| 1 | Repair to damaged RCC slabs, beams and columns etc for strengthening with cement mortar 1 : 2 in following steps :-Choping losse and cracked concrete to required depth, cleaning the exposed surface of steel and concrete with wire brush and sand papering , cleaning of concrete surface with water as necessary and getting dried.Choping losse and cracked concrete to required depth, cleaning the exposed surface of steel and concrete with wire brush and sand papering , cleaning of concrete surface with water as necessary and getting dried.Applying Epoxy primer on the exposed steel bars.Applying Epoxy hardener and resin mix (as per manufectured's specification) on concrete and steel bars with brush.Speading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day.Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete.Cure the plastered surface for 15 days, All work including scaffolding etc. complete in all respect. |
| 2 | Providing and fixing \\"Stone Kalasha\\" as per existing matching on doms od chattries/jharokhas as per existing design & dimensions as per traditional practices, fixing of kalash carefully without damaging the doms complete in all respect.Sand stone/approved stone Kalasha |
| 3 | (iii) Marble Kalasha height.(exposed part) 90cm. to 100cm. |
| 4 | Removing/ dismambering of disturbed \\"Architectural Parts\\" of \\"Shikhar\\" (Varandika, venukosha, Bhumi, Amalaka, Laghu Shikhar, Urushringa, Skandha, Griva, Amalasaraka, Chandrika, Kalasha ) without damaging the parts by machenical/manual system carefully with proper marking and complete documentation including all scaffolding and shuttering work, stacking the useful architectural parts in proper sequence at proper place as per direction of Engineer incharge (for all lead and lift.) |
| 5 | Steel-rod stitching incracked stone patties, beam,and lintels.Providing and fixing stainless steel rods of 90cms length of which 15cm on either side and cold bending at 90degrees. The stainless steel clamps to be fixed perpendicular to the crack by drilling in stone and fixing with cement and aradite mixture in such a way that the entire length of the rod is in complete contact of the stone and the bent ends are fully inserted in the cracked stone. Use 316 grade stainless steel charge per hole.steel rod charges are counted per kg.Holes with 6mm, 8mm, 10mm or 12mm dia.as per requirement of position. |
| 6 | Chemical treatment of marble stone to clean from yellowness, blackness, algal growth, dust, dirt oily accretions, lime & gypsum deposits, filling of cracks/ joining of gaps/ pointing, strengthening of weak stone, removal of salt effect and application of preservative coating to prevent algal growth and make the stone water proof. |
| 7 | Refixing of fine dressed \\"Architectural Parts\\" of Marble stones Pillar/ Todies/ Arches and Lintel etc including Missing design, Ornamental carving and Chemical wash/adasive scaffolding upto 10 mtr height fixing of architectural parts by machenical/manual system carefully as per existing architecture including all scaffolding and shuttering work in proper sequence as per direction of Engineer incharge |
| 8 | Providing and fixing of fine dressed \\"Architectural Parts\\" of Marble stones Pillar/ Todies/ Arches and Lintel etc including Missing design, Ornamental carving and Chemical wash/adasive scaffolding upto 10 mtr height fixing of architectural parts by machenical/manual system carefully as per existing architecture including all scaffolding and shuttering work in proper sequence as per direction of Engineer incharge |
| 9 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story height made with 40mm dia. M.S. tube 1.5 m centre to centre horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. (To be used for maintenance work judicially . necessary deduction for scaffolding in the existing item to be done.) |
| 10 | Propping with steel to support the leaned structure ( roof and wall) using pipes, channels, angles, girders , wooden wages to prevent further leaning/ collapse ,mode of measurement( 1.the plan area of the propping shall be for payment purpose. 2. the payment will be made once only for execution of all item such work. ) |
| 11 | Providing & fixing Pure white marble jali 40mm thick as per design & drawing approved by engineer In-Charge/Architect. including pointing with admixture of pigment matching with the stone shade. with proper adhesive /clips/ Cramps, pins and scaffolding, etc. All inclusive of transportation, loading & fixing. Stone and design shall be got approved by the authority before start of work. All work shall be done as per direction and satisfaction of authority, Complete as per PWD Specifications. Please Enable Macros to View BoQ information |