| 1 | Excavation in Soil with Dozer with lead upto 1000 metres (Excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment/ dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections) |
| 2 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 in Super Structure RCC Grade M25 Height above 5m |
| 3 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 in Super Structure RCC Grade M30 Height upto 5m |
| 4 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 |
| 5 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions). |
| 6 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (By Mechanical means) |
| 7 | Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material, labour and T&P etc. required for proper completion of the work. |
| 8 | Providing and fixing 32 mm diameter 3.0 meter long Self drill anchor including drilling 54 mm dia holes,sacrificial bit, plate, nuts, cement grout, cost of all materials, machinery, labour, drainage including lead and lifts with all other ancillary operations etc. complete as per Drawing and Technical Specifications. |
| 9 | Fixing Perforated PVC Pipe 50 mm dia for curtain grouting with machinary ,Manpower etc. |
| 10 | Grouting in 50 mm dia holes including machinery, Manpower, As per specification in all respect. Please Enable Macros to View BoQ information |