| 1 | Dismantling of 800KVA T-1 Transformer from HT & LT side cable i/c of transportation from water works 32 to workshop with the help of hydra crane etc. complete in all respect as per site requirement at water works sec-32 Chandigarh. |
| 2 | Dsimantling of transformer, replacement of HV & LV winding (Copper) all three phase, assembly, frying in oven, tanking repalcement of gasket, repalcement of tap changer, replacement of flexible supply & filling of transformer oil (1340 Ltr) replacement of explosion vent, replacement of sundry items, testing of transformer, painting, loading etc. (i/n less against old material). |
| 3 | Re-fixing of 800 KVA T-1 Transformer HT & LT side cable i/c of HT end joint, thimble, glass tape, nut bolts etc. complete as per site requirement, installing and testing at full load after transportation from workshop to water works-32 with the help to help of hydra crane at water works sec-32, Chandigarh. |
| 4 | Replacement by providing and fixing of 11 KVA HT CT ration 200/100/5.5 i/c cost of thimble, insulation empire tape, PVC tape etc. complete in all respect at W/w-Sec-32, Chd. |
| 5 | Repalcement of LV copper studs with insulation complete in all respects in 800 KVA trasformer at W/w Sec-32 Chd. |
| 6 | Repalcement of HV copper stud with insulation i/c cost of packing sheet etc. complete in all respect in 800 KVA transformer at W/w Sec-32 Chd. |
| 7 | Repair of delta break 3 no. i/c the cost of ferrule, wire, wire complete on HT side in 800 KVA at W/w Sec-32 Chd. |
| 8 | Repalcement of gasket i/c labour charge for dismantling of top coverconservator etc. complete in all respects re-fixing of cables i/.c of nut bolts, washers etc. complete in all respects in 800 KVA transformer at W/w sec0-32 Chd. |
| 9 | Topping up of transformer oil by providing and fixing of dehydration T-oil make Bentex, HP, Indian oil etc. complete in all respects in 800 KVA transformer at W/w sec-32 Chd. |
| 10 | Repair of bus bars in HT panels by dismantling of bus bars & replacement by providing and fixing of HT sleeves i/c of nut bolt etc. complete in all respects installed for 11 KV sub-station at W/w sec-32, Chd. |
| 11 | Repalcement by providing and fixing of insulated 3.5 core 400mm aluminum armored condutor cable of working voltage 11000 volt i/c of aluminum thimble with crimping & taping etc. complete in all respects as per site requirement from transformer to CT panels at W/w Sec-26,Chd. |
| 12 | Repairing of 400 Amp. HT OCB by replacement of burnt parts such as complete insulator with base 3 no. tulip contacts, 06 no. main contact 03 set auxiliary contacts repair of cradle & replacement of trasformer oil 120 ltrs, complete in all respect at substation at W/w sec-26, Chd. |
| 13 | Less against old material Please Enable Macros to View BoQ information |