|
| 1 | PERMANENT RESTORATION OF PROTECTION WORK AT OSSU NALLAH AT SPOTS |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 4 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 5 | carraige of stone from nearby nallah to site of work for an average distance of 500Mtr by H.L |
| 6 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 7 | PERMANENT RESTORATION OF KOTLI BALA NALLAH AT SPOTS |
| 8 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil |
| 9 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 10 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 11 | carraige of stone from nearby nallah to site of work for an average distance of 8km bt MT and 200Mtr by H.L |
| 12 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 13 | PERMANENT RESTORATION OF PROTECTION WORK IN KHERI AND KAIRA NALLAH AT SPOTS |
| 14 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge |
| 15 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 16 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 17 | carraige of stone from nearby nallah to site of work for an average distance of 550Mtr by H.L |
| 18 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 19 | RMANENT RESTORATION OF PAKHLAI NALLAH AT SPOTS |
| 20 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge |
| 21 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 22 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 23 | carraige of stone from nearby nallah to site of work for an average distance of 550Mtr by H.L |
| 24 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 25 | PERMANENT RESTORATION OF BASANTRI NALLAH AT SPOTS |
| 26 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge |
| 27 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 28 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 29 | carraige of stone from nearby nallah to site of work for an average distance of 700Mtr by H.L |
| 30 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 31 | PERMANENT RESTORATION OF DHAR GADDIAN NALLAH AT SPOTS |
| 32 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge |
| 33 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 34 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 35 | carraige of stone from nearby nallah to site of work for an average distance of 10KM by MT |
| 36 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete |
| 37 | PERMANENT RESTORATION OF PROTECTION WORK AT KAH RIVER TAWI AT SPOTS |
| 38 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge |
| 39 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 40 | Supply of stone including loading, unloading and stacking at site excluding carriage |
| 41 | carraige of stone from nearby nallah to site of work for an average distance of 550Mtr by H.L |
| 42 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4\\"x4\\" mesh size including loading, unloading, stacking and carraige complete Please Enable Macros to View BoQ information |