|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. |
| 2 | In cement mortar |
| 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 4 | Uprooting & removal of wild growth & vegetations, plants, on bldg at any level upto 15 M by necessary scafolding and swing and providing & applying a dilute hydrochloric acid on the root area etc complete as directed by Engineer in charge. |
| 5 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 7 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | Half brick masonry with common burnt clay F.P.S. (non modular) bricksof class designation 7.5 in foundations and plinth in : |
| 9 | Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 10 | Grading roof for water proofing treatment with |
| 11 | Cement mortar 1:3 (1 cement : 3 coarse sand) |
| 12 | Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineer-in-Charge. |
| 13 | 15 mm cement plaster on rough side of single or half brick wall of mix : |
| 14 | 1:6 (1 cement: 6 coarse sand) |
| 15 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC (Volatile Organic Compound ) content less than 50 gram/ litre, of approved brand and of required shade and colour complete to give and even shade. |
| 16 | Old work (one or more coats) |
| 17 | White washing with lime to give an even shade : |
| 18 | Old work (one or more coats) . |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : |
| 20 | One or more coats on old work. |
| 21 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 22 | Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 23 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-harge. |
| 24 | With cement mortar 1:4 (1cement: 4 coarse sand). |
| 25 | Renewing glass panes, with putty and nails wherever necessary including racking out the old putty: |
| 26 | Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm). |
| 27 | Flush pointing with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement for flat tile bricks on top of mud phaska : |
| 28 | With F.P.S. brick tiles |
| 29 | Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank, including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba, all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) |
| 30 | Cleaning of chocked sewer line by diesel running vehicle mounting hydraulic operated high pressure suction cum jetting sewer cleaning machine fitted with pump having 4000 litres suction capacity and 6000 litres water jetting tank capacity including skilled operator, supervising engineer etc. for cleaning and partial de-silting of manholes and de-chocking of sewer lines. De-chocking and flushing of sewer line from one manhole to another by high pressure jetting system of 2200 PSI for sewer line from 150mm dia upto 300mm dia for all depth. |
| 31 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. : Internal work - Exposed on wall |
| 32 | 32 mm nominal outer dia. Pipes. |
| 33 | Arranging welding machine for welding of Broken steel componants such as Handels, fastners, hinges, grills, etc.as and where required as per the direction of Engineer-in-Charge. (rate includes labour & transportation of machine at site). |
| 34 | Cleaning of terrace / spouts / khurras / canopies / blocked chajjas including removal of algae, fungal element etc., by iron brush, broom, bleaching powder etc, and removing leaves, grass, dust, rubbish and other deposited and accumulated material etc.,also disposal of rubbish to dumping ground up to a lead of 50m.,all complete as per direction of E-I-C. Please Enable Macros to View BoQ information |