| 1 | Prepration of subgrade excluding cost of earth work including cost of labour and T&P, etc. charges etc complete |
| 2 | Earth work in foundation in dry ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30 m and including filling, watering and ramming of excavated earth. |
| 3 | Laying C.C. 1:4:8 with coarse sand dala stone grit of 20-40mm size including cost of all material, labour and T&P etc. required for proper completion of work. |
| 4 | Laying CC 1:2:4 Coarse sand with mechanical mixing by batching plant including all cost of materials, labour and T&P etc. required for proper completion of work. |
| 5 | Laying CC 1:1.5:3 Coarse sand with mechanical mixing by batching plant including all cost of materials, labour and T&P etc. required for proper completion of work. |
| 6 | Ist Class brick work in 1:4 C.M. with coarse sand and cement including all cost of materials, labour and T&P etc. required for proper completion of work. |
| 7 | Bending, Binding, Cutting and Placing of reinforcement including cost of binding wire but excluding cost of steel. |
| 8 | Fabrication of mild steel iron grill work including cutting, drilling, welding / Revetting where necessory and Fixing in position including cost of all material labour , T & P etc. Required of proper complition of work with two coat of red oxide primer and erection of steel Gate at site. |
| 9 | Earth work in Canals with manual compaction and dressing including cost of labour and T&P etc |
| 10 | Earth work in correcting internal section of Main,Branches canals and drains by using machine like J.C.B, Porclain etc including proper dressing and disposal |
| 11 | Fabrication of mild steel iron work of gate/regulator gate including cutting, drilling, welding / Revetting where necessory and Fixing in position including cost of all material labour , T & P etc. Required of proper complition of work with two coat of red oxide primer and erection of steel Gate at site. |
| 12 | Struck deep pointing in 1:2 C.M. on brick work including cost of all material, labour and T&P etc. required for proper completion of work. |
| 13 | Supplying & laying of 125 micron polythene sheet under the foundation (for anti salt peter treatment) or over sub base to act as seperation between sub-base and conc. slab for (C.C. Road slab) including supply of all materials, labour and T&P etc. below C.C. linning for proper completion of work. |
| 14 | Dry Stone Boulder Pitching, filling joint with sand including cost of all type of labour , material T&P etc. icluding cost of boulder for proper completion of work. |
| 15 | Gauge Painting at Regulator of canal including all material, labour and T&P etc. required for proper completion of work. Please Enable Macros to View BoQ information |