| 1 | Reconductoring LT line with ABC |
| 2 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 3 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 numbers of poles. (Running km) |
| 4 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 5 | Erection of suspension clamp for LT ABC of any size |
| 6 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 7 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messenger through existing poles |
| 8 | Providing Cable Tie |
| 9 | Installing One No. Insulation piercing connector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 10 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap : 4-35 sqmm |
| 11 | Installation of Insulation piercing connector for main to service line main:25-95 sqmm, Tap : 25-95 sqmm |
| 12 | Installation of Insulation piercing connector for main to service line main:50-150 sqmm, Tap : 4-35 sqmm |
| 13 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap 16-95 sqmm |
| 14 | Providing End Caps |
| 15 | Installing One No. 4 way Satellite Connector of size Main :16 to 95,Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 16 | Fitting of one No. pole top service connection box of standard size (up to4 way) using ss strap/B&N of suitable size in to the PSC/A poles at thestandard height excluding giving connections |
| 17 | Installing one pole top service connection box single phase 6 way and giving connections. |
| 18 | Installing one pole top service connection box three phase 6 way and giving connections. |
| 19 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 20 | Renewal of existing damaged/broken old LT stay in existing stay rod |
| 21 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly |
| 22 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 23 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 24 | Dismantling (without damage) one LT PSC/RCC pole after disconnectingstays, strut etc. attached thereon and stacking the same. |
| 25 | Dismantling one damaged LT TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 26 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc. attached thereon and stacking the same. |
| 27 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 28 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 29 | Dismantling one section fuse from structure and bringing back to section store. |
| 30 | Straightening one slanted LT pole after unbinding the line and binding the line after work. |
| 31 | Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles. |
| 32 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 33 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 34 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards),drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 35 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 36 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 37 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards),drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 38 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 39 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 40 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. Please Enable Macros to View BoQ information |