| 1 | Part-1:- Construction of 63 kVA,11/0.4 KV DP Mounted SubstationWPB 160x152 mm (30.44 kg/mtr) 13 Mtr long WPB Pole Galvaniged with base plate 300*300*12 |
| 2 | Earthing Device Coil type |
| 3 | No-8 GI wire (Dia 4.6mm) 0.131 kg/mtr ,2 mtr for connecting pole with the coil Earthing |
| 4 | Top pressure GI Channel 100x50x6 mm each 2.8 mtr long ,2 nos (@ 9.2 kg/mtr) |
| 5 | Transformer mounting GI Channel 100x50x6 mm channel rach 2.8 mtr long 2 Nos.(@9.2 kg/mtr) |
| 6 | AB Switch & HG Fuse Mounting GI Channel 75x40x6 mm 2.8 mtr long, 4 nos. (@6.8 kg/mtr) |
| 7 | Cantilever GI Channel for supporting AB switch arm 75x40x6 mm 1 mtr long 2 nos (@6.8 kg/mtr) |
| 8 | Cantilever Angle for supporting AB Switch 50x50x6 mm GI Angle (1 mtr long 2 nos.) (@4.5 kg/mtr) |
| 9 | Transformer belting GI Angle 50x50x6 mm 2.8 mtr long 2 nos. (@4.5 kg/mtr) with side angle total 7 mtr |
| 10 | Angle for mounting LT distribution box 50x50x6 mm GI angle 1 mtr each long 2 nos(@ 4.5 kg/mtr) |
| 11 | AB switch side support channel 100x50x6 mm 6.8 kg/mtr each channel length 0.35mtr 2 nos channel required |
| 12 | Channel support for down pipe 75x40x6 mm 6.8 kg/mtr each channel length length 0.8 mtr 1 no channel required |
| 13 | 11 kv disc insulator B&S type 45 KN polymer |
| 14 | Hardware fitting B&S type 45KN, 2 bolted |
| 15 | 11 kv AB Switch 3 pole(200 amp) |
| 16 | 11 kv HG fuse 3 pole (200 amp) |
| 17 | Lightning Arrester (9 kv,5Ka) |
| 18 | HT Stay set complete |
| 19 | HT stay insulator |
| 20 | HT stay clamp |
| 21 | 7/10 SWG stay wire |
| 22 | GI Pipe earthing 40 mm dia medium gauge 3 mtr long |
| 23 | 25x4 mm GI Flat (Neutral) |
| 24 | 25x6 mm GI Flat |
| 25 | 55 sqmm AAAC |
| 26 | PG Clamp for 55 sqmm AAA Conductor |
| 27 | GI Nuts,Bolts & washer |
| 28 | 63 KVA ,11/0.4 KV AL Transformer BIS Energy level -II |
| 29 | LT Distribution Box with MCCB , Aluminium Busbar of Single Bay with Kitkat fuse for 63 KVA substation |
| 30 | 1Cx95 sqmm LT XLPE Cable Unarmoured |
| 31 | Danger board |
| 32 | Back Clamp for Danger plate 25x3 mm flat, 0.59 kg/mtr, Flat of 0.51 mtr 1 no |
| 33 | Anticlimbing Device(GI barbed wire 3 kg per support |
| 34 | Back Clamp for Barbed wire Anticlimbing Device 25x3 mm flat,0.59 kg/mtr flat of 0.52 mtr length 4 nos |
| 35 | Black Paint |
| 36 | Yellow colour paint for Background |
| 37 | Sundries( Aluminium binding tape,paint,Insulating tape,binding tape, cale,socket etc |
| 38 | Part-II:-Construction of 11 KV 3 phase 3 wire line with 55 sqmm Covered conductor with 1 no of tapping point13 mtr long 160x152 mm WPB Pole with base plate 300*300*12 mm(30.44 kg/mtr) |
| 39 | Earthing Device Coil type |
| 40 | No-8 GI wire (Dia 4.6mm) 0.131 kg/mtr ,2 mtr for connecting pole with the coil Earthing |
| 41 | 100x50x6 mm Channel for Straight cross arm each 1.2 mtr long ,2 nos & 0.2 mtr long 2 nos |
| 42 | 11 KV V cross arm 10.2 kg each(with galvanization) |
| 43 | GI Back clamp for 11 KV V cross arm |
| 44 | 11 KV F clamp 2.9 kg each wity Galvanization |
| 45 | Disc Insulator(B&S) 45KN Polymer |
| 46 | H W Fitting (B&S) 2 bolted |
| 47 | PG Clamp for 55 sqmm AAA Conductor |
| 48 | Fish Plate 50*8 mm 3.14 kg/mtr each 0.280 mtr length |
| 49 | 11 KV XLPE 55 sqmm insulated conductor |
| 50 | Dead end clamp 11 KV |
| 51 | IPC for covered conductor 11 KV 55 sqmm |
| 52 | 11 Pin insulator |
| 53 | GI Nuts bolts washer |
| 54 | HT Stay set complete |
| 55 | HT stay insulator |
| 56 | HT stay clamp |
| 57 | 7/10 SWG stay wire |
| 58 | Danger Board |
| 59 | Back clamp for Danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 60 | Anticlimbing Device (GI Barbed wire) |
| 61 | Back Clamp for barbed wire anticlimbing device 25x3 mm flat ,0.59 kg/mtr flat of 0.51 mtr length 4 nos |
| 62 | Black Paint |
| 63 | Yellow colour paint for Background |
| 64 | Sundries(Clamp,Connectors,Binding Tape) |
| 65 | Part-III:- Installation of 9 mtr pole at S/S as zero polePSC POLE 9 METER LONG 300 KG |
| 66 | RCC Base Plate |
| 67 | Earthing of Support ( Coil Type ) |
| 68 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 69 | LT Stay set complete |
| 70 | LT Stay Insulator |
| 71 | LT Stay Clamp |
| 72 | 7/12 GI Stay wire |
| 73 | Pole clamp for eye hook |
| 74 | Dead end Clamp for eye hook |
| 75 | Anticlimbing Device (GI Barbed wire 3 kg per support) |
| 76 | Backclamp for ACD(25x3 mm GI Earth Flat 0.59 Kg/mtr & 0.51 mtr for each back clamp(4 pc/support) |
| 77 | GI Nuts bolts & Washers |
| 78 | Danger Board |
| 79 | Backclamp for Danger Board(25x3 mm GI Earth Flat 0.59 Kg/mtr & 0.51 mtr for each back clamp(4 pc/support) |
| 80 | Black Paint |
| 81 | Yellow colour paint for Background |
| 82 | Sundries(Paint,clamp,Connectors,Binding Tape) |
| 83 | Part IV:-Civil and Services WorksStay Concreting in ratio 1:2:4 as per TPSODL Specification & Drawing=0.2 Cum@ 6648.85=0.2x6648.85=Rs 1329.77 |
| 84 | Concreting ratio 1:1.5:3=0.45 Cu.mtr @6648.85=.45x6648.85= Rs 2991.98 |
| 85 | Concreting ratio 1:1.5:3 = 0.375 Cu.mtr @6648.85 =.375x6648.85= Rs 2493.32 |
| 86 | Couping of poles in ratio 1:1.5:3 @ 0.1125 Cum @ 6648.85= 0.1125x6648.85=Rs 748 |
| 87 | Construction of Boundary walls for fencing the DPM S/S in the size 3x3 mtr @7300 .12/RM considering height above ground level 1.65 mtr & below ground depth 1.2 mtr including the cost of fabrication, installation of MS Gate |
| 88 | Material for Massionary work for earth pit Cahrcoal salt etc including constrution for earthing chamber(size:2\\"x2\\") & RCC slab cover |
| 89 | Survey of incremental/Delta network & assets changes of 11 KV & LT network & updation in GESW database |
| 90 | Survey & Digitization of New DSS & its internal including attibutes |
| 91 | Part V- Service Connection & MetreingLT 3.5 core 35sqmm PVC cable |
| 92 | No8 SWG 4.06 mm dia GI wire |
| 93 | Link clip |
| 94 | S/C Bracket |
| 95 | Sundries Please Enable Macros to View BoQ information |