| 1 | Manufacturing , Testing & supply of 66 kV grade, 99 sq.mm AAAC AL-7 Covered Conductor (5% extra quantity to be considered for sagging & maintenance). |
| 2 | Supply of 66 kV Class Polymeric insulator hardware fittings with clamps and accessories |
| 3 | Supply of 66kV polymeric type post insulators with suitable accessories |
| 4 | Supply of Joints for Covered Conductor (1C X 99 sq mm Full tension Mid Span joint along with Heat Shrinkable type) |
| 5 | Supply of Termination kit (Bolted / Crimped lug+Heat Shrinkable type) for 66kV Covered Conductor |
| 6 | Supply of Special type hot dipped Galvanized Iron Channel Crossarm 1 m 75*40*6 mm cross arm with CBN for 66 kV Covered Conductor with bolt & nut clamps etc suitable for A type pole / lattice structure for drawing 66kV covered conductor |
| 7 | Supply of Special type hot dipped Galvanized Iron Channel Crossarm 3 m 75*40*6 mm cross arm with CBN for 66 kV Covered Conductor with bolt & nut clamps etc suitable for A type pole / lattice structure for drawing 66kV covered conductor |
| 8 | Supply of Special type hot dipped Galvanized Iron Channel Crossarm 1.5 m 75*40*6 mm cross arm with CBN for 66 kV Covered Conductor with bolt & nut clamps etc suitable for A type pole / lattice structure for drawing 66kV covered conductor |
| 9 | 66kV, 90kN Silicon Rubber Composite Insulator |
| 10 | Supply of Special A-Type Pole - 14Mtrs suitable for drawing 66 kV covered conductor(Two or more piece 6m+8 m pole) |
| 11 | Supply of G.I Earth Pipe C Class ,2.5mtr, 40mm Dia,with bolt & nut etc |
| 12 | 14 m B type lattice |
| 13 | B type Lattice extensions |
| 14 | Supply of C type Fire type wedge connectors suitable for 99 sq.mm Covered Conductor |
| 15 | Supply of 66kV stay sets with GI Earthwire 7/3.15 including all necessary accessories and excluding insulators |
| 16 | 66kV Polymeric Surge arrestor rated voltage 60kV, MCOV-48kV, 10kA, Class 3, |
| 17 | GI Structure parts/channels etc |
| 18 | 50*6 mm GI strip Supply of ceiling fan of 1200 mm sweep with all fitting of ISI marked good quality (Market rate) |
| 19 | Transport of materials issued for the works from stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by head load - Line conductor and earth conductor |
| 20 | Transport of materials issued for the works from stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by head load - Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc. |
| 21 | Transport of materials issued for the works from stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by head load - Towers, tower extensions,tower parts , A poles, Lattice poles , lattice extensions ,Cross arms and all other materials including earthing materials. |
| 22 | Transport of materials issued for the works from stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by lorry ) & return the materials to store/substation after completion of all works - Line conductor and earth conductor for an average distance of 5 KM |
| 23 | Transport of materials issued for the works from stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by lorry ) & return the materials to store/substation after completion of all works - Insulators and hardwares, accessories for power conductor, accessories for earth conductor etc. for an average distance of 5 KM |
| 24 | Transport of materials issued for the works from stores and distribution to locations for erection including storage, if necessary, loading and unloading charges etc. by lorry ) & return the materials to store/substation after completion of all works - Towers, tower extensions,tower parts , A poles, Cross arms and all other materials including earthing materials. |
| 25 | Fitting and erecting one HT 'A' type Pole (11, 12,13,14 m or more) in position incl. fitting cross arm, digging & back filling pit, drawing earth leads |
| 26 | Fitting and erecting one HT DP using 'A' type pole (11, 12,13,14 m or more) in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
| 27 | Additional rate for excavation of Pit for 'A' type pole in Laterite. |
| 28 | Additional rate for excavation of Pit for 'A' type pole in Hard Laterite. |
| 29 | Fitting and providing one Stay for A pole/lattice poles incl. digging & back filling pit. |
| 30 | Additional rate for excavation of one Pit for A Pole/ Stay in Laterite. |
| 31 | Additional rate for excavation of one Pit for A Pole/ Stay in Hard Laterite. |
| 32 | Fitting and providing one Strut using 'A' type pole incl. digging & back filling pit. |
| 33 | Fitting and providing one Fly stay for A pole / lattice pole using 'A' type pole incl. digging & back filling pits. |
| 34 | Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. |
| 35 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. |
| 36 | Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 37 | Arranging scaffoldings on either sides of the Main road as per the directions of dept. officers excluding hire charges of materials. |
| 38 | Paving out, stringing and tensioning as per standard of 3 line 66 kv covered conductors including providing insulator string on to the tower/ Apole/lattice cross arms, clamping the conductor at tension clamps, hire charges for stringing tools ,all hire and labour protection trestle and labour for providing suitable back stays at the time of stringing, etc. complete. Also includes labour for end termination, straight joint, giving connections to the 66 kv tower/gantry etc complete using suitable tools after removing jumper connections and reconnecting if required . |
| 39 | Drilling hole of various sizes on existing Channel/Cross Arm |
| 40 | Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. |
| 41 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing DP incl. conveyance of materials. |
| 42 | Fabrication of lattice/ pole extensions / equipment structures |
| 43 | Providing concrete muffing of required size on lattice/poles, including excavation, concrete (1:3:6, using 20mm metal) |
| 44 | Welding charge for welding on iron parts using arc welding as per standards |
| 45 | Cutting Channel/Cross Arm/Angle Iron into two pieces. |
| 46 | Dismantling of 3 line 66 kV covered conductors from tower, A-poles, lattice with atmost care without causing any damage to the covered conductor, cable terminations, including dismantling of insulator string, hardware fittings, leading the items for safe storage. Hire charges for stringing tools, all hire and labour protection trestle and labour for providing suitable back stays at the time of dismantling etc. complete. |
| 47 | Dismantling (without damage) one stay including digging pit in all classes of soil and backfilling, and bringing back to section store if required |
| 48 | Dismantling (Without damage) the earth connection along with the earth pipe including digging pit in all classes of soil and backfilling, and bringing back to section store if required |
| 49 | Dismantling (without damage) one 'A' type pole after disconnecting stays, strut etc attached thereon and stacking the same |
| 50 | Dismantling (without damage) one 'A' type DP structure after disconnecting stays, strut etc attached thereon and stacking the same |
| 51 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in - charge. Nominal concrete 1:3:6 or richer mix (or equivalent design mix), muffing |
| 52 | Rewinding of 66 kV covered conductor from dilapidated conductor drums / dismantled tower/poles for transporting/paving out on to serviceable conductor drums including all hire charges for tools & plants necessary for rewinding |
| 53 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 54 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 55 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 56 | Dismantling and reconnecting Sph service connection from the OH line including lowering down the WP portion. |
| 57 | Dismantling and reconnecting 3ph service connection from the OH line including lowering down the WP portion. |
| 58 | Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 59 | Stringing one km LT Sph 3 wire line (Rabbit for Ph&N, Weasel for St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 60 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary. |
| 61 | Cutting and removing trees/branches of trees standing within the RoW/outside the clearance belt, but hanging towards the line, clearing thick vegetation and bushes beneath the line and clearing tower footing etc of 66kV excluding paddy field etc as per the directions of department staff. |
| 62 | Erection of 1 No. 110/66KV LA/Post insulator on the already erected structure on tower/lattice/pole after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers. |
| 63 | Erection of Lattice pole/ extensions incl stub, LA mounting structures on EHT towers / A poles/ lattice poles using bolt and nut including punching of holes. |
| 64 | Providing derrick support and temporary stay arrangement for a tower |
| 65 | Dismantling of 1 No. 110/66KV LA/Post insulator from the already erected structure on tower/lattice/pole without causing any damage and leading to storage place carefully, keeping lines and levels as per the direction of the departmental officers. |
| 66 | Dismantling of Lattice, extensions, stubs, LA mounting structures from EHT towers / A poles/ lattice poles and stacking the materials as directed |
| 67 | Laying/re-laying of GI strip/Copper strip of suitable size including cleaning and neatly bending of strips ,cutting, bolting to lattice/ A-pole/ LA, removing of metal/earth in the tower location and burying earth strip to the required depth, re-doing the yard metalling as per the direction of the departmental officers. |
| 68 | Supplying and fixing synthetic warning tape of size 300mm wide, 200micron with printing of DANGER 66 kV KSEB Ltd in Red letters of size 200mmx5mm, fixing on pole or fixing in pole pit sides using bamboo poles up to a max height of 1 m as directed by the departmental officers at site |
| 69 | Daily Patrolling on towers/poles for assessing the safety of line /66 kV covered conductor /poles/stays /safety clearances etc by employing suitable no of patrolling persons on every stretch of bypassed 66 kV covered conductor line & reporting any abnormality to the department officers |
| 70 | Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolf / dog /suitable Single conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) |
| 71 | Dismantling/reconnecting the conductor droppers and connections from poles/line to line /equipments at both ends with compressed/ bolted ends (For one phase) Tension Clamp for Earthwire |
| 72 | BOQ1 - MATERIALS SUPPLY |
| 73 | BOQ2 - LABOUR - ERECTION AND CIVIL WORKS Please Enable Macros to View BoQ information |