| 1 | Excavating trenches up to a depth of 1.65m and back filling the excavated trenches after laying the HDPE/PLB pipe with or without protection as per tender specification |
| 2 | i) In Non Rocky Soil /Soft Soil/Kachcha soil |
| 3 | ii) In Pucca Soil |
| 4 | ii) In Soft Rock Soil /Disintegrated (D.I.) Soil |
| 5 | iii) in Rocky soil/Hard Rock Soil |
| 6 | Laying of PLB HDPE duct by HDD method at a depth of 1.65 mtrs or more ( for single PLB pipe ) in Soft Soil |
| 7 | BSNL will supply PLB HDPE pipes/coil PP rope. |
| 8 | Laying of PLB HDPE pipe/GI Pipe/RCC pipe/DWC |
| 9 | Laying of single PLB HDPE Pipes/Coils, coupled with coupler |
| 10 | BSNL will supply PLB Pipe /PLB sockets/Coupler, End caps. |
| 11 | Laying and fixing G.I. pipes(Medium duty class having inner diameter of 50mm, as per ISI specification) in trenches on Bridges and Culverts with PLB HDPE pipes/Coils inside |
| 12 | Providing cement concrete 1:2:4 at Wheel guard of bridge/culvert over the toe or in the trench for protection 25cm* 25cm over 40mm Dia PLB pipe |
| 13 | Providing cement concrete 1:2:4 over the PLB HDPE PIPE with wire mesh (as per specification of tender) in the trenches for protection, where the depth is less than 120 Cms (Cement Concrete as per specification) 25cm* 25cm over 40mm Dia PLB pipe |
| 14 | Cable laying by Pulling/blowing |
| 15 | Laying of OF Cable by Pulling/blowing method including opening of Manhole, Sealing of PLB HDPE Pipes |
| 16 | Splicing of cable |
| 17 | Splicing of fibers in existing/new Joint chambers for making straight/branch joints on new routes or at FPOI and end to end testing of all fibers after splicing. Including installation cost (6F,12F & 24F) |
| 18 | Splicing of all the fibers of (6F, 12F & 24F) OF cable in the fibre termination box at the Gram Panchayats and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified. |
| 19 | Splicing of fibers (48F) in existing/new Joint chambers for making straight/branch joints on new routes or at FPOI and end to end testing of all fibers after splicing. Including installation cost |
| 20 | Splicing of all the fibers of (48F) OF cable in the fibre termination box (FDMS) at the Exchanges and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified. |
| 21 | Splicing of fibers (96F) in existing/new Joint chambers for making straight/branch joints on new routes or at FPOI and end to end testing of all fibers after splicing. Including installation cost |
| 22 | Splicing of all the fibers of (96F) OF cable in the fibre termination box (FDMS) at the exchanges and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified. |
| 23 | Jointing Chamber |
| 24 | Construction of Bricks joints chamber as per specification and the construction practice as specified in the tender document |
| 25 | Construction of pre fabricated RCC joints chamber as per specification and the construction practice as specified in the tender document |
| 26 | Digging of pits for Existing Joint Chamber, filling of Joint Chamber with clean sand & back filling of jointing pit as per tender specifications. |
| 27 | Note: ALL materials required for the work shall be arranged by the contractor. |
| 28 | Route indicator |
| 29 | Digging of pit 1 mtr towards jungle side on each main hole/joint chamber for fixing of route/joint indicator fixing & concreting of route/joint /route indicator painting & sign writing of route including supply of Joint/route indicator |
| 30 | Restoration of road surface |
| 31 | Road restoration work with bituminous macadam for semi grouting 50mm thick and premix carpet surfacing 25mm thick over the grouted surface ( total up to 75mm thick ), including supply of asphalt etc. to evenly match the road, including consolidation and rolling as per standard specification of DSR 1997 |
| 32 | Road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225mm, including supply of concrete to evenly match the road. |
| 33 | Note: ALL materials required for the work shall be arranged by the contractor. |
| 34 | Route index Diagram |
| 35 | Supply of route index diagram in hard as well as soft copy on CD for complete Work |
| 36 | Videography of the route on which cable is laid |
| 37 | Note: The contractor shall arrange all materials required for the work. |
| 38 | Laying of OF cable in buildings( Leading in work) |
| 39 | Laying of OF cable in corridor/risers/exchange premises (leading work) |
| 40 | Mounting of FDMS at OLT locations |
| 41 | Physical mounting of FDMS/WSC on wall Please Enable Macros to View BoQ information |