| 1 | Total amount of the \\"Rate Schedule\\" sheet SCHEDULE OF QUANTITY AND RATE FOR INCREASING CAPACITY OF TRANSFORMER FROM 3 MVA TO 5 MVA AND INSTALLATION OF NEW 5 MVA TRANSFORMER UNDER 33/11 KV SUB-STATION, RAMNAGAR DANDA UNDER EDSD, JOLLYGRANT UNDER EDD, DOIWALA AGAINST E-TENDER SPECIFICATION NO.15/EDCRDDUN/2026-27 Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Qty Rate Amount Part [A] (Supply Portion) |
| 2 | 33/0.433 KV, 63 KVA Station Transformer |
| 3 | MS Nut & Bolt off size |
| 4 | Holding Clamp ST Pole SP-33 with N&B |
| 5 | Stay Clamp for SP-33 with Nut & Bolt |
| 6 | Isolator Clamp for ACSR Panther |
| 7 | G.I. Pipe 6 Inch |
| 8 | Providing 125 Amp., 35 KA , MF 4 Pole with Adjustable Microprocessor Relay with earth fault digital Moulded case circuit breaker for 63 KVA T/F with pannel Total - Part [A] 0.0 Part [B] (Labour Portion) |
| 9 | Supply, Filling, Spreading & Level Stone |
| 10 | Cleaning, Dressing & Leveling of Switch Yard |
| 11 | Cement Concreting work in Ratio 1:4:8 |
| 12 | Brick work in 1:4 Ratio |
| 13 | Cement Plaster work |
| 14 | Erection of New Boundry Wall |
| 15 | Special Earthing : Making Special type separate earthing for neutral /body of Power transformer by digging 3x4x12 feet deep pit at corner of Swithchyard with duly provided 1 No. coal Iron earth plates of size 18''x18''x½'' jointing them with 6'' long bolt duly coverod with layer of softcoal 60 Kg. and salt 20 Kg. (Total 80 Kg.) connecting them with the main erath mat, The earth plate shall be connected with 35x6 mm GI Strip and GI strip shall be laid upto the neutral and T/F body separately (Including supply of steel). |
| 16 | Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO sehedule and local approved drawing. |
| 17 | Fixing of GI Pipe |
| 18 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
| 19 | Erection of following Double support pole in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESPO construction Manual. SP-33 Nos 3.0 0.0 |
| 20 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement: 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction Manual. |
| 21 | Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement: 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc. |
| 22 | Laying of Underground 11 KV Cable in Trench |
| 23 | Cement Plaster on DTR Plinth |
| 24 | Installation of 63 KVA DTR on Pole Structure |
| 25 | Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work |
| 26 | Mounting and Fixing of Lightning arrestor set (3 Nos.) on double pole structure including making all connections by G.I. strip size 35x6 mm to earth point complete work (excluding cost of G.I.Strip) |
| 27 | Fixing of 11 XLPE Jointing Kit |
| 28 | Cartage of ST pole from store centre to construction site with loading, unloading at both points and proper stacking. (51-70 Km.) SP-33 Nos 6.0 0.0 |
| 29 | Cartage of other material (other than poles) by vehicle fro Store Center to nearest construction site Store including loading and unloading at both ends. (51-70 Km.) Rs.Per Qtl. Qtl 52.0 0.0 |
| 30 | Cartage of the following material from store center to construction site with loading and unloading at both points. (Loading, unloading plus carriage). (51-70 Km.) (i) 33 KV T/f Control Panel Nos 2.0 0.0 (ii) 33/11 CT/PT/Isolator Nos 3.0 0.0 (iii) 33 KV VCB Nos 2.0 0.0 (iv) 11 KV VCB I/C Nos 1.0 0.0 (v) 11 KV VCB O/G Nos 3.0 0.0 (vi) 11 KV VCB B/C Nos 1.0 0.0 |
| 31 | Cartage of the following 5 MVA Power Transformers material from store center to construction site with loading and unloading at both points. (Loading, unloading plus carriage of T/F). (51-70 Km.) |
| 32 | Dismantling of Fencing and Gate of S/S including fabrication cutting and welding works at 33/11 KV Sub Station |
| 33 | Mannual Shifting of Control Panel |
| 34 | Mannual Shifting of 11 KV VCB I/C |
| 35 | Mannual Shifting of 11 KV VCB B/C |
| 36 | Mannual Shifting of 11 KV VCB O/G |
| 37 | Mannual Shifting of 33 KV VCB |
| 38 | Loading of 5 MVA Transformer at Sub Station in Vehicle |
| 39 | Erection of 5 MVA T/F at transformer plinth & erection of all accessories i.e. radiators, conservator tank, vent pipee etc., with the help of special type of T&P / crane etc. fitting cable etc. and refilling the fresh oil in radiator and conservator. |
| 40 | Re-erection of fencing and gate complete all work |
| 41 | Erection of 33 KV Control Panel (feeder /transformer) in all respect, making connection complete including testing and commissioning. |
| 42 | Digging of trench of size 0.60x0.15 x 1.5 mtr. and laying of underground 11 KV XLPE cable with making of brick housing and filling of sand including filling of earth with ramming & repairing of road including cost of cement sand and stone blast |
| 43 | Erection of 33 KV Vaccum Circuit Breaker in all respect, making connection including testing and commissioning. |
| 44 | Making of Transformer Base |
| 45 | Dismantling of 33 KV CT-PT Combined Unit |
| 46 | Testing of Power Transformer |
| 47 | Making of Trench Cover |
| 48 | Dismantling of 11 KV VCB I/C |
| 49 | Dismantling of 11 KV VCB O/G |
| 50 | Erection of 11 KV VCB I/C |
| 51 | Erection of 11 KV VCB O/G |
| 52 | Erection of 11 KV VCB B/C |
| 53 | Installation of Line/Bus Isolator |
| 54 | Re-wiring of 33 KV VCB Panel |
| 55 | Shifting of following Power Transformer from road site to work site / store center to loading site with the manual pulling. 5 MVA Transformer Nos 2.0 0.0 |
| 56 | Back Carriage of 3 MVA Transformer from Sub-Station to Store Centre including loading and unloading at both points. (51-70) Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer Please Enable Macros to View BoQ information |