| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. |
| 2 | Filling in foundatin and plinth with sand watered and rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge |
| 3 | Cement concrete (1:4:8)with 4cm size hard granite metal per 1cum |
| 4 | R.C.C M-20 works including centering & shuttering (R.C.C. foundation, plinth band and footings bases of columns mass concrete pre-cast slabs etc details for 10 Sqm) |
| 5 | R.C.C M-20 works including centering & shuttering (R.C.C.beams,column,grider and bressmer, etc. ) |
| 6 | R.C.C M-20 works including centering & shuttering (R.C.C. Lintels ) |
| 7 | R.C.C M-20 works including centering & shuttering (R.C.C. Chajja ) |
| 8 | R.C.C M-20 works including centering & shuttering (RCC floor & roof slabs, landings, balconies, projecting, sun shade, R.B work, slab for culverts/drains & bridges ) |
| 9 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 10 | 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips. On new work per 1 sqm. |
| 11 | Brick work with Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in foundation and plinth per cum. |
| 12 | Brick work with Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in foundation and plinth per cum. Super structurer |
| 13 | 12mm. thick cement plaster (1:6) for brick work |
| 14 | Supplying, fitting and fixing vetrifed tile in floors of size 600mm x 600mm of approved make conforming to IS: 13755 laid on 20 mm thick cement mortar (1:4) (1 cement :4 course sand ) and filling joints with white cement of approved quality including cost of all materials , labour T & P etc required for the work all complete as per direction of Engineer-in Charge.(For New work only) |
| 15 | Fixing tiles in floors trades or steps and landing on 25mm bed of cement mortar 1:1 jointed with neat cement slury mixed with pigment to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles per 1sqm (data for 10sqm) chequer tiles |
| 16 | Finishing surface of walls with Cement based wall putty (Water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T&P etc complete. |
| 17 | Providing fitting and fixing of false ceilling with Aluminium anodised T Section No.3215 with 2'-0\\" center to center, L section No. 1705 upto 15 micron on 4 walls to be fixed by means of steel screw and P.V.C plug and the Aluminium grid 2'-0\\"x2'-0\\" with prelaminated particle board suspended from ceiling etc complete |
| 18 | Iron work for door, window, grills, welding, Labour, carrrage placing in position etc complete . |
| 19 | Supplying, fitting and fixing of two track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures. |
| 20 | Supplying, fitting and fixing of openable UPVC doors with door frame of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures. |
| 21 | Painting two coats with enamel paints over one coat of primer with approved quality paints & primer to Wood/Iron work including cost of paints & primer,T&P and labour charges etc complete. |
| 22 | Wall painting with plastic emulsion paint of approved shade on new work of two coats over one coat of primer including cost of paints & primer and labour charges etc complete. |
| 23 | Fixing of Wall Cladding Tiles series in dado, skirting and risers of steps on 12mm thick cement plaster in mortar (1:3) joined with neat cement slurry mixed with pigments to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles in ground floor. |
| 24 | Finishing wall surface with weather coat paint of approved shade on new work of two coats over one coat of primer including cost of paints & primer and labour charges etc complete. |
| 25 | Branding Signage (2' x 2') Logo - round glow board of Millet Shakti |
| 26 | Millet Shakti Café (2' x 8') (English) and (Oriya) |
| 27 | Govt. Of Odisha logo ,Mission Shakti Logo , Odisha Millet Mission logo - (1'x1') in size. |
| 28 | Arcylic Glow board for display menu.(4' x 7') |
| 29 | Add for Transparancy board,Taking photograph |
| 30 | Internal Electrifications |
| 31 | Ph and sanitary fitting Please Enable Macros to View BoQ information |