| 1 | Supply of armoured CAT6 cable.Specifications as per Annexure III-A. |
| 2 | Supply of armoured OFC 8core cable.Specifications as per Annexure III-B. |
| 3 | Supply of Armoured XLPE power cable 3 core * 1.5 mm2.Specifications as per Annexure III-C. |
| 4 | Supply of HDPE conduit (32MM) for cables.Specifications as per Annexure III-D. |
| 5 | Supply of Outdoor weather housing (IP 65) Panel/Rack suitable for Installing Camera adaptors/ Splice Box as per attached specification in Annexure-III-E. These panels are to be used as the outdoor units (panels A1, A2, B1, B2) which house various components as shown in Annexure-IV scheme drawing. |
| 6 | Supply of Panel/Rack suitable for Installing L2 switches and associated units as per attached specification in Annexure-III-F. These panels are to be used as the L2 switch housing units (panels AL2, BL2) which house various components as shown in Annexure-IV scheme drawing. |
| 7 | Supply of Unmanaged type L2 switch with minimum 8 POE ports as per attached specification in Annexure-III-G. |
| 8 | Supply of Unmanaged L2 switch with minimum 8SFP ports as per attached specification in Annexure-III-H. |
| 9 | Supply & installation of 1KVA UPS (as per specification in Annexure – III-I).The UPS to be mounted onto a wall using necessary clamps.Incoming connection to the UPS from the nearby 230VAC to be provided.The UPS is to be connected to panels AL2 & BL2 as per scheme in Annexure-IV. |
| 10 | Supply of 1000BASE-LX SFP Module. |
| 11 | Supply, Installation & Configuration of Media convertor-Fibre to Ethernet(Non- PoE) as per attached specification in Annexure-III-J. |
| 12 | Supply, Installation & Configuration of Media convertor-Fibre to Ethernet as per attached specification in Annexure-IIIK. |
| 13 | Supply & Erection of 6 meter general pole with RCC foundation as per attached specification in Annexure- III-L. |
| 14 | Supply of 2inch G.I Pipe as per Annexure-III-M. |
| 15 | Digging earth upto 1.5ft & filling back after cable laying.The work involves excavation of earth/loose soil upto a maximum of 1.5ft depth.The digging shall be done carefully using only manual digging method. The width of the excavation shall be approximately 1ft.Wherever other cables are found during the excavation process, alternate route shall be used.The work also involves filling back the dug earth & compacting it, once the cable laying is completed. |
| 16 | Cutting of tar /concrete roads & filling back after cable laying.The work involves cutting of tar roads/concrete pathways using drilling/ hammering upto a maximum of 1 ft depth.The work also involves refilling of the excavated portion using concrete cement, once the cable laying is completed. |
| 17 | Laying of Cables (LAN,OFC,Power) through HDPE pipe.The work involves laying of a cable (either LAN,OFC or Power) through the supplied HDPE pipe.The joints between HDPE lengths shall be properly sealed using pipe connectors. |
| 18 | Laying of HDPE pipe through wallsThe work involves laying of HDPE pipe (containing cables) through brick/concrete walls.The HDPE Pipe shall be properly clamped to the wall using aluminium/SS clamps at a minimum interval of 1m. |
| 19 | Laying of HDPE pipe through an excavated route (dug earth).The work involves laying of HDPE pipe inside an excavated route (dug earth). |
| 20 | Laying of HDPE pipe through an excavated route(road cutting)The work involves laying of HDPE pipe inside an excavated route (road cutting). The HDPE pipe shall be routed inside 2 inch G.I pipes |
| 21 | Laying of HDPE pipe through pipe racks/cable trays/pole.The work involves laying of HDPE pipe through an open route- pipe racks/existing cable trays/poles etc. The HDPE pipe shall be properly tied to the support structures throughout its entire run. |
| 22 | Laying of cables through pipe racks/cable trays/pole.The work involves laying of cables through an open route- pipe racks/ poles etc without using HDPE pipes.The cable shall be properly tied to the support structures throughout its entire run. |
| 23 | Installation & commissioning of Fixed Cameras- F1, F2, F3, F4, F5, F6 and Integration with the network.The work involves:-(i) Installation of Cameras along with its Power and network connection. The cameras are to be pole mounted with proper orientation as per site requirements.(ii) All connections to the other Network elements inside respective panels to be verified. |
| 24 | Installation & commissioning Configuration of Panels A1, A2, B1, B2 and associated Network elements and Integration with existing network.The installation/integration work involves:-(i) Installation of Panels A1, A2, B1, B2 onto the poles.(ii) Installation of various elements inside these panels (including existing panel B3) as per scheme. Supply &Installation of Splice Box, Surge protectors, necessary connecting cables, MCB’s inside the panels.(iii) All CAT6/OFC/Power cables shall be properly routed/ glanded at these panels as per the scheme in Annexure-IV.(iv) All internal connections between the network elements as per the scheme in Annexure-IV. All patch cords to be supplied.(iv) Assignment of IP addresses and connectivity to be checked to all the cameras & the existing FACT Network. |
| 25 | Installation & commissioning of Panels AL2, BL2 and associated Network elements and Integration with existing network.The installation/integration work involves:-(i) Installation of Panels AL2 , BL2.(ii) Installation of supplied L2 switches inside these panels. Supply &Installation of Splice Box, Surge protectors, MCB’s inside the panels.(iii) All CAT6/OFC/Power cables shall be properly routed/glanded at these panels as per the scheme in Annexure-IV.(iv) All internal connections between the network elements as per the scheme in Annexure-IV. All patch cords to be supplied.(v) Assignment of IP addresses and connectivity to be checked to all the cameras & the existing FACT Network. |
| 26 | Integration with A0 PanelThe work involves:-1) Connection of OFC cable ‘A/F1’ to the existing L2 switch inside panel A0 using necessary Splice Box & SFP modules. All patch cords to be supplied.2) Connectivity to be checked to all the cameras & the existing FACT Network. Please Enable Macros to View BoQ information |