| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.2.8.1 All kinds of soil. |
| 2 | Brick work with common burnt clay (non modular) bricks of class-150 in super structure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 Cement : 4 Coarse sand ) DSR 6.4.1 |
| 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. SOR 692 |
| 4 | Scraping old white or colour wash including disposal of refuse as directed by E/I with in a distance of 60 metres 708 |
| 5 | Providing and applying white cement putty of average thickness 1mm of approved brand and manufacture over the plastered wall surface to prepare the surface even and smooth complete. SOR 13.80 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.8 |
| 7 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete.SOR 11.37 |
| 8 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufacturer, in all colours and shade, in skirting, riser of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately).( PWD SCH 11.47.2) |
| 9 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (DAR-6.1.1) |
| 10 | 17.7 Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps each SOR 17.7.1 |
| 11 | Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing of edges to give high gloss finish etc. complete at all levels. granite of any colour and shade area of slab over 0.50 Sqm (DSR 8.2.2.2 Ch. 8) |
| 12 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 4.1.3 |
| 13 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. (SOR 18.48) |
| 14 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete (DAR 8.31 ch 8) |
| 15 | Supply and filling of 40mm first class brick bats of sockpit. |
| 16 | 12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and |
| 17 | 17.1 Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests (DAR 17.1.1 ch. 17 ) |
| 18 | Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as doirected by the E/I with in a distance of 60 meters. PWD SCH 694 Ch. 17 |
| 19 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer10.5.1 Using M.S. angels 40x40x6 mm for diagonal braces. SOR 10.5.1 |
| 20 | Providing and fixing factory made uPVC white colour casement/casement cum fixed glazed windows comprising of uPVC multi-chambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, stainless steel (SS 304 grade) friction hinges, zinc alloy (white powder coated) casement handles, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & |
| 21 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. 25 mm nominal dia Pipes (SoR 18.8.3 CH 18) |
| 22 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources: REF DAR 4.1.2 ch. 4 . |
| 23 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. 15 mm nominal dia Pipes (DSR 18.8.1) |
| 24 | Reinforcement of Reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and including the supply of plain steel and its waistage Bend, hooks, Binding wire and authorized over lapping shall be measured upto floor two level. (Hardoi Schedule) |
| 25 | Mild steel or iron works of small size and section such as holding bolts hold fasts tei, rod, gratings etc. (when not included in an over all rates) wrought to required form including supply of steel bolts, nuts, and wastage etc and their fixing required for proper competion of the work. SOR 502 |
| 26 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge20 mm nominal dia Pipes DSR 18.8.2 |
| 27 | P/F CP brass long nose bib cock of approved brand qual;ity to is standards and weighing not less than 810 gms. 15 mm nominal dia (SOR18.50.1) |
| 28 | 18.53 Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 15mm nominal bore (SOR 18.53.1) |
| 29 | Fly proof stainless steel grade 304 wire gauge with 0.5 mm dia. wire and 1.4mm wide aperture with matching wood beading 9.7.80Dsr ch. 9 |
| 30 | 17.31 Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete (SOR 17.31) |
| 31 | Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coat DSR 13.82.2 |
| 32 | Finishing walls with exterior paint of required shade : New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm (DSR 13.46.1) |
| 33 | Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour.13.82.1 One coat old |
| 34 | Providing and fixing factory made uPVC glazed/wire mesh windows/ doors comprising of lead free uPVC multi-chambered frame, sash and mullion/coupler (where ever required) extruded profiles having minimum wall thickness of 1.70 mm for Series R1 and R2 profiles and 2.10 mm for Series R3 and R4 profiles conforming to EN: 12608 in any shape, colour and design duly reinforced with galvanized mild steel section made of required shape & size as per CPWD Specification, uPVC extruded glazing beads, interlocks and Inline sash adaptor (where ever required) of appropriate dimension, EPDM gasket, hardware, SS 304 grade fasteners of minimum 8 mm dia with countersunk head, comprising of matching polyamide PA6 grade sleeve for fixing frame to finished wall as per IS 1367 : Part 1 to 14, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame, sash & mullion (if required) shall be mitred cut and fusion welded/mechanically jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap betweenframe and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of approved size and quality, all complete as per approved drawing conforming to CPWD specification & direction of Engineer-in-Charge. Section of steel reinforcement and cross sections of uPVC profiles to be as per design approved by Engineer-in-Charge. Wire mesh / Glazing of plain/ toughened/ laminated/ double glass unit with / without high performance coatings as per design requirements andconforming to IS: 3548 & IS: 16231 shall be paid separately.Note:- Structural design proof checked from a GovernmentEngineering Institute, to be provided by the manufacturer for :(i) Sites with basic wind speed > 45 m/sec as per IS 875 – Part 3(ii) Sites with structure height more than 20m for all wind speeds |
| 35 | Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazedshutters 25 mm to 40 mm thick. Float glass panes5 mm thick glass pane (weight not less than10 kg/sqm). SOR 10.30.2 |
| 36 | Providing and fixing in position collapsible steel shutters with verticalchannels 20x10x2 mm and braced with flat iron diagonals 20x5 mmsize, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm diasteel pulleys, complete with bolts, nuts, locking arrangement, stoppers,handles, including applying a priming coat of approved steel primer DSR 10.3 |
| 37 | Painting with synthetic enamel paint of approved brand and manufactureof required colour to give an even shade : One or more coats on old work. SOR 642+643 |
| 38 | Water Bound Macadam (22.40-53) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 39 | Bitumen tack coat over painted surface including maintained of side parties and watering them during operation including supply of labour materials, fuel wood and T&P etc. required for proper completion of work as per M.O.T. specification No. 502 and as per direction of Engineer-in-charge. |
| 40 | Providing and laying 40 mm thick Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix , transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all respects. |
| 41 | Maintenance cost of 1ndyear @0.00% cost of work ( Item No : 53 to 60) |
| 42 | Maintenance cost of 2ndyear @0.25% cost of work ( Item No : 53 to 60) |
| 43 | Maintenance cost of 3ndyear @0.50% cost of work ( Item No : 53 to 60) |
| 44 | Maintenance cost of 4ndyear @0.75% cost of work ( Item No : 53 to 60) |
| 45 | Maintenance cost of 5ndyear @1.00% cost of work ( Item No : 53 to 60) Please Enable Macros to View BoQ information |