| 1 | Daily cleaning (except Sunday & National Holiday) with phool jhadu over mosaic, cement marble floor including cost of labours, T&P charges etc. as per direction of Engineer-in-charge |
| 2 | Daily cleaning with broom stick (except Sunday & National Holiday) over earth, cement, concrete surface including cost of labours, T&P charges etc. as per direction of Engineer-in-charge |
| 3 | Weekly cleaning with broom stick over earth, cement concrete surface including cost of labours, T&P charges etc. as per direction of Engineer-in-charge |
| 4 | Daily cleaning with long head mop soaked with scented phenyl over cement floor, mosaic floor, marble floor including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-charge (except Sunday & National Holiday) |
| 5 | Weekly cleaning with long head mop soaked with scented phenyl over cement floor, mosaic floor, marble floor including cost of labours, T&P charges etc. complete in all respect as per direction of Engineer-in-charge |
| 6 | Weekly cleaning of oily and grasy floor with cotton waste and washing with detergent powder including cost of labours, T&P charges etc. complete in all respect as per direction of Engineer-in-charge. |
| 7 | Daily cleaning of lavatory floor with brush and phenyl water, urinal pan and latrine pan are to be cleaned with disinfectant liquid and toilet brush regularly. Urinal pans are to be provided with Naphthalene balls. Wash basins are to be cleaned with detergent including cost of labours, T&P charges etc. complete in all respect as per direction of Engineer-in-charge. |
| 8 | Weekly cleaning of lavatory floor with brush and phenyl water, urinal pan and latrine pan are to be cleaned with disinfectant liquid and toilet brush regularly. Urinal pans are to be provided with Naphthalene balls. Wash basins are to be cleaned with detergent including cost of labours, T&P charges etc. complete in all respect as per direction of Engineer-in-charge. |
| 9 | Quaterly cleaning of spider nets and other dirts of side wall and ceiling by broom stick and removing of the dust from the floor including cost of labours, T&P charges etc. complete in all respect as per direction of Engineer-in-charge. |
| 10 | Half yearly cleaning of shrub jungles, uprooting of stumps and small bushes and tree below 1 mtr grith on pre-measurement including staking of waste materials and proper disposal of the same including cost of labours, T&P charges etc. complete in all respect as per direction of Engineer-in-charge. |
| 11 | Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pan and vessels etc as per direction of Engineer-in-charge |
| 12 | Cleaning and disposal of slushes and fluid from septic tank, man hole and sewerage lines as directed by Engineer-in-charge and dumping at a suitable distance of 50mtr away from work site Please Enable Macros to View BoQ information |