [Through Rate] |
| 33 | [12.39]Extra for providing lipping with 2nd class teak wood battens 25 mm minimum depth on all edges of flush door shutters (over all area of door shutter to be measured). [Through Rate] |
| 34 | [12.98.1]Providing and fixing aluminium sliding door bolts, ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868), transparent or dyed to required colour or shade, with nuts and screws etc. complete : 1. 300x16 mm [Through Rate] |
| 35 | [12.99.1]Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete : 1. 300x10 mm [Through Rate] |
| 36 | [13.21.2]Supply and fixing Windows frames (Chowkhats) including mullions consisting frame fabricated from sheet roll formed out of 1.2mm thick galvanized sheet as per IS:277 (Base steel as per IS 513) with zinc of 120 gm/sqm and Powder coated with pure Polyester powder up to 50 microns (as per approved colour), 3 Nos. 100mm butt - hinges 2mm thick, 6 Nos. 1.2mm thick CRCA electroplated stiffner, 6 Nos. M.S hold fast with split and tail welded to stiffner plate 200mm long, receiver for aldrop, weld less corner assembly with brackets and screws, M.S tie rod 50mm x 25mm to be fixed at bottom finished with powder coated total thickness of coating 0.6mm of approved shade, fixed in position including the cost of cement concrete for 1:2:4 for fixing lugs complete in all respects as per drawing, design, specification and entire satisfaction of Engineer-in-charge. 2. Door Frame of size 125mm x 60mm with 37mm wide double rebate for 35mm door shutter [Through Rate] |
| 37 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 38 | [13.41]Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories and stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). [Through Rate] |
| 39 | [17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam (53mm to 22.4 mm)Grading II with screenings Type “B” (11.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] |
| 40 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] |
| 41 | [18.28.1]Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot and cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers and connectors etc., with clamps at 1.00 metre spacing. This includes the costs of cutting chases and including testing of joints complete as per direction of the engineer in charge. 1. Concealed work, including cutting chases and making good the wall etc. 1216 (16 mm OD) pipe [Through Rate] |
| 42 | [18.28.2]Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot and cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers and connectors etc., with clamps at 1.00 metre spacing. This includes the costs of cutting chases and including testing of joints complete as per direction of the engineer in charge. 2. Concealed work, including cutting chases and making good the wall etc. 1620 (20 mm OD) pipe [Through Rate] |
| 43 | [18.28.3]Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot and cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers and connectors etc., with clamps at 1.00 metre spacing. This includes the costs of cutting chases and including testing of joints complete as per direction of the engineer in charge. 3. Concealed work, including cutting chases and making good the wall etc. 2025 (25 mm OD) pipe [Through Rate] |
| 44 | [18.28.4]Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot and cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers and connectors etc., with clamps at 1.00 metre spacing. This includes the costs of cutting chases and including testing of joints complete as per direction of the engineer in charge. 4. Concealed work, including cutting chases and making good the wall etc. 2532 (32 mm OD) pipe [Through Rate] |
| 45 | [18.29.1]Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot and cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers and connectors etc., with trenching, refilling and testing of joints complete as per direction of the engineer in charge. 1. External work 1216 (16 mm OD) pipe [Through Rate] |
| 46 | [18.29.2]Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot and cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers and connectors etc., with trenching, refilling and testing of joints complete as per direction of the engineer in charge. 2. External work 1620 (20 mm OD ) pipe [Through Rate] |
| 47 | [18.29.5]Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot and cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers and connectors etc., with trenching, refilling and testing of joints complete as per direction of the engineer in charge. 5. External work 3240 (40 mm OD ) pipe [Through Rate] |
| 48 | [18.29.6]Providing and fixing Polyethylene-Aluminium- Polyethylene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot and cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite material (engineering plastic blend and brass inserts wherever required) e.g. elbows, tees, reducers, couplers and connectors etc., with trenching, refilling and testing of joints complete as per direction of the engineer in charge. 6. External work 4050 (50 mm OD ) pipe [Through Rate] |
| 49 | [20.124.1]Supplying, erection, testing and commissioning of submersible pumping sets as per BIS SPECIFICATION No. 8034-1989 (as amended upto date for pumps) and IS 9283-1979 (as amended upto date for motor) the pump motor sets should be capable of pumping clear fresh cold water having characteristics as specified in Clause-4 of IS 8034-1989 and Clause 4.1 of IS 9283-1979. 1. LPM 400 Head 70 BHP 10.37 Say Round BHP 10.00 [Rate] |
| 50 | [20.71.1]Supply, erection, testing of Ceiling fans IS marked (as per IS code 374) with suitable GI pipe complete in all respects complete as per directions of Engineer-in-charge 1. 48\\" (1200mm) [Through Rate] |
| 51 | [20.72]Supplying, errection, testing of Exhaust fan (as per IS code 374) having a capacity of 45 cubic metre per minute complete with suitable G.I sheet ducting in structure confirming to latest IS specifications complete in all respect to satisfaction of Engineer-in-charge. [Through Rate] |
| 52 | [21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge [Through Rate] |
| 53 | [21.87.1.2]Constructing brick masonry road gully chambers as per standard drawings (as per sizes given below) including dressing of beds and sides of chambers to exact profiles, 15cm thick lime concrete 16:24:100 (as per specified in item No.10.6) in foundations 1st class brick work laid in cement sand mortar 1:5, 40 mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of 1.5mm thick neat cement laid in one operation to the topping, the entire inner surface of the chamber rendered with neat cement not less than 12mm in thickness of 1:2 cement sand plaster and finished with floating coat of neat cement 1 mm thick left absolutely smooth polished and correct to templates including labour for fixing the C.I. road gully grating and frame including painting with coal tar (as Specified in item No. Item 21.48) complete to the requirement of the Engineer in-charge 1.2. Single road gully chamber - Size.-610 mmx457 mmx1105mm [Through Rate] |
| 54 | [22.10.1.1]Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required : 1.1. Kitchen sink with drain board 510x1040 mm bowl depth 250 mm [Through Rate] |
| 55 | [22.102.2]Providing and fixing C.P. brass shower rose with 15 or 20 mm inlet : 2. 150 mm diameter [Through Rate] |
| 56 | [22.103.2]Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 2. 20 mm nominal bore [Through Rate] |
| 57 | [22.103.3]Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 3. 25 mm nominal bore [Through Rate] |
| 58 | [22.106.1]Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 gms. 1. 15 mm nominal bore [Through Rate] |
| 59 | [22.108.1]Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 1. 15mm nominal bore [Through Rate] |
| 60 | [22.109]Providing and fixing C.P. Brass extension nipple (size 15mmx50mm) of approved make and quality as per direction of Engineer-in-charge. [Through Rate] |
| 61 | [22.118]Providing and fixing PTMT towel ring trapezoidal shape 215 mm long, 200 mm wide with minimum distances of 37 mm from wall face with concealed fittings arrangement of approved quality and colour, weighing not less than 88 gms. [Through Rate] |
| 62 | [22.123.1.2]Providing and fixing PTMT grating of approved quality and colour. 1.2. Circular type 125 mm nominal dia with 25 mm waste hole [Through Rate] |
| 63 | [22.15]Providing and fixing CP Brass 32mm size Bottle Trap of approved quality and make and as per the direction of Engineer-in-charge. [Through Rate] |
| 64 | [22.166.3.1]Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber with water tight C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design: 3.1. 180x150 mm size P type With common burnt clay non-modular bricks of class designation 7.5 [Through Rate] |
| 65 | [22.168.2]Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 2. 150 mm dia. R.C.C. pipe [Through Rate] |
| 66 | [22.168.3]Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 3. 250 mm dia. R.C.C. pipe [Through Rate] |
| 67 | [22.173.1]Constructing masonry Chamber 30x30x50 cm inside, in brick work in cement mortar 1:4 (1 cement :4 coarse sand) for stop cock, with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design : 1. With common burnt clay non-modular bricks of class designation 7.5 [Through Rate] |
| 68 | [22.181]Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. [Through Rate] |
| 69 | [22.190.1.1]Constructing brick masonry manhole in cement mortar 1:4 ( 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 coarse sand (Zone-III) : 8 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement complete as per standard design : 1.1. Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg) : With common burnt clay non-modular bricks of class designation 7.5 [Through Rate] |
| 70 | [22.2.1]Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required:- 1. White vitreous chinaware Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer [Through Rate] |
| 71 | [22.210.2]Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : 2. Rectangular shape 453x357 mm [Through Rate] |
| 72 | [22.212.1.2]Providing and fixing in position best Indian make coat and hat hooks fixed into wall with C.P. brass screws and rawl plugs etc. complete including cutting and making good the walls etc. 1.2. C.P Brass Two Way [Through Rate] |
| 73 | [22.33]Providing and fixing white vitreous chinaware extended wall mounting water closet of size 780x370x690 mm of approved shape including providing and fixing white vitreous chinaware cistern / PVC cistern (with brass fitting) into the wall with dual flush fitting, of flushing capacity 3 litre/ 6 litre (adjustable to 4 litre/ 8 litres), including seat cover, and cistern fittings, nuts, bolts and gasket etc complete. [Through Rate] |
| 74 | [22.38]Providing and fixing 8 mm dia C.P. / S.S. Jet with flexible tube up to 1 metre long with S.S. triangular plate to European type W.C. of quality and make as approved by Engineer - in - charge. [Through Rate] |
| 75 | [22.42.1]Providing and fixing toilet paper holder : 1. C.P. brass [Through Rate] |
| 76 | [22.83]Cutting holes up to 15x15 cm in R.C.C. floors and roofs for passing drain pipe etc. and repairing the hole after insertion of drain pipe etc. with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete so as to make it leak proof. [Through Rate] |
| 77 | [22.98.3]Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 3. 32 mm nominal bore. [Through Rate] |
| 78 | [22.98.4]Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 4. 40 mm nominal bore [Through Rate] |
| 79 | [22.98.5]Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) : 5. 50 mm nominal bore [Through Rate] |
| 80 | [23.22.3.3]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 3.3. Supply and erection of sheet steel enclosures 1pole/2 pole/4 pole on wall/on existing pedestal complete as required. TPN enclosure suitable for TP , TPN or FP MCB [Through Rate] |
| 81 | [23.22.4.10]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 4.10. Supply and erection of double door sheet steel enclosure distribution board suitable for MCBS and ELCBS etc. recessed in wall including bonding to earth with all labour and material required to complete the job in all respect up to the entire satisfaction of the Engineer-in-Charge of the work. Vertical TPN DB Double Door 6 way ( 8 incoming 3phase*6 outgoing) [Through Rate] |
| 82 | [23.22.4.7]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 4.7. Supply and erection of double door sheet steel enclosure distribution board suitable for MCBS and ELCBS etc. recessed in wall including bonding to earth with all labour and material required to complete the job in all respect up to the entire satisfaction of the Engineer-in-Charge of the work. TPN DB Horizontal type Double Door 8 way ( 8 incoming 3phase*8 outgoing) [Through Rate] |
| 83 | [23.22.5.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole [Through Rate] |
| 84 | [23.22.5.8]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.8. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 40 amp to 63 amp. MCBs FOUR POLE [Through Rate] |
| 85 | [23.22.6.2]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 6.2. Supply and erection double pole/Four pole Residual (RCCB/ELCB) on 240/415V, 5Hz. AC supply installed in existing sheet steel enclosures including making necessary connections and bonding to earth with all labour and material required to complete the job in all respect up to the entire satisfaction of the Engineer-in-Charge of the work. DP RCCB 30ma sensitivity , 40 A [Through Rate] |
| 86 | [23.3.6.5]COPPER WIRING IN PVC CONDUIT (SURFACE/RECESS) 6.5. Wiring main and sub mains in two single core for phase and neutral wire and one single core for earth wire PVC insulated Copper conductor cable 1100 Volts grade in PVC Conduit etc as required. 1 run of Size 10 Sqmm(1/3.50 mm) [Through Rate] |
| 87 | [23.4.1.1]COPPER WIRING WITH MODULAR SWITCHES IN PVC CONDUIT (SURFACE/RECESS) 1.1. Wiring for Light/Fan/call bell point with modular type switch/socket and GI box, Modular type face plate etc in 1.5 sqmm FRLS PVC insulated copper conductor cable in 1.6 mm thick PVC conduit pipe. Group A [Through Rate] |
| 88 | [23.4.2.1]COPPER WIRING WITH MODULAR SWITCHES IN PVC CONDUIT (SURFACE/RECESS) 2.1. Wiring for Twin control light point with 2 nos , 2-ways, 5 amp. Modular switch GI box and modular face plate in 1.5 sqmm FRLS PVC insulated copper conductor cable in 1.6 mm thick PVC conduit pipe. Group A [Through Rate] |
| 89 | [23.4.3.3]COPPER WIRING WITH MODULAR SWITCHES IN PVC CONDUIT (SURFACE/RECESS) 3.3. Wiring for Light/Fan/call bell point in 1.5 sqmm FRLS PVC insulated copper conductor cable in 1.6 mm thick PVC conduit pipe, without separate control switch Group C [Through Rate] |
| 90 | [23.4.4.3]COPPER WIRING WITH MODULAR SWITCHES IN PVC CONDUIT (SURFACE/RECESS) 4.3. Wiring in PVC conduit system for 3-pin 5amp. Plug point by using 2 no 1.5 sqmm FRLS copper wire and 1 no 1.5 Sqmm FRLS copper wire , including providing 1 no 5/6 Amp 3/5 pin Modular type socket and 1 no 5/6 Amp Modular type switch required GI Box ,modular face plate etc complete as required Group C [Through Rate] |
| 91 | [23.4.5.3]COPPER WIRING WITH MODULAR SWITCHES IN PVC CONDUIT (SURFACE/RECESS) 5.3. Wiring in PVC conduit system for 3-pin 15amp. Plug point by using 2 no 4 sqmm FRLS copper wire and 1 no 4 Sqmm FRLS copper wire for earthling , including providing 1 no 15/16 Amp 3/6 pin Modular socket and 1 no 15/16 Amp Modular switch required GI Box , modular face plate etc complete as required Group C [Through Rate] |
| 92 | [23.7.6.2]PVC CONDUIT PIPE ONLY (SURFACE OR RECESSED) FOR ELECTRICAL POINTS 6.2. Supply and erection of PVC CONDUIT ISI marked (Medium) recessed in wall/ceiling etc. including the cost of PVC bends, inspection boxes, iron hooks and cement concrete etc. complete in all respect up to the entire satisfaction of Engineer-in-Charge of work. PVC pipe of 25 mm dia. [Through Rate] |
| 93 | [23.7.6.4]PVC CONDUIT PIPE ONLY (SURFACE OR RECESSED) FOR ELECTRICAL POINTS 6.4. Supply and erection of PVC CONDUIT ISI marked (Medium) recessed in wall/ceiling etc. including the cost of PVC bends, inspection boxes, iron hooks and cement concrete etc. complete in all respect up to the entire satisfaction of Engineer-in-Charge of work. PVC pipe of 40 mm dia. [Through Rate] |
| 94 | [23.8.11.7]FITTING AND ACCESSORIES 11.7. Providing and fixing modular type accessories of approved make in existing box including fixing and making necessary connections, complete in all respect. step type Fan Regulator 2 modules 300 watt [Through Rate] |
| 95 | [24.1.1]EARTHING AND LIGHTENING ARRESTOR 1. Earthing with GL earth pipe 4.5 m long and 40 mm dia with masonry enclosures on the top etc. (but without charcoal or coke and salt) as required. [Through Rate] |
| 96 | [24.1.12]EARTHING AND LIGHTENING ARRESTOR 12. Supplying and laying 6 S.W.G G.I. wire at 0.50 m below ground level from earth electrode including thimbles, soldering etc. as required. [Through Rate] |
| 97 | [24.1.2]EARTHING AND LIGHTENING ARRESTOR 2. Extra for using salt and char coal/coke for pipe earth electrode as required. [Through Rate] |
| 98 | [24.1.8]EARTHING AND LIGHTENING ARRESTOR 8. Providing and fixing 25 mm x 3mm G.I. strip on surface or in recess for connections etc. as required with all labour and material. [Through Rate] |
| 99 | [24.14.38]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE ONSURFACE/ EXISTING CABLE TRAY COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 38. 35 Sq mm 3.5 core (Arm.) [Through Rate] |
| 100 | [24.2.7.3]LT CABLE 7.3. Supply and erection of suitable compression type brass cable glands for underground Cable :- 25 sqmm to 50 sqmm Cable 2 to 4 Core [Through Rate] |
| 101 | [26.34]Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth, mixed with farm-yard manure, supplied at the rate of 1.62 cum per 18 sqm, DAP 0.6kg, Chlorpyriphos 20%EC@ 0.20 litre per 18 sqm and supplying and planting hedge at 30 cm apart in two rows @ 202 no. well trimmed bushy ,multi-branched ,30 cm to 45 cm in height plants to be supplied in 15 cm x 15 cm poly bags per 18 sqm . [Through Rate] |
| 102 | [26.9.4]Turfing lawns with fine grassing ( selection no.1/ Bermuda and Mexican/Neelgiri grass )including ploughing, dressing including breaking of clods, removal of rubbish, dressing and supplying of selection no. 1 / Bermuda doob grass and Mexican/Neelgiri grass roots, including supplying and spreading of farmyard manure at the rate of 0.60 cum per 100 sqm, maintenance till weed free turf is formed 4. Providing and fixing Selection no. 1 grass turf with earth 50mm to 60mm thickness and ramming with required wooden tools, rolling with light roller to make the surface smooth and even [Through Rate] |
| 103 | [28.19]Providing and applying integral crystalline (dry shake) of hydrophilic in nature for waterproofing treatment to the RCC structures like basement raft, foundation slab, sewage and water treatment plant slab, warehouses floor, parking structures and water tank base slab etc. sprinkled @0.60kg per sqm or higher as recommended by the manufacturer`s specification over the lean concrete of above cited structures. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e. by reducing permeability of concrete by more than 85%, compared control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline dry-shake shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the Engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. [Through Rate] |
| 104 | [28.20.1]Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservoir, sewage and water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fibre brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e. by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. 1. For vertical surface two coats @ 0.70 kg per sqm [Through Rate] |
| 105 | [28.43]Providing and fixing Heat Resistant Terrace Tiles (300 mm x 300 mm x 20 mm) with SRI (solar refractive index) ) 78, solar reflection ) 0.70 and initial emittance ) 0.75 on waterproof and sloped surface of terrace, laid on 20 mm thick cement sand mortar in the ratio of 1:4 (1 cement : 4 coarse sand) and grouting the joints with mix of white cement and marble powder in ratio of 1:1, including rubbing and polishing of the surface up to 3 cuts complete, including providing skirting up to 150 mm height along the parapet walls in the same manner. [Through Rate] |
| 106 | [32.69.2]Providing and laying on smooth roof surface with extruded polystyrene (XPS) thermal insulating boards with ship lap joining on length side, (having thermal conductivity of 0.028 W/m.K on 90 days aging at 24 deg.C as per ASTM C518, compressive strength of over 250 kpa as per ASTM D1621, tensile strength of over 300 kpa as per ASTM D1623 and has flammability of Class B2 as per DIN 4102, water absorption of less than 1% as per ASTM D2842, over a coat of cold adhesive like CPRX compound, laying 400 G polythene sheet over PUF slab and providing a wearing course of 40 mm thick cement screed 1: 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) in chequered rough finish, in panels of 2.5 m x 2.5 m and embedding with 24 G wire netting and sealing the joints with polymerized mastic, all complete as per direction of engineer-in-charge 2. 75 mm thick Extruded polystyrene rigid insulation board [Through Rate] |
| 107 | [34.1.1]Cast in Situ Cement Concrete M20 KerbConstruction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 1. Using Concrete Mixer [Through Rate] |
| 108 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 109 | [4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate] |
| 110 | [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate] |
| 111 | [4.39]Providing and injection chemical emulsion for PRE-CONSTRUCTIONAL ant termite treatment (excluding the cost of chemical emulsion) and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filing junction of wall and floor, along with the external perimetre of building, expansion joints surrounding of pipes and conduit etc, complete (plinth area of the building at ground floor only shall be measured) using Chlorpyriphos/ Lindane emulsifiable concentrate of 20% [Through Rate] |
| 112 | [5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) [Through Rate] |
| 113 | [5.29.2]Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : 2. Of area beyond 3 sq. metres [Through Rate] |
| 114 | [5.43.1]Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. 1. For thickness of tiles 10 mm to 25 mm [Through Rate] |
| 115 | [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate] |
| 116 | [5.70]Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. [Through Rate] |
| 117 | [5.8.3]Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): 3. From brick work in cement mortar [Through Rate] |
| 118 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] |
| 119 | [6.13]Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling and dressing and finishing the top smooth. [Through Rate] |
| 120 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 121 | [6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 122 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level [Through Rate] |
| 123 | [6.25.2]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 2. All works above plinth level up to floor IV level [Through Rate] |
| 124 | [6.26.1]Extra for providing richer mixes up to plinth and at all floor levels. 1. Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum) [Through Rate] |
| 125 | [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate] |
| 126 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] |
| 127 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate] |
| 128 | [6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate] |
| 129 | [6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts [Through Rate] |
| 130 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] |
| 131 | [6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate] |
| 132 | [6.8.1]Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 1. 50 mm thick [Through Rate] |
| 133 | [7.22.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] |
| 134 | [7.28.2]Half brick masonry with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level. 2. Cement mortar 1:4 (1 cement :4 coarse sand) [Through Rate] |
| 135 | [7.30]Extra for providing and placing in position 2 Nos. 6mm dia. M.S. bars at every third course of half brick masonry. [Through Rate] |
| 136 | [8.27.2]Providing edge moulding to 18 mm thick marble stone counters, Vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge. 2. Granite work [Through Rate] |
| 137 | [9.18]Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1 m x1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the outlet complete. [Through Rate] |
| 138 | [9.46.4]Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts and bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound , jointing tapes , finishing with jointing compound in 3 layers covering up to 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer`s specification and also including the cost of making openings for light fittings, grills, diffusers, cut outs made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with : 4. Fully Perforated Gypsum Plaster Board of size 1200 x 2400x12.5 mm having approx. 15 % perforated area with perforation size and pattern as approved by the Engineer-in-charge and as per manufacturer s specification, with all 4 side tapered and backed by acoustical tissue with NRC value not less than 0.60 [Through Rate] |
| 139 | [9.49.2]Providing and fixing Gl Clip in Metal Ceiling System of 600x600 mm module which includes providing and fixing `C` wall angle of size 20x30x20 mm made of 0.5 mm thick pre painted steel along the perimeter of the room with help of nylon sleeves and wooden screws at 300 mm centre to centre, suspending the main C carrier of size 10x38x10 mm made of G.I steel 0.7 mm thick from the soffit with help of soffit cleat 37x27x25x1.6 mm, rawl plugs of size 38x12 mm and C carrier suspension clip and main carrier bracket at 1000 mm c/c. Inverted triangle shaped Spring Tee having height of 24 mm and width of 34 mm made of Gl steel 0.45 mm thick is then fixed to the main C carrier and in direction perpendicular to it at 600 mm centres with help of suspension brackets. Wherever the main C carrier and spring T have to join, C carrier and spring T connectors have to be used. All sections to be galvanized @ 120 gms/sqm (both side inclusive), fixing with clip in tiles into spring T with : 2. GI Metal Ceiling Clip in plain Bevelled edge global white colour tiles of size 600x600 and 0.5 mm thick with 25 mm height, made of G I sheet having galvanizing of 100 gms/ sqm (both sides inclusive) and 20% perforation area with 1.8 mm dia holes and having NRC of 0.5, electro statically polyester powder coated of thickness 60 microns (minimum), including factory painted after bending and perforation. [Through Rate] |
| 140 | RECOVERY OF OLD IPB |
| 141 | Providing and fixing of Hitachi split AC of 1.5 Ton 3 star non-inverter (Model no. 318PCAIBA1) complete in all respect up to the entire satisfaction of Engineer-in-charge of the work.. |
| 142 | Providing and fixing of Hitachi split AC of 1.8 Ton 2 star non-inverter (Model no. 222PCAIBA1) complete in all respect up to the entire satisfaction of Engineer-in-charge of the work. |
| 143 | Providing and fixing of copper pipe fo connecting outdoor to indoor unit complete in all respect up to the entire satisfaction of Engineer-in-charge of the work. |
| 144 | Providing, fixing, jointing and testing uPVC mineral filled floor traps of self cleansing design with water seal not less than 50 mm., with or without vent, jointing with push fit rubber ring socket fittings complete, cutting chases / hole in floors / slabs and bringing the same in proper condition and shape after placing the trap in right position in case of suspended / open plumbing or setting the trap in 1:2:4 CC in case of concealed plumbing , etc. complete, as required. The trap shall be of following sizes: Temporary airtight PVC cover to be provided to prevent dirt entry |
| 145 | Providing and fixing uPVC pipe conforming to IS:4985 (10 kg/sq cm) including all fittings, This includes jointing of pipes and fittings with one step solvent cement, trenching, refilling and testing of joints complete as per direction of Engineer in Charge and as per layout. |
| 146 | Providing and fixing uPVC pipe conforming to IS:4985 (10 kg/sq cm) including all fittings, This includes jointing of pipes and fittings with one step solvent cement, trenching, refilling and testing of joints complete as per direction of Engineer in Charge and as per layout. 110mm |
| 147 | Providing and fixing floor drain fixed with cement mortar complete in all respect........ 110X50 |
| 148 | Providing and fixing connection pipe with angle valve cock, brass body, 18-inch length, suitable for geysers and countertop faucets/water taps, complete set (Pipe with Valve) model GCPVC3308, with necessary fittings as per manufacturer’s specifications. |
| 149 | Providing and fixing of approved coloured verticle type hot water 25 ltr geysers. The inner container shall be made of copper sleeve with PUF insulation between inner and outer container, element pipe and heating element, pressure cum vaccume release, thermostat and thermal cutout arrangements and fusible plug. The outer container shall be of powder coated finish with all other accessories including fixing brackets complete as required. |
| 150 | Providing and installation of 3-litre capacity instant water heater (geyser) for kitchen use, suitable for wall mounting, complete with inlet/outlet connections, safety valve, heating element, thermostat, indicator lights, and all necessary fittings. Unit to be of approved make with ISI certification, including testing and commissioning for proper operation. |
| 151 | Providing Supply and installation of Jaquar OPAL PRIME Series normal flow exposed part kit for 2-way diverter, model OPP-15119PM, chrome finish, complete with operating handle, wall flange, and connection arrangements to concealed diverter body, as per manufacturer’s specifications, including testing and commissioning for proper operation. |
| 152 | Supply and installation of SPAZIO Flora brass heavy-duty hot and cold kitchen sink mixer tap, with matt black 360° flexible silicone spout, single-lever operation, complete with mounting hardware, inlet hoses, and all necessary accessories. Installation to be as per manufacturer’s specifications, including testing and commissioning for leak-free performance. |
| 153 | Providing and fixing RUHE Square Double Bowl Kitchen Sink, size 32` x 20` x 8`, made of 304-grade stainless steel, satin finish, complete with waste couplings, drainage accessories, and all necessary fittings as per manufacturer’s specifications.` |
| 154 | Supply, Installation, testing and Commissioning of the following lighting fixtures with all fixing accessories etc. complete as required.(NS)…………… 25 Watt - Cove Glow LED Strip light (in IP20 and IP44 versions, with long system life of 30000 burning hours and 50000 burning hours) (MAKE - Philips, Havells, WIPRO) |
| 155 | Supplying and fixing of following types LED electronic driver in the existing LED Strip light downlighter eLc as required. (24 WATT 12 VOLT 2 A LED STRIP DRIVER PH1258) |
| 156 | Supply, Installation, testing and Commissioning of the following lighting fixtures with all fixing accessories etc. complete as required.(NS)…………… 12-Watt Recessed LED (ROUND TYPE LED LIGHT) Philips, Havells, WIPRO) |
| 157 | Supply, Installation, testing and Commissioning of the following lighting fixtures with all fixing accessories etc. complete as required.(NS)…………… 100-Watt FLOOD LIGHT Philips, Havells, WIPRO) |
| 158 | Supply, erection, testing of 600mm dia Ceiling fans IS marked with suitable GI pipe complete in all respects complete as per directions of Engineer-in-charge. Please Enable Macros to View BoQ information |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy