| 1 | Dismantling |
| 2 | Dismantling of existing fire hydrant MS pipeline - 3\\", 4\\", 5\\", 6\\", 8\\", 10\\" |
| 3 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement: 4 coarse sand) |
| 4 | Supply, installation, Testing and commissioning of 8 inch size, 6 mm thickness, MS black Class C pipes as per IS: 1239 with Tees, Elbows, Couplings, unions, reducers etc. and all such connecting devices that are needed to complete the work of FIRE HYDRANT PIPE LOOP to interconnect existing fire hydrant pipe line network from hangar 2 & 3 pump room to hangar 2 & 3 respectively. Approved Make : TATA/ Jindal |
| 5 | Supply, installation, Testing and commissioning of 6 inch size, 6 mm thickness, MS black Class C pipes as per IS: 1239 with Tees, Elbows, Couplings, unions, reducers etc. and all such connecting devices that are needed to complete the work of FIRE HYDRANT PIPE LOOP to interconnect existing fire hydrant pipe line network from hangar 2 & 3 pump room to hangar 2 & 3 respectively. Approved Make : TATA/ Jindal |
| 6 | Supply, installation, Testing and commissioning of 5 inch size, 6 mm thickness, MS black Class C pipes as per IS: 1239 with Tees, Elbows, Couplings, unions, reducers etc. and all such connecting devices that are needed to complete the work of FIRE HYDRANT PIPE LOOP to interconnect existing fire hydrant pipe line network from hangar 2 7 3 pump room to hangar 2 & 3 respectively. Approved Make : TATA/ Jindal |
| 7 | Supply, installation, Testing and commissioning of 4 inch size, 6 mm thickness, MS black Class C pipes as per IS: 1239 with Tees, Elbows, Couplings, unions, reducers etc. and all such connecting devices that are needed to complete the work of FIRE HYDRANT PIPE LOOP to interconnect existing fire hydrant pipe line network from hangar 2 & 3 pump room to hangar 2 & 3 respectively. Approved Make : TATA/ Jindal |
| 8 | Supply, installation, Testing and commissioning of 3 inch size, 6 mm thickness, MS black Class C pipes as per IS: 1239 with Tees, Elbows, Couplings, unions, reducers etc. and all such connecting devices that are needed to complete the work of FIRE HYDRANT PIPE LOOP to interconnect existing fire hydrant pipe line network from hangar 2 & 3 pump room to hangar 2 & 3 respectively. Approved Make : TATA/ Jindal |
| 9 | Repair/ servicing of Gate/Butterfly Valves - 10 inch |
| 10 | Repair/ servicing of Gate/Butterfly Valves - 8 inch |
| 11 | Repair/ servicing of Gate/Butterfly Valves - 6 inch |
| 12 | Surface preparation & painting of entire hydrant pipeline with one coat of primer and 2 coats of qualitative enamel paints of approved shed. |
| 13 | Replacement of detoriated support brackets of suitable sizes (10\\", 8\\", 6\\", 5\\", 4\\", 3\\") |
| 14 | Hydrostatic testing & commissioning Please Enable Macros to View BoQ information |