|
| 1 | Taking down existing water proofing treatment of any description incl PCC padding,/ or cement plastering work any thickness from roof surfaces, cleaning of roof and prepairing it for further treatment incl make good necessary dubbing out wherever required and removing rubbish from site complete all as specified and directed. |
| 2 | Material and Labour for Brushing neat cement slurry with 3.0 kg of cement per sq. metre complete all as specified and as directed. |
| 3 | Matrial and Labour for Cement Concrete 1:2:4 Type B-0 (12.50 mm Graded Stone aggregate in padding, finishing surface concrete topping even and fair (without using extra cement) of average thickness 40 mm in slope as required over roof complete all as specified and as directed. |
| 4 | Material and Labour for 10 mm thick Plastering in CM 1:4 on concrete roof surfaces using water proofing compound @ 3% by weight of cement and finishing the surface even and fair complete all as specified and directed.WPC will be measured separately. |
| 5 | Supply only liquid waterproofing compound ISI Marked all as specified and as directed. |
| 6 | Material and Labour for Applying evenly two coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m incl cleaning surface complete all as specified and as directed. |
| 7 | Material and Labour for APP based polymeric membrane( plain /gravel ) minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric (wt. not less than 150 gms/sqm) land on primed surface by forced application ,The overlaps while torching shall be 100 mm in both directions(longititudinal and transverse directions). All overlap joints shall be sealed throughly by thermofusing both the membrene layers and sealing it with the help of hot trowel. The overlap joints shall be made as monolithic layer. complete all as specified. |
| 8 | Material and labour for one coat of aluminium paint at the rate of 100 gm/Sqm as per manufacturer's instructions over bituminous layer, complete all as specified & directed at site. |
| 9 | Taking up or down 15mm bore steel tubing and connections, including cleaning for refixing or removal out side MD land all as directed by Engr-in-Charge. |
| 10 | Taking up or down 20mm bore steel tubing and connections, including cleaning for refixing or removal out side MD land all as directed by Engr-in-Charge. |
| 11 | Supply and Fixing Galvanized Steel Tubes of bore 15 mm, 'Medium grade' galvanised, with all necessary fitting and fixed complete to walls and ceilings or laid in floors complete all as specified and as directed by Engineer-in-Charge |
| 12 | Supply and Fixing Galvanized Steel Tubes of bore 20 mm, 'Medium grade' galvanised, with all necessary fitting and fixed complete to walls and ceilings or laid in floors complete all as specified and as directed by Engineer-in-Charge |
| 13 | Refixing old steel tubing and connections in new or old position with all fittings retrieved from Serial here-in-before and fixed (walls, ceiling, floors, etc) of 15/20 mm dia complete all as specified and as directed. |
| 14 | Supply and fixing PVC (SWR) pipe single socketed in any length with rubber ring joints fixed to walls 75 mm dia bore pipe complete all as specified and directed. |
| 15 | Supply and fixing PVC (SWR) bends any radius 75 mm bore complete all as specified and directed. |
| 16 | PVC(SWR) junction single (single 'T') equal or unequal 75 mm bore with access to door ccomplete all as specified and directed. |
| 17 | Supply and fixing PVC (SWR) pipe single socketed in any length with rubber ring joints fixed to walls 110 mm dia bore pipe. |
| 18 | Supply and fixing PVC (SWR) bends any radius 110 mm bore complete all as specified and directed. |
| 19 | PVC(SWR) junction single (single 'T') equal or unequal 110mm bore with access to door ccomplete all as specified and directed. |
| 20 | Material & Labour for 15 mm thick rendering in cement plaster 1:4 on fair face of brick/concrete/stone masonry surfaces including finishing the surfaces even and smooth (without using extra cement) incl mixing with integral water proofing compound complete incl Taking down cement plaster of any description on brick or stone walls etc including racking out joints, hacking for key scrubbing down with water etc complete all as specified and directed. Note:- Integral water proofing compound will be measured and paid separately. |
| 21 | Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces complete all as specified and directed. |
| 22 | Supply and Fixing Vitreous china water closet Orissa pattern long pan size 580x440mm with trap front or back inlet and integral foot rest complete fixed in repair including lime concrete bedding and connection to drain or outgoing pipe and to flushing pipe and anti siphon pipe complete all as specified and as directed. |
| 23 | Supply and Fixing in repair 10 ltrs capacity PVC low level flushing cistern, of make specified with inlet, float valve and handle including bracket with 32 mm dia PVC flush pipe complete all as specified and as directed. |
| 24 | Demolition of brick work built in cement mortar of any description incl quions arches but excluding aslars facing complete all as specified and directed by the Engr-in-charge. |
| 25 | Material & Labour for brick work with sub class ‘B’ bricks straight or curved on plan exc. 6 mtr mean radius built in CM(1:6) complete all as specified and directed. |
| 26 | Material & Labour for sunken floor treatment as in following precedence (i) The treatment of existing sunken floor is to be dismantled upto full depth of Sunken RCC Slab and the surfaces both vertical and horizontal shall be cleaned by removing all loose mortar, dirt, dust etc. by chisel, hammer, wire brush/Jute Brush and Air Blower machine than apply two coats of elastomeric compound viz back bond WPC-30 over one coat on neat primer i.e. Super latex be applied on clean surface.(ii) Provide 40mm thick PCC 1:2:4 type B-0 using 12.5mm graded crushed stone aggregate as in sub base and provide 40mm dia GI pipe med gde as in (spout) of 600mm long as in sunken portion. (iii) Then rendering 15mm thick in CM 1:3 using liquid water proofing compound @ rate 200 ml per 50 Kg bag of cement on horizontal and vertical surfaces of sunken portion. Note: Water proofing compound shall be measured and paid separately. (iv) The sunken floor tested for leakage/seepage by ponding it with water for minimum 72 hrs.(v) Then fill the remaining sunken portion with PCC 1:5:10 using brick aggregates including fixing sanitary items requiring embedding in cement concrete. To ensure that there shall not be any seepage/dampness in the slab as seen underneath and side. |
| 27 | Material & Labour PVC (SWR) floor trap plain with grating incl jointing with solvent cement 75 mm bore complete all as specified and directed. |
| 28 | Supply and Fixing in repairs Angle stop valve cast copper alloy, with fancy type chromium plated capstan head, screwed down, high pressure screwed both ends for 15 mm bore iron pipe or for unions and fixed complete, all as specified. |
| 29 | Supply and Fixing in repair Bib taps cast copper chromium plated fancy type with crutch or butterfly handle screwed for iron pipe or for brass ferrule of 15 mm bore dia complete all as specified and directed. |
| 30 | Disconnecting existing water tank of capacity n exc 500 litres ltrs,setting aside (or lowering if required) for repairs,cleaning,etc. and hoisting if required reconnecting and incl. replacing check nuts and refixing in position after cleaning and removing all scale and dirt, etc from tank and from mouths of circulating pipes etc complete all as specified and directed. |
| 31 | Disconnecting existing water tank of capacity exc 500 and n. exc. 1000 litres ltrs,setting aside (or lowering if required) for repairs,cleaning,etc. and hoisting if required reconnecting and incl. replacing check nuts refixing in position after cleaning and removing all scale and dirt, etc from tank and from mouths of circulating pipes etc complete all as specified and directed. |
| 32 | NOTE :- SCHEDULE OF CREDIT (Amount shall be deducted offline from the total quoted amount to workout the net contract sum to be considered for acceptance.) [(-) Rs 6000.00/- ] Please Enable Macros to View BoQ information |