|
| 1 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 2 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 3 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 4 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 5 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 6 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 7 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 8 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 9 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 10 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 11 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 12 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 13 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 14 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 15 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 16 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 17 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 18 | Erection of suspension clamp for LT ABC of any size |
| 19 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 20 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 21 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size Please Enable Macros to View BoQ information |