| 1 | Item Description/ Heading |
| 2 | All bolts nuts are opening and welded portion cutting by gas and dismantling of pump & motor set with bends suction pipe etc. |
| 3 | Pump motor set and damaged bed plate lifting with carrying by manually from water bed to surface.High skilled - 1 men X 2 shift=2MS x 552=1104Semiskilled - 3 men X 2shift=6MS x 363=2178Skilled - 2men X2shift=4MS x 478=1912Unskilled - 6men X 2shift=12MS x 346=4152 |
| 4 | Damaged base plate dismantling for repairing and modification with old iron materials cutting by gas and dismantling.. |
| 5 | Old and scrap girders, m.s. plate angel etc. are collected from dumping yard at DOC after gas cutting and lifting with carrying by manually for repairing of base plate. |
| 6 | Damaged bed plate making by girders and m.s.plate, angles are cutting by gas cutting as per proper size & bends girders are straightening by heating and hammering process. Girders, m.s.plates are setting and welding on the bed plate. |
| 7 | Handling and placing of 6\\" dia X20fts m.s.pipe-27nos for flange welding.Semi skilled 3 men x 1 shfit=3MS x 363=1089Unskilled - 5 men x 1shift=5MS x 346=1730 |
| 8 | Cost of 6\\" dia m.s. flange both side setting with fittings and welding with 6\\" dia m.s.pipe -27 nos in side and out side double layer welding.27X2=54 |
| 9 | Earth digging with damaged & rusted 6\\" dia X20 fts. Length 27 nos pipes dismantling with lifting with carrying by manually from various place of water supply of pipe line at Ram krishna colony.Un skilled - 8 men X 9 shift=72MS 346=24912Semi skilled - 4men X 9 shift=36MS x 363=13068 |
| 10 | 27 nos 6 \\"X 20fts length pipes loading and unloading from DBOCP Electric sub station to various place of Ramkrishna colony pipe line for replace of damaged pipes.Un skilled - 8 men X 4 shift=32MS x 346=11072 |
| 11 | Cost of 'L' type5nos bend & 8 nos short pice making by 6\\" diaM.S.pipe cutting by gas and both side 6\\" dia M.S. flange welding in side and out side double layer welding and grand finishing (bend making as per required size.) |
| 12 | Manually laying and jointing & fitting of 6\\" dia X20fts length M.S.pipe. |
| 13 | Labour cost for digging earth covering by soil after installation of pipes by manually. |
| 14 | Loading and unloading of pump with motor set, bed plate ,bends etc from DBOCP work shop to Ram Krishna quarry with the help of crane |
| 15 | Lifting and installation of pump motor set by manually and setting on the bed plate with line leveling and fittings by bolting |
| 16 | Jointing with fittings 6\\" dia m.s.pipe, bends NR Valve,sulice valve and fitting with delivery line with 20fts length suction pipe with foot valve and alignment motor and pump with bed plate. |
| 17 | Z' type bend and curve type bend bend 12.8\\" X8\\" making by 6\\" dia ms pipe cutting with both side 6\\" dia ms flange in side & out side double layer welding with grand finishing with joining at uneven place. (as per required size) |
| 18 | Foot valve repairing foot valve lather changing with new fitting charges. |
| 19 | Cost for old and rejected conveyor belt cutting |
| 20 | Industrial gas |
| 21 | Oxygen cyl. |
| 22 | M.S. Electrode |
| 23 | Brass valve3/4\\"-1no, bend ¾\\" cooling pipe, clap etc. |
| 24 | Grease packing 5/8\\",3/4\\" |
| 25 | M. S. flange 6 dia HD |
| 26 | M.S.bolts,nut with washer.(as per required size) |
| 27 | Pump motor covering guard making |
| 28 | Tools nad tackles with transporting charges of m.s.flanges bolts, nuts, DA and oxy. Cyl etc. |
| 29 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |