| 1 | Earth work in excavation of foundation in hard soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge. |
| 2 | Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes if any and all labour, T & P etc. all complete as per PW spesification & direction of Engineer-in- charge. |
| 3 | Cement concrete (1:3:6) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes if any, and all labour involved for completion of item of work as per PW Specification & direction of Engineer- in - charge. |
| 4 | Fly Ash Brick masonry in cement (1:6) in foundation & plinth of brick size 25cmx12cmx8cm having crushing strength not less than 75 kg/cm2 including all cost ,Labour T&P, carriage, royality, taxes if any, all complete as per PW Specification & direction of Engineer- in - charge. |
| 5 | Fly Ash Brick masonry in cement (1:6) in superstructure of brick size 25cmx12cmx8cm having crushing strength not less than 75 kg/cm2 including all cost ,Labour T&P, carriage, royality, taxes if any, all complete as per PW Specification & direction of Engineer- in - charge. |
| 6 | Ground Floor |
| 7 | Providing RCC M20 grade concrete ,lifting hoisting and lying asper approved drawing and design,specification using 20mm & down graded CBHG chips including centering and shuttering ,cost, conveyance,labour,t&p,cess,taxes if any etc all complete as per PW specification and direction of Er in Charge. |
| 8 | Ground Floor |
| 9 | a) Column base |
| 10 | b) Plinth Bend |
| 11 | c) Column & Roof Beam |
| 12 | d) Lintel |
| 13 | e) Roof slab |
| 14 | f) Chajja |
| 15 | Straightning, cutting ,bending, binding MS rod (confirming to Fe:415,Fe :500 of IS;1786 )tying and placing in position Including cost of binding wire 18 to 20 gauge and cost & conveyance MS rod etc all complete as per design, specification and dirction of Er-in Charge. |
| 16 | Ground Floor |
| 17 | 2.5cm thick grading concrete in cm (1:2:2) using 4.7mm size hg chips bajri including watering for curing etc including cost,conveyance,royalty & taxes if any etc as per PW specification and direction of Er in Charge. complete. |
| 18 | Ground Floor |
| 19 | 6 mm thick C.P in cement mortor (1:4) including close deep cheeping to the ceiling of the roof including watering & curing with cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete asper PW specification & direction of Er in Charge. |
| 20 | Ground Floor |
| 21 | 16 mm thick cement plaster in cm (1:6) over brick masonary finished smooth after to inside portion after racking out joints to 12 mm deep including watering & curing,cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete as per PW specification and direction of Er in Charge. etc complete. |
| 22 | Ground Floor |
| 23 | 12 mm thick C.P in cement mortor (1:6) finished smooth over brick walls of outside surface after racking out the joints including watering & curing , cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete as per PW specification and direction of Er in Charge. |
| 24 | Ground Floor |
| 25 | Supplying fitting fixing GI window grills & gates with GI square bar as per approved design and drawing etc complete as per direction of Er in Charge |
| 26 | Ground Floor |
| 27 | Supply fitting and fixing vitrified in floors of size 600mmx600mm printed/coloured series of approved make confirming to IS;13755 on 20mm thick bed of cement motar (1:4) filling joints with white cement of approved quality including cost, conveyance of all materials labour ,T&P etc all complete asper PW specification & direction of Er in Charge. |
| 28 | Ground Floor |
| 29 | Providing and fixing Chequred tiles in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles & other materials, conveyance ,labour, T&Pas per PW specification & as directed by the Engineer-in-charge. |
| 30 | Ground Floor |
| 31 | Two coats of enamel painting over one coat of primer to GI grills & gates,etc.complete as per direction of Engineer-in-charge. |
| 32 | Ground Floor |
| 33 | Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to received painting including cost of scaffolding staging charges with cost of all materials taxs labour t & p etc. complete. |
| 34 | Ground Floor |
| 35 | Finishing wall with one coat wall primer water based of approved make and finished smooth and even surfaceto receiving painting including all labour, T & P, cost of paints as per the direction of Engineer-in-charge. |
| 36 | Ground Floor |
| 37 | Supplying fitting and fixing of 2 track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame , shutters and all fitting and fixtures |
| 38 | Ground Floor |
| 39 | Supplying fitting and fixing of openable UPVC Door with door frame of approved make with 6mm thick glass of approved quality complete with frame , shutters and all fitting and fixtures |
| 40 | Ground Floor |
| 41 | Finishing wall with water proofing weather coat paint of approved shade two coats to give an even shade including cost of paints ,labour,T&P &asper direction of Er in Charge |
| 42 | Ground Floor |
| 43 | Supplying,fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia 2mm thick circular pipr with Balustrade of size 32mm x 32mm x2mm @ 0.90mtr.c/c & stainless steel square pipe bracxing os size 32mm x 32mm x2mm in 3 rows in staricase as per approved design and specification,buffing,polishing etc with cost,conveyance,taxes of materials,labour,t & P required etc. complete. |
| 44 | Ground Floor |
| 45 | Distempering 2coats with distemper of approved shade on new work to give an even shade with cost of all materials taxs labour t&p etc complete. |
| 46 | Ground Floor Please Enable Macros to View BoQ information |