| 1 | Earth work in excavation in ordinary in all of foundation tranches including dressing of side and ramming of bottom lifts upto 1.5m including getting out the excavation soil and disposal of surplus excavated soil as directed with in a lead of 50m.All kinds of soil.Depth from 0.00 to 1.5m below. |
| 2 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 |
| 3 | M-150 brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/303+(305) |
| 4 | 12 mm cement plaster of mix : 1:6 (1cement :6 coarse sand) (DAR/13.4.2/Based on UPPWD/SOR-2020)) |
| 5 | Cement concrete with 2cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 Including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (UPPWD/SOR-2020/279(a)) |
| 6 | Dry brick on edge flooring in required pattern with bricks of class designation 150 on a bed of earth including filling compressed, with M-150 bricks. (DAR/11.2/AR/YEIDA/Based on UPPWD/SOR-2020) |
| 7 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Based on SOR UP PWD 2020) |
| 8 | Providing and laving 80 mm thick factory made cement concrete Interlocking paver block(ISI Marked) made by block making machine with strong vibratory compaction of approved size design, shape, laid in required color and pattern over and including average 50 mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per direction of Engineer -in - charge with conforming (UP PWD SOR 2020) (New SOR Based DAR 16.68) |
| 9 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 10 | Pumping out water by diesel upmp of discharge capacity of 4000 ltrs per hour including fuel operator, suction & delivery pipes of size 4\\"x4\\" length 150 as per direction of engineer in charge |
| 11 | Supply of good earth work banking excavated earth in layers not exceeding 20 cm in depth breaking clods watering rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonne and dressing up in embankments for roads flood banks marginal banks and guide banks or filling up ground depressions all lead as per (a.r.) for all kind of soils |
| 12 | Demolishing and laying dry brick or interlocking tiles on edge including stacking serviceable materials and dispose of unservisable material with in 50 meters of lead |
| 13 | Providing and laving 80 mm thick factory made cement concrete Interlocking paver block(ISI Marked) made by block making machine with strong vibratory compaction of approved size design, shape, laid in required color and pattern over and including average 50 mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per direction of Engineer -in - charge with conforming Using Old Tiles (Labour Only) Please Enable Macros to View BoQ information |