| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: |
| 2 | All Kind of Soil |
| 3 | Laying Cement mortar 1:4 (1 cement : 4 coarse sand) below crash barrier leg as bedding |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level : |
| 5 | Concrete of M10 grade with minimum cement content of 220 kg /cum |
| 6 | Concrete of M25 grade with minimum cement content of 300 kg /cum |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 8 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 10 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level |
| 12 | Concrete of M30 grade with minimum cement content of 350 kg /cum |
| 13 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 14 | Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 15 | Cement Plaster |
| 16 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) |
| 17 | 15 mm cement plaster on the rough side of single or half brick wall of mix1:6 (1 cement: 6 fine sand) |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 19 | Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture |
| 20 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 21 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 22 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer in-Charge. |
| 23 | With material conforming to Grade-III (size range 26.5 mm to 0.075 mm ) having CBR Value-20 |
| 24 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 25 | Multyplying by gst correction factor 0.973 on DSR items |
| 26 | Less Cost Index @0.09 % as per OM issued vide no. DG/Cost Index/13 dated 07.01.26 |
| 27 | Providing & fixing pre-fabricated precast solid open U shaped RCC drain, drain cover, box culvert, crash barrier, retaining wall, silt chamber etc, using wet-cast technology with self-compacting concrete of grade M-50 and thermo-mechanically treated (TMT) steel bars of grade Fe-550D including straightening cutting, bending, placing in position and binding, all complete upto plinth level with provisions of shear keys, connecting loops, necessary cutouts/holes lined with dowel tubes of required sizes for services with proper lifting arrangement of various thicknesses, shape and size using high quality steel molds including loading, transportation from factory to site of work, unloading, stacking at site and placing in final position with the help of required capacity cranes all complete as per IS-11447:1985 and as per approved shop drawings and design mix complete as per the directions of Engineer-in-Charge. The RCC precast drain along with drain cover taken together as an integrated system, shall be capable of carrying a wheel load of 5 Ton of vehicular load.The precast elements shall be manufactured in a controlled factory environment with approved methodology/technology having all facilities including automated steam curing, automated reinforcement cage making facility, NABL accredited in-house laboratory with all testing facilities etc. complete as per the directions of Engineer-in-Charge.The installation of RCC precast drain, drain cover, box culvert etc. shall be done in correct and final position with proper line, level and plumb at site after making all arrangements of requisite T&P e.g., cranes, push-pull jacks etc. for lifting, placing and alignment of elements within erection tolerance as per IS-15916:2020, as per approved shop drawings, complete as per direction of Engineer-in-Charge including cost of all material and all tools & machinery required for casting for all works up to plinth level complete as per the directions of Engineer-in-Charge. |
| 28 | Taking out of Existing M.S. Railing 1.50 Meter Long from central verge including Removal of richer mixes Cement Concrete work etc. and disposal of Unserviceable material to the approved dumping ground for which payment shall be made separately and stacking of M.S. Railing within 50 meter lead as per direction of Engineer-in-charge. |
| 29 | Credit of Old kerb stones received from the dismantling. The material received shall be the property of contractor after dismantling duly weight/measured before remaining from the site in the presence of Engineer-in-Charge or his authorized representative all completion as per direction of Engineer-in-Charge. |
| 30 | Credit for serviceable materials received from dismantling/demolishing of respective items including taking away from site, the serviceable materials will be the property of the contractor complete as per the direction of Engineer-in-charge. |
| 31 | TMT/Cold twisted bars |
| 32 | Credit of old dismantled MS steel/MS Angle/MS Flat/MS Bar etc. received after dismantling at site all complete as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |