| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer, Fazilka Canal & ground water Division, WRD Punjab, Ferozepur. Name of Work: ESTIMATE FOR FLOOD RISK MITIGATION BY STREGTHENING OF OLD CITY BUNDH RD 1700-24600 OF RIVER SUTLEJ U/S HUSSAINIWALA HEAD WORKS TO PROTECT FEROZEPUR CITY AND NEARBY VILLAGES IN TEHSIL AND DISTRICT FEROZEPUR. Contract No: 01632 292604 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SRNo. Item Description Item Code / Make Aprox. Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Clearance of weed jalla, della, sarkanda, jungle butti silt etc. manually from inner section of lined channel. Discharge 0.283 but upto 1.42 cumec |
| 3 | Clearance of weed jalla, della, sarkanda, jungle butti silt etc. manually from inner section of lined channel. Discharge Upto 0.283 Cumec |
| 4 | Excavation of soil using excavator and hydrualic tractor trolley i/c cutting and loading in trolley and transporting to the embankment all locations including all lifts and leads ,excluding royalty. |
| 5 | Excavation in soil (any type) using Hydraulic Excavator CK 90 Excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead upto 30m. |
| 6 | E/Work for lip cutting of irrigation Channels inclusive of all allowances, lead and dressing (upto 1.50 mtr depth) |
| 7 | Extra for compaction of earth including laying earth in 20cm layers, watering and rolling to specifications. |
| 8 | Dressing of side slopes and preparation of sub grade for lining complete in all respect as per PWD specifications and engineer-in-charge. |
| 9 | Single layer brick lining for irrigation channels (Distributaries and minors) or section of all depths consisting of first layer of 12.5mm thick cement plaster 1:5 on subgrade and finished, second layer of 10mm thick cement plaster 1:3 properly rendered and finished, 75 mm bricks laid in 1:3 cement sand mortar over second layer(In side slopes for all sections) |
| 10 | Laying brick on edge coping 229mm wide and 115mm thick in cement sand mortar 1:3 as per PWD specifications i/c supply of material complete in all respect. |
| 11 | Raking out joints in lime or cement mortar and preparing the surface for repointing or replastering including cost of neat coat of cement disposal of rubbish to the dumping ground within 50 m lead. (31.16) |
| 12 | Earth work involved in dismantling gullet walls of outlets for adjusting ‘Y‘ of A.P.M. or ‘B‘ of open flume outlets:- a) With ‘H‘ upto 0.5 mtr |
| 13 | Earth work involved in dismantling gullet walls of outlets for adjusting ‘Y‘ of A.P.M. or ‘B‘ of open flume outlets:- b) With ‘H‘ more than 0.5 mtr but upto 0.9 mtr |
| 14 | Adjusting A.P.M. to the correct ‘Y‘ and fixing in position in case of outlets where dismantling and reconstructing of gullet walls is involved without change in width of gullet i.e. ‘B‘ of the outlet b) With ‘H‘ more than 0.5 mtr but upto 0.9 mtr (CSR item no. 20.4-b/ii) |
| 15 | Steel work fixed independently without connecting plates including cutting hoisting and fixing in position RS joists ,flats,tees angles and channels |
| 16 | Fillet welding 6mm wide with High strength steel rods, complete in all respects and to entire satisfaction of Engineer in charge |
| 17 | 12.5 mm thick cement plaster 1:5 |
| 18 | Dressing of bed and preparation of sub grade fir lining |
| 19 | Any Other Item Total in Figures 0.0 0.0 INR Zero Only Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |