| 1 | Earth work in hard soil within initial lead and lift including rough dressing bed etc complete (Building & Compound Wall) |
| 2 | Supplying, filling in foundation and plinth with sand in layers not exceeding 23cum (9\\") thick including watering and ramming with the cost, conveyance, royality, taxes of all materials, labour, T & P required for the Work etc. complete as per specification and direction of the Engineer-in-Charge. (Building & Compound Wall) |
| 3 | Cement Concrete of proportion (1:3:6) in foundation and floors using 4cm (3/2\\") size clean hard black broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6\\") thick to the required level ramming watering and curring etc. complete including cost and conveyance of all materials with all taxes and royalities and all labour with T & P required for the work etc. complete including dewatering if required as per specification and direction of the Engineer-in-Charge.(Building & Compound Wall) |
| 4 | Brick work with Fly Ash Bricks 25 cm x 12 cm x 8 cm size having crushing strength not less than 75 Kg/Cm2 with dimensional tolerance +/- 8 percent in cement mortar (1:6) in Foundation & Plinth etc. complete as per specification and direction of the Engineer-in-Charge.(Building & Compound wall) |
| 5 | Brick work with Fly Ash Bricks 25 cm x 12 cm x 8 cm size having crushing strength not less than 75 Kg/Cm2 with dimensional tolerance +/- 8 percent in cement mortar (1:6) in Superstructure etc. complete as per specification and direction of the Engineer-in-Charge.(Building & Compound wall) |
| 6 | Reinforced Cement concrete (M-25) with 20mm down graded b.h.g.c.b. chips including cost, connveyance, royality, taxes, watering and curing etc. complete.(Building & Compound Wall) Column Base |
| 7 | Column & Beam |
| 8 | Plinth Band |
| 9 | Chajja |
| 10 | Roof Slab |
| 11 | Straightening bent up or coiled rods cutting bending, cranking, hooking, welding or jointing (if required) the M.S. Rods or Tor steel and binding wires and tying the grills hoisting lowering and placing in proper position as required for RCC works with cost, conveyance and taxes of M.S. Rods or Tor steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc. complete in all respect as per specification and direction of the Engineer-in-Charge. (Weight of binding wires will not be considered for payment and payment will be made on weight of M.S. Rods or Tor steel only).(Building & Compound Wall) Ground Floor |
| 12 | Lintel Beam |
| 13 | Supplying, fitting & fixing vitrified tile in floors of size 600mm x 600mm of approved make confirming to IS:13755 laid on 20 mm thick cement mortar (1:4) & filling joints with white cement of approved quality including cost of materials, labour T&P etc required for the work all complete as per direction of Engineer-in-charge.Ground Floor |
| 14 | Fixing tiles in Dadoos, skirting and risers of steps on 12 mm thick cement plaster(1:3) joined with neat cement slurry mixed with pigment to match the shade of the tile etc. complete as per direction of Engineer-in-charge.Ground Floor |
| 15 | 6 mm thick cement plaster (1:4) to R CC surfaces finished smooth including closed deep chiping and slury treatment etc. complete as per direction of the E.I.C. |
| 16 | 16 mm. Thick cement plaster (1 :6) over brick work including cost, conveyance and royalty etc. complete.(Building & Compound Wall) |
| 17 | 12mm thick CP in CM (1:6) including cost conveyance royalty of all materials(Building & Compound wall) |
| 18 | Providing, fixing and fitting of M.S. doors shutter frame, windows frame, shutter with grill gate etc. complete including cost, conveyance, T&P and all taxes of all materials etc. complete as per the direction of the Engineer-in-charge.(Building & Compound Wall) |
| 19 | Labour for fitting, fixing of M.S. Door / Window shutters, grill gates etc. including cost of all labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge.(Building & Compound Wall) |
| 20 | Painting two coats over a coat of primer on new iron works with any approved paint including cost of paint and primer etc. complete as directed by the Engineer-in-charge.(Building & Compound Wall) |
| 21 | Distempering two coats to walls with distemper of approved shade on new work to give an even shade including cost of distemper. |
| 22 | Finishing walls surface of walls with Acrylic wall putty (water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes, labour T&P etc. complete as per direction of the Engineer-in-charge. |
| 23 | Finishing out side wall surface with Weather Coat (I.S.I) two coats over a coat of primer with any approved shade including cost of all materials and labour (T&P) etc. complete as per the direction of Engineer-in-Charge.(Building & Compound Wall) |
| 24 | Providing CC (1:2:4) using 12mm chips with all cost etc complete |
| 25 | Providing fitting, fixing of Al. door with anodized Al. door section of 9202 as vertical member, 9201 as top, 9200 as bottom and middle member with frame section as 9221 with tapered clip number 4660 and the frame to be completed by means of jointing angle number 1855 including all cost of labour, T&P, hire charges of drilling machine, labour charges etc. complete excluding cost of laminated board. |
| 26 | Supplying, fitting, fixing up window (sliding type) made up aluminum section 9778 as windows frame, section No. 4095, 4096 and 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P excluding cost of glass etc. complete as per direction of the Engineer-in-charge. |
| 27 | Providing fitting & fixing of false ceilling with Aluminium anodised T section No. 3215 with 2'-0'' C/C, L section No. 1705 upto 15 micron on 4 walls to be fixed by means of steel screw and P.V.C. plug and the Aluminium grid 2'-0''x2'-0'' with prelaminated particle board suspended from ceiling etc. complete. |
| 28 | Dressed seasoned sal wood work framed and fixed (wrought and put up) in trusses, purlines,frames of doors, windows, ventilabours and beams |
| 29 | Providing and fixing of 30mm thick Flush Door Shutters conforming to IS:2002 (Part-I) decorative type, core of block board construction with frame of 1st class hard wood and and well matched teak 3 ply veneering with vertical grains or cross bands and face vineers on both face of shutters inclusive of 4 Nos. of Stainless steel Butt Hinges (100mm x 60mm x 2.5mm) 40mm stainless steel screws, Cylindrical Lock (Godrej-9843), Tower Bolt SS 10 x 300mm (Bathroom) (Godrej 3264), PVC Door Buffer with SS Screw, teak wood lipping around the edges & paste with 1.5mm thick laminate on both side of the flush door, etc. including cost of all materials, hardware fittings, cost of all labour, conveyance, loading, unloading, T&P, etc. complete as per the direction of Engineer-in-Charge. |
| 30 | Earth work in hard soil within initial lead and lift including rough dressing bed etc complete |
| 31 | Providing & laying 60mm thick factory made cement concrete interlocking paver block of M-35 grade made by block makine machine with strong vibratory compaction of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 32 | Filling foundation & plinth with excavated earth including cost of labour, T&P etc. complete. Please Enable Macros to View BoQ information |