|
| 1 | CCTV IR Camera 4MP Fixed Dome Camera |
| 2 | CCTV Fixed Bullet Camera 4MP |
| 3 | PTZ Camera 360 |
| 4 | Storage Server CCTV |
| 5 | VMS (Video Management System) Server |
| 6 | VMS License |
| 7 | Video Wall Decoder |
| 8 | Video Wall Display 55 inch |
| 9 | Wall Mount Frame |
| 10 | Front Maintenance Frame |
| 11 | Online 10 KVA UPS Power Backup System |
| 12 | LiFePO4 Battery Backup 180V/100AH, 18kW |
| 13 | Network Keyboard |
| 14 | CCTV Accessories |
| 15 | Accessories for UPS electrical wiring for appliance |
| 16 | GPON 4 Port OLT |
| 17 | PLC 1:8 Splitter |
| 18 | PLC 1:4 Splitter |
| 19 | PLC 1:2 Splitter |
| 20 | All Ratio Coupler |
| 21 | Patch Cord LC to LC |
| 22 | Patch Cord SC to SC |
| 23 | 8 Port ONT with PoE |
| 24 | 4 Port ONT with PoE |
| 25 | Fiber 2 Core |
| 26 | Fiber 6 Core |
| 27 | Fiber Network Accessories |
| 28 | UTP Cable |
| 29 | 6U Wall Mount Rack |
| 30 | Fiber Drop Box |
| 31 | Hard Disk |
| 32 | Smart Server Rack |
| 33 | Battery rack / cabinet / stand with insulation, labelling, and safety arrangement |
| 34 | SNMP / network monitoring card for UPS remote monitoring and alarm/event logging |
| 35 | Input/output electrical panel, bypass panel, isolator / MCB / MCCB, and associated protection arrangement for UPS system |
| 36 | Input-output power cabling from panel to UPS and UPS to load distribution point, complete with lugs, ferruling, glands, dressing, and termination |
| 37 | Earthing, surge protection, and bonding for UPS and battery systems |
| 38 | Floor-wise load distribution integration, testing, and commissioning of UPS power backup system |
| 39 | Video wall / large display system suitable for 24x7 operation (LED Display System P1.8 Indoor, 10 ft × 6 ft approx.) |
| 40 | Video wall controller / display controller with required input-output capability |
| 41 | Operator console desk for NOC use |
| 42 | Ergonomic operator chair |
| 43 | Monitoring workstation with required hardware for VMS / NOC monitoring operations |
| 44 | NOC equipment rack with accessories |
| 45 | Structured cabling, patch cords, patch panel, IO accessories, labelling, and cable management for NOC room |
| 46 | Power sockets, UPS-backed critical power points, grounding, and internal electrical arrangement for NOC room |
| 47 | Supply and installation of required software, client software, OS licensing, and integration for monitoring environment, NOC room installation, integration, testing, commissioning, and handover |
| 48 | Annual Maintenance Cost – 1 Year Please Enable Macros to View BoQ information |