| 1 | Earthwork in excavation of foundation in hard soil including levelling and dressing the bed and sides depositing muck within intial lead and lifft etc. Compl. |
| 2 | Supplying, filling in foundation and plinth with sand, watered and rammed including cost, conveyance & royality and all taxces of materials cost of all labour with T&P etc. complete. |
| 3 | Cement Concrete (1:3:6) with 40mm size H.G..C.B. metal in F&P etc. All complete. |
| 4 | Cement Concrete (1:2:4) with 12mm size H.G.C.B.. chips |
| 5 | Brick work with 1st class C.B.Bricks / Fly ash brick in cement mortar (1:6) in F&P of size 10\\"x5\\"x3\\" having crushing strength not less than 75 kg/cm² with dimensional tolerance ± 8% including splays cutting circular moulding chamfering and corbelling and sim |
| 6 | RCC M-20 work with 20mm down grade course aggregate. |
| 7 | Column base |
| 8 | Tie beam |
| 9 | Col. Above pl. |
| 10 | Straightening bent up or coiled M.S. rod or HYSD steel (Fe- 415), cutting, bending, cracking, hooking, welding or jointing (if required), the M.S rod or HYSD steel and binding, tying the grills, hoisting, lowering and placing in proper position as require ( Icluding 4% VAT ) |
| 11 | Brick work with 1st class C.B.Bricks / Fly ash brick in cement mortar (1:6) in superstructure of size 10\\"x5\\"x3\\" having crushing strength not less than 75 kg/cm² with dimensional tolerance ± 8% including splays cutting circular moulding chamfering and corbelling and sim |
| 12 | 16mm (⅝\\") thick cement plaster (1:6) finshed smooth to rough surface of 9\\"/10\\" thick brick walls after racking out the joint including watering and curing with cost and conveyance, royalties and taxes of all materials and labour charges |
| 13 | Wall priming one coats on new work with wall water bound primer of approved shade etc. |
| 14 | Wall painting with two coats weather coat paint of approved shade on new work |
| 15 | Cleaning and grubbing road land including uprooting rank vegetation ,grass ,bushes , shrubs ,saping and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unservicealbe materials and stacking of serviceable materials to be used or auctioned up to lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. as per direction of engineer in charge . |
| 16 | Const.of embankment witrh approved material obtained from borrow pits with all l lifts and leads , transporting to site by mechanical means within a lead of 5 kms , spreading, grading to required slope and compacting etc. |
| 17 | Provision for display board |
| 18 | Add O & M charges @ 2% for 3 Years Please Enable Macros to View BoQ information |