| 1 | Demolishing reinforced cement concrete manually / by mechanical means including stacking of steel bars properly and disposal of unserviceable material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge. |
| 2 | Labour for cutting C.I. pipe with steel saw. 100 mm diameter C.I. pipe. |
| 3 | Dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for re-plastering or re-pointing including disposal of rubbish to the dumping ground with all leads and lifts etc.complete as per direction of the Engineer- in-charge. |
| 4 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge. Bars upto 12 mm diameter |
| 5 | Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound, as directed by Engineer-in-Charge and consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. |
| 6 | Centering shuttering including struttings, propping etc. and removal of form work for: Weather shade, Chajjas, corbels etc., including edges. |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more Note: Wastage and unauthorised overlaps shall not be paid for. Annealed steel wire required for binding or tack welding shall not be measured, its cost being included in the rate of reinforcement. Whereever tack welding is used in lieu of binding, such welds shall not be measured. Chairs, separators etc. shall be provided as directed by Engineer-in-Charge and measured seperately and paid for. |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 9 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground with all leads and lifts including finishing even and smooth and curing complete as per direction of the Engineer in charge:- With cement mortar 1:3 ( 1 cement : 3 fine sand ). |
| 10 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge. 75 mm average thickness |
| 11 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge. 25 mm average thickness |
| 12 | Providing and inserting 12mm dia galvanised steel injection nipple in honey comb area and along crack line including drilling of holes of required diametre (20mm to 30mm) up to depth from 30mm to 80mm at required spacing and making the hole & crack dust free by blowing compressed air, sealing the distance between injection nipple with adhesive chemical of approved make and allow it to cure complete, as required and as per direction of the Engineer-in-charge. |
| 13 | Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honeycomb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per direction of the Engineer- in- Charge. (The payment shall be made on the basis of actual weight of approved grout injected.) Stirrer mixed SBR Polymer (of approved make) modified Cement slurry made with Shrinkage Compensating Cement in concrete/RCC work |
| 14 | Providing and applying crystalline mortar by mixing in the ratio of 4.5 : 1 (4.5 parts crystalline mortar : 1 part water) for the treatment of faulty construction joints, cracks, tie rod holes and spalled & honeycombed surface of RCC underground structures like basement, water tanks, bridge deck etc. to ensure water tightness. The crystallie mortar shall conform to the EN 1504-3 having compressive strength Class R4 > 45 MPa and adhesive bond strength Class R3 > 1.5 MPa. The work shall be carried out all complete as per specification and the direction of the Engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. For sealing cracks and faulty construction joints, by preparing the surface, making U-shape groove size of 25x25mm and then priming the surface with integral crystalline slurry @0.05kg per running meter and while the surface is tacky then filling the groove upto top edge with crystalline mortar @1.50kg per running meter. Once crystalline mortar is touch dry then finally applying two coats of integral crystalline slurry @0.05kg per running meter per coat on treated surface. |
| 15 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and as per direction of Engineer-In-charge complete in all respect. SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer |
| 16 | Grading roof for water proofing treatment complete as required as per direction of the Engineer-in-charge with : Cement concrete 1:2:4 (1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size) |
| 17 | Providing and applying cement slurry mixed with SBR based multipurpose polymer on CC / RCC / Brick works in joints to receive new and fresh CC / RCC / Cement Mortar / Brick works including cleaning the surface as required complete as per direction of the Engineer in charge. |
| 18 | Grading roof for water proofing treatment complete as required as per direction of the Engineer-in-charge with : Cement mortar 1:4 (1cement : 4 fine sand) |
| 19 | Extra for providing and mixing water proofing material in cement concrete work in doses by weight (per 50 kg of cement) of cement as per manufacturer's specification |
| 20 | Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 fine sand with polymer minimum 2% by wt. of cement used) as per specifications and as per direction of the Engineer-in-charge.Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/ mm2) 12 mm average thickness. |
| 21 | Extra for providing and laying of Fibre glass cloth over bonding coat of approved adhesive as per item no. 17.30, when the coat is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. |
| 22 | Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/ system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineer-in-Charge. |
| 23 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes (working pressure 4 kg/cm2) conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion etc. complete as per direction of Engineer-in-charge: Single socketed pipe - 110 mm OD |
| 24 | Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type-A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion etc. complete as per direction of Engineer-in-charge : Bend 87.5°. 110mm |
| 25 | Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50mm hard wood plugs, screwed with M.S. screws of required length including cutting brick work and fixing with cement mortar 1 : 4 (1cement : 4 fine sand) making good the wall etc. complete as per direction of Engineer-in-charge. 110 mm |
| 26 | Providing and fixing 600x120x5mm glass shelf with edges round of supported on anodised aluminium angle frame with C.P. brass brackets and guard rail complete fixed with 40 mm long screws, rawl plugs etc., complete. |
| 27 | Providing and fixing C.P. brass shower rose with 15 or 20 mm inlet: 100 mm diameter |
| 28 | Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931 15 mm nominal bore |
| 29 | 12 mm cement plaster of mix. Cement mortar 1:4 (1 cement : 4 fine sand) |
| 30 | 12 mm thick plain cement mortar bands in cement mortar 1:4 (1 cement : 4 fine sand): Raised Band |
| 31 | Providing and fixing curtain rods of 1.25 mm thick chromium plated brass plate, with two chromium plated brass brackets fixed with C.P. brass screws and wooden plugs, etc., wherever necessary complete : 20 mm dia. |
| 32 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 33 | Applying one coat of water thinnable cement primer of approved brand and manufacturer on wall surface complete. Water thinnable cement primer |
| 34 | Wall painting with acrylic plastic emulsion paint of approved brand and manufacture to give an even shade: Two or more coats on new work |
| 35 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work Please Enable Macros to View BoQ information |