| 1 | Dismantling and removing RCC roof slab including & stacking the useful materials for reuse and removing the debris far away from working area with all leads, lifts & delifts etc. complete as per direction of Engineer-in-Charge. |
| 2 | Filling foundation and plinth with sand including watering & ramming with all labour and T&P’s with all leads, lifts and delifts including cost carriage & royalty of all materials etc. Complete asper direction of Engineer-in-Charge |
| 3 | Cement concrete (1:3:6) using 4cm size hard granite crusher broken metal free from weathered skin surface of uniform colour and texture from approved quarry and approved quality conferming to specification, mixing by concrete mixture including hoisting and laying concrete in position with all leads, lifts, and delifts including cost conveyance, royalty and taxes of materials including dewatering by suitable means, supplying T&P quaring for specified period with hire and running charges of machineries required for the work, construction and maintenance of coffer dam and approach road if required till completion of work etc. Complete as per direction of Engineer-in-Charge. |
| 4 | Providing and laying cement concrete (1:1.5:3) with 12mm downgraded hard granite chips free from weathered skin and other deleterious materials of approved quality of uniform colour and texture aggregate and sharp sand of approved grading and quality for RCC/CC confirming to the specifications with all leads, lifts delifts and and mixing by mechanical /manual means including cost, carriage, royalties and taxes of all materials including de watering by suitable means mixing concrete by concrete mixer and placing in position with all T&P curing for required period by suitable means, etc. Complete as per direction of Engineer-in-Charge. |
| 5 | Labour charges for straighting, cutting, bending, binding and tying the grils and placing in position for fabrication and finishing of reinforcement including topping when necessary including supply of binding wire 18 to 20 gauge with all leads, lifts from binding yard including cost, carriage of un coated HYSD bar confirming to Fe 415 grade including over lapping, and wastage, welding etc. Complete as per direction of the Engineer-in-Charge. |
| 6 | Rigid smooth centering and shuttering for RCC/CC work including false work and dismantling them after casting and removing the debris away from the working area and stacking the useful materials for reuse including cost, carriage, royalty and taxes of all materials with all labour to the site of work etc. Complete as per direction of the Engineer-in-Charge. |
| 7 | 2.5cm thick grading cement concrete (1:2:2) on roof slab with 4.75mm size hard crusher broken granite chips from approved quarry of approved quality including cost carriage royalty and all other taxes of all materials to the site of work and curing etc. complete as per direction of Engineer-in-Charge. |
| 8 | 6mm thick cement plaster in Cement mortar (1:4) over brick work including close deep chiping with slury treatment with cost, conveyance, royalty and all other taxes of the materials to the site of work etc. complete including curing upto required period etc. as per direction of Engineer-in-Charge. |
| 9 | 16mm thick cement plaster in Cement mortar (1:6) over brick work including racking out joints including cost, conveyance, royalty and scaffolding, staging with labour all other taxes of the materials to the site of work etc. complete including curing upto required period etc. Complete as per direction of Engineer-in-Charge. |
| 10 | 12mm thick cement plaster in Cement mortar (1:6) over brick work including racking out joints including cost, conveyance, royalty and scaffolding, staging with labour all other taxes of the materials to the site of work etc. complete including curing upto required period etc. Complete as per direction of Engineer-in-Charge. |
| 11 | Cement washing one coat over plaster surface including cost of cement, brush etc. and curing upto the required period with scaffolding , staging etc. and all other materials required for the work etc. as per direction of Engineer-in-Charge. |
| 12 | Distempering two coats to wall with distemper of approved shade on new work to given an even shade including cost of distemper, brush and all other materials required for the work etc. Complete as per direction of Engineer-in-Charge. |
| 13 | Wall Painting two coats with approved weather seal paints of approved colour, shade on new work to give an even shade including cost of paint, labour, staging and scaffolding charges, carriage and taxes of all materials and cost of all labour with T&P etc. Complete as per the specification & direction of Engineer-in-Charge. |
| 14 | Labour for taking out wooden/steel door frames and refixing the same after necessary repair and making good to the damage wall etc. complete as per direction of Engineer-in-Charge. |
| 15 | Labour for taking out wooden/steel window frames and refixing the same after necessary repair and making good to the damage wall etc. complete as per direction of Engineer-in-Charge. |
| 16 | Dressed and seasoned Sal-wood work framed and fixed (wrought and put up) in trusses, purlins, frames of doors and windows and beams including cost, carriage and all other taxes of all materials to the site of work etc. complete asper direction of Engineer-in-Charge. |
| 17 | 32mm thick Piasal or local teak wood paneled shutters with moulded pananel with labour iron fitting and wooden hinged cleats etc. fitted and fixed complete in all respect including cost carriage and all other taxes of all materials to the site of work etc. complete asper direction of Engineer-in-Charge. |
| 18 | Painting two coats with approved paint in new or old wood work over one coat of priming including cost of primer, paint and all other materials required for the work with all labour charges etc. complete asper direction of Engineer-in-Charge. |
| 19 | Supplying, fitting & fixing of window grills including cost, carriage, fabrication charges with all labour and T&P required for the work to the site etc. Complete as per direction of Engineer-in-Charge. |
| 20 | Supplying fitting and fixing of Oxidised mild steel Aldrop in door shutters including cost of screws etc. complete asper direction of Engineer-in-Charge. |
| 21 | Supplying fitting and fixing of Oxidised mild steel tower bolt for door and window shutter including screws etc. complete asper direction of Engineer-in-Charge. (Doors) |
| 22 | Supplying fitting and fixing of Oxidised mild steel tower bolt for door and window shutter including screws etc. complete asper direction of Engineer-in-Charge. (Windows) |
| 23 | Supplying and fixing of Oxidised mild steel handle for door and window shutters including screws etc. complete asper direction of Engineer-in-Charge. (Doors) |
| 24 | Supplying and fixing of Oxidised mild steel handle for door and window shutters including screws etc. complete asper direction of Engineer-in-Charge. (Windows) Please Enable Macros to View BoQ information |