| 1 | Fitting and providing one HT stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 2 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane. |
| 3 | Transferring LT Three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 4 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 5 | Additional rate for refitting/redoing one Shackle Set, including reschacling ene span, while renewing any type of LT pole. |
| 6 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 7 | Re-joining one snapped LT conductor after removing damaged portion including Reshackling and conveyance of all materials complete. |
| 8 | Fitting and providing one strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 9 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle) |
| 10 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or painting the surface of line supports where numbers are to be inscribed, pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The numbers and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5 cm in width. including cost of paint. |
| 11 | Fitting and providing on HT Fly stay for 11 kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing suffcient length of GI earth leads to the ground for earthing (Excluding provision of earthing). |
| 12 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11KV DP including Conveyance of materials. |
| 13 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing |
| 14 | Drilling hole of various sizes on existing Channel/Cross arm |
| 15 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 16 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 17 | Striginging of one km 3 PH 11KV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works |
| 18 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 19 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 20 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading&unloading charges. |
| 21 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point |
| 22 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing suffcient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 23 | Providing concrete muffing of size 0.45x0.45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 24 | Fitting one set (3No.) 11KV LA and giving connections excluding earthing. |
| 25 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, Strut etc. attached thereon and stacking the same. |
| 26 | Fitting and erecting one HT PSC Single pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing suffcient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). Please Enable Macros to View BoQ information |