| 1 | Cathodic Protection Monitoring and Maintenance Works (Including Manpower, Material,Liasoning with Local Authority & Transport) |
| 2 | ON / OFF PSP Monitoring of the Entire Pipeline network (Quarterly) |
| 3 | Monitoring & Maintenance of CPPSM / TRU along the P/L (Monthly). |
| 4 | Monitoring and Maintenance of Computerised Test stations (CTSU) wherever installed as per Scope of Work including downloading of data ( yearly or as per MNGL requirment) . |
| 5 | TLP (Including Material, Manpower & Transport) |
| 6 | SUPPLY AND INSTALLATION OF MTS/TLP of approved design as per existing installation including Terminal plates, diagram Plates foundation bolts, cable termination with lugs & numbering of TS etc, raising the old foundation further up to 1.5 feet around the 4\\" dia pipe of TLP with 1:2:4 cement concrete in each foundations complete in all respect as per the drawings, specifications and directions of the Engineer-In-Charge. (Normal Type) |
| 7 | With lower Bend & Foundation |
| 8 | Without Lower Bend & Foundation - Fixing on the existing foundation. |
| 9 | SUPPLY & INSTALLATION OF MTS/TLP suitable to accommodate the polarization cell along with complete terminal plate for cable connections, door, locking arrangement as per approved design , Synthetic Enamel paint and marking of Chainage Nos & etc. on TLPs, raising the old foundation further up to 1.5 feet around the 4\\" dia pipe of TLP with 1:2:4 cement concrete in each foundations, as per directions of Engineer in Charge. |
| 10 | With lower Bend & Foundation |
| 11 | Without Lower Bend & Foundation - Fixing on the existing foundation. |
| 12 | Shifting of MTS/TLP along with foundation an upto a maximum distance of 25 Metres as per Scope of Work |
| 13 | Repairing of MTS/TLP foundation with supply and replacement of foundation bolts & nuts |
| 14 | Repairing of MTS/TLP including supply and replacement of damaged door, door locks,terminal plate ,diagram plate |
| 15 | Repairing of AJB/ CJB including supply of new locks & latch for the outer enclosure |
| 16 | Supply & Installation of TLP door along with necessary weilding, hinges, allen bolt etc. |
| 17 | Pipe To cable connection-(Supply, Installation, Including Material, Manpower & Transport) |
| 18 | Pin Brazing on Charged Pipeline |
| 19 | Thermit Weld on Uncharged Pipeline |
| 20 | Supply and fixing of Neo-prene gasket |
| 21 | Supply of corrosion coupons with mangratic read swich and reference cell including 1c x 6 sq mm cable for reference cell and 1c x 10 sq mm cablefor corrosion coupon,pinbrazing connection encapsulation kit etc. |
| 22 | Transformer Rectifier Unit (Including Material, Manpower & Transport) |
| 23 | Supply & Replacement of Fauly control cards in TR unit ( Card No. CECO- 103A, CECO- 104C1, CECO- 105D1, CECO-106, CECO- 118B,CECO 107,CECO 118B & CECO118C) |
| 24 | Supply ,installation,testing and commissioning of Analog Meters |
| 25 | Supply ,installation,testing and commissioning OF Digital Meters |
| 26 | Supply & replacement of new / Repairing of faulty GPS interrupter with antenna |
| 27 | Supply and installation new contactors/MCBs in CP panel |
| 28 | Supply & Installation of fuses of different ratings in TRU. |
| 29 | Calibration of all meters of TRU (yearly) |
| 30 | Supply and installation of Display Board & Mother Board Type DB1 |
| 31 | Supply and installation of Silicon Controlled Rectifier SCR1 |
| 32 | Supply and installation of SCR and Diode Module |
| 33 | Supply and Installation of RC Surge Diverter |
| 34 | Supply and Installation of Auxillary Transformer-TR2(5 Winding) |
| 35 | Supply and installation of Reference Selector,Auto/Manual Mode,Coarse Selector,Fine Selector & Toggle switch |
| 36 | Supply and Installation of Filter circuit and lightining capacitor |
| 37 | Supply and Installation of Transformer Rectifier Unit contactor |
| 38 | Supply and Installation of Convert Module Voltage,current & PSP(4-20 MA) |
| 39 | Anode Ground Bed (Including Material, Manpower & Transport) |
| 40 | Supply of water and coke breeze to anode bed to maintain its resistance minimum Ohm.(Yearly) |
| 41 | Supply & Installation of set of resistors and shunts for AJB of various ratings as per instruction of EIC. |
| 42 | General Maintenance (Including Material, Manpower & Transport) |
| 43 | Supply and installation of pre-packed Magnesium anodes (7.7 Kg) |
| 44 | Supply and installation of pre-packed Zinc anodes (22 Kg) |
| 45 | Supply and installation of Zn ribbon anodes |
| 46 | Cable jointing / Repairing of underground Cable of size 4-10 Sq MM |
| 47 | Cable jointing / Repairing of underground Cable of size 25-35 Sq mm |
| 48 | Supply, installation, laying, ferruling/tagging and termination of cables of different sizes as per the attached drawing & requirement |
| 49 | 6 Sq.mm(PE/PVC,XLPE) |
| 50 | 10 Sq.mm(PE/PVC,XLPE) |
| 51 | 25 Sq.mm(PE/PVC,XLPE) |
| 52 | 35 Sq.mm(PE/PVC,XLPE) |
| 53 | Maintenance of Polarization Cells(Kirk cell 5kA) |
| 54 | Supply & Installation of Polarization Cell (Including Material, Manpower & Transport) |
| 55 | Supply and Installtion of Polarization cells at HT Line Crossings including Supply and installation of Type H Test stations of suitable size to accommodate the Static Type Polarsation Cells / replacement of smaller existing Test station with H Type wherever required for installation of the polarisation cell [As per Scope of Work] |
| 56 | Supply and Installtion of Polarization, polarization cells (Solid State -Static type), at HT Line Crossings including Supply and installation of Type H Test stations of suitable size to accommodate the Static Type Polarsation Cells / replacement of smaller existing Test station with H Type wherever required for installation of the polarisation cell [As per Scope of Work] |
| 57 | Supply, Installation, Testing and commissioning of Static type Spark gap arrestors across IJ's |
| 58 | Supply, installation, testing & commissioning of permanent reference cell as per the requirement (Make from approved vendor) |
| 59 | Supply, installation,testing & commissioning of computerised test stations(CTSU) with SIM & Monthly rental |
| 60 | 24 hours Data Recording, Data retrieval and Analysis using Portable Battery Power operated state of the art Digital Data Loggers at Critical Locations like Road /Rly / HT Line Crossings with analysis report as and when required as per SOW. |
| 61 | Repair pipe coating by cold applied tape including material,manpower required |
| 62 | Excavation & backfilling for coating Defect/fault locations |
| 63 | Checking effectivness of IJ (once in two year) |
| 64 | Inspection of cased crossing (once in two year) |
| 65 | Painting of TLP support structure and Foundation alongwith naming TLP and chainage No (as per MNGL requirment) |
| 66 | Ultrasonic Thickness Test of A/G piping at DRS,MRS,CGS & CNG station(Yearly) |
| 67 | CIPL Survey along the pipeline (NEW SOR) |
| 68 | DCVG at Selected location from CIPL Survey (NEW SOR) |
| 69 | AC Interfrence Survey (NEW SOR) |
| 70 | DC Interfrence Survey (NEW SOR) |
| 71 | ECDA Steel Network (NEW SOR) |
| 72 | The SOR includes Supply,Installation,Testing & Comissioning of TR unit of make mentioned in Tender,Construction of anode bed(deepwell) with groundbed assemblies, including supply of anodes with anode tail cable & acessories,Supply and installation of AJB,CJB, Permanent reference cell, Armoured cables of 1Cx6sqmm,1Cx4sqmm,1Cx35sqmm, 3Cx10sqmm & corrosion coupon with mantri as per the make & specifications mentioned in the tender. |
| 73 | Supply installation testing & comissioning of C P System TRU (NEW SOR) |
| 74 | Supply,Installation & Laying of AC Mitigator (NEW SOR) |
| 75 | Liasoning for permission Please Enable Macros to View BoQ information |