| 1 | Annexure-A (Supply of following material as per UPCL Norms.) |
| 2 | Dead End Clamp with I-Hook (for AB Cable on PCC Pole). |
| 3 | PG Clamp (Parallel Groove Clamp) – 70–70 Sq.mm. |
| 4 | PG Clamp (Parallel Groove Clamp) – 95–25 Sq.mm. |
| 5 | PG Clamp (Parallel Groove Clamp) – 95–50 Sq.mm. |
| 6 | PG Clamp (Parallel Groove Clamp) – 95–95 Sq.mm. |
| 7 | Stay Clamp with Nut & Bolt for PCC Pole (8.5 Mtr). |
| 8 | Piercing clamp for 120sq.mm- 120 sqmm. |
| 9 | MS Clamp with Nut & Bolt for Distribution Box. |
| 10 | Mid Span Insulator (J-Sleeve) for LT ABC. |
| 11 | Piercing conductor 95-35 sq.mm. |
| 12 | Piercing connector for 95 sqmm-120 sqmm. |
| 13 | Insulated PRC (Insulation Piercing Clamp) – 95–95 Sq.mm |
| 14 | LT Distributin Box 03 Phase 4 Wire. |
| 15 | Bolts & Nuts off size. |
| 16 | Piercing connector 120 to 35 sq.mm. |
| 17 | Supply of Suspension Clamp with Eye Hook. |
| 18 | Supply of PG Clamp for Neutral – 70–25 Sq.mm. |
| 19 | Supply of Stay Set GI 16 × 1800 mm (D Type). |
| 20 | Supply of LT XLPE Cable – 1×35 Sq.mm. |
| 21 | Supply of LT XLPE AB Cable – 3×95 + 1×50 Sq.mm |
| 22 | Supply of LT Aerial Bunched (AB) Cable – 3×120 + 1×95 + 1×16 Sq.mm (D). |
| 23 | Supply of 08 SWG GI Wire (Galvanized Iron Wire). |
| 24 | Annexure-B (Following work as per UPCL norms) |
| 25 | Chemical Earthing – Earthing of distribution transformer including excavation of pit up to 2.5 m depth and boring of hole of 150 mm diameter. Placing of earthing electrode (to be supplied by the contractor) as per Drawing No. A/B, and connecting the same with G.I. strip (to be supplied by the contractor) of size 35×6 mm for a minimum length of 6 m as per Drawing C. Treatment of soil with highly conductive compound as per IS 30343, complete in all respects. The earth resistance shall be measured and recorded in the Measurement Book before and after installation of earthing. The earth resistance after installation shall be less than 1 Ohm. |
| 26 | Erection of LT Stay Set complete with excavation of stay pit, fixing of plate with stay rod in proper alignment, backfilling and ramming, providing and fixing of stay wire, turnbuckle, thimble and clamps, connection to pole with stay clamp, including tightening, dressing and proper alignment, complete in all respect and direction of Engineer-in-Charge |
| 27 | Grouting of stay set - Grouting of stay set including providing and placing cement concrete of approved mix around stay rod and anchor plate in stay pit, proper compaction, leveling, curing and finishing, complete in all respect and direction of Engineer-in-Charge. |
| 28 | Erection of Single support pole (PCC Pole) in proper level and alignment alongwith fixing of all accessories, like tope channel & clamps as per RESSPO construction mannual. |
| 29 | Dismantling of existing LT overhead line of 1-phase 2-wire system with Weasel conductor including removal of conductor, insulators, binding materials and associated hardware from poles, lowering, coiling, stacking at site/store, and making the site clear, complete in all respect as per direction of Engineer-in-Charge.” |
| 30 | Dismantling of existing LT overhead line of 2-phase 3-wire system with Weasel conductor including removal of conductor, insulators, binding materials and associated hardware from poles, lowering, coiling, stacking at site/store and making the site clear, complete in all respect as per direction of Engineer-in-Charge |
| 31 | Dismantling of existing LT overhead line of 3-phase 4-wire system with Weasel conductor including removal of conductor, insulators, binding materials and associated hardware from poles, lowering, coiling, stacking at site/store and making the site clear, complete in all respect as per direction of Engineer-in-Charge. |
| 32 | Lopping and chopping of tree branches coming in contact or in close proximity of LT/HT overhead lines including cutting, trimming, clearance of vegetation, disposal of cut branches and ensuring safe clearance of line, complete in all respect as per direction of Engineer-in-Charge. |
| 33 | Cartage of PCC Poles from departmental store/approved source to work site for a lead of 21–50 Km including loading, unloading, stacking at site and all handling charges, complete in all respect as per direction of Engineer-in-Charge. |
| 34 | Headload cartage of PCC Poles from road point/store to work site for a lead of 0–1 Km including manual loading, unloading, carrying, stacking at site and all handling charges, complete in all respect as per direction of Engineer-in-Charge.” |
| 35 | Laying of LT XLPE ABC 3x120+1x95+1x16 sq.mm. |
| 36 | Straightening of tilted PCC poles including excavation around pole, realignment to vertical position, refilling with suitable soil/moorum, proper ramming and compaction, dressing of pole foundation and restoration of site, complete in all respect as per direction of Engineer-in-Charge.” |
| 37 | Installation of LT Distribution Box (3-Phase) suitable for LT AB Cable on pole/wall including mounting of DB, fixing with suitable clamps/bolts, termination of incoming and outgoing AB cable using appropriate connectors (IPC/lugs), provision of protective devices (as applicable), tightening, testing and commissioning, complete in all respect and direction of Engineer-in-Charge. |
| 38 | Laying sagging 3x95+1x50 sq.mm. AB Cable. |
| 39 | Fixing of Suspension Clamp complete with I-Hook suitable for LT Aerial Bunched Cable on PCC pole including positioning of clamp, fixing of I-Hook on pole, placing of cable in clamp groove, tightening and proper alignment, complete in all respect and direction of Engineer-in-Charge. |
| 40 | Fixing of Piercing Connector suitable for 120–120 Sq.mm LT AB Cable (Line to Line) including positioning of conductors, tightening of shear-head bolt, ensuring proper electrical contact and insulation piercing, complete in all respect and direction of Engineer-in-Charge |
| 41 | Laying of 1X35 Sq.mm. XLPE Insulated cable. |
| 42 | Disconnection and reconnection of 1-phase LT service connection from pole/distribution box including safe isolation, removal and re-fixing of service cable, meter/terminal connections, tightening, testing and restoration of supply, complete in all respect and direction of Engineer-in-Charge. |
| 43 | Disconnection and reconnection of 3-phase LT service connection from pole/distribution box including safe isolation, removal and re-fixing of service cable, meter/terminal connections, tightening, testing and restoration of supply, complete in all respect and direction of Engineer-in-Charge Please Enable Macros to View BoQ information |