| 1 | ITEM NO-1 Clearing the site |
| 2 | ITEM NO-2 Dismantling the old lime concrete or cement concrete including stacking the material with all lifts etc. complete as directed |
| 3 | ITEM NO-3 Excavation in soft soil,silt,soft murum,lime, shadu,etc.including depositing the materials as directed with all leads and lift including dressing,as directed. |
| 4 | ITEM NO4 Excavation in hard murumincluding depositing the materials as directed with all leads and lift including dressing,as directed. |
| 5 | ITEAM NO -5 Excavation in soft rock as on the .including depositing the materials as directed with all leads and lift including dressing,as directed. |
| 6 | TEAM NO -6 Providing and fixing deformed cold twisted ( Tor ) steel reinforcement bars as per design & drawing including cuttings , bending , hooking and binding with G.I.Wires with all leads & lifts etc. complete as directed and as per specifications. |
| 7 | ITEAM NO-7 Providing and laying in situ cement concrete of grade M-20 of trap / granite / gneiss /quartzite / graded metal for RCC works of gallery, sluice, spillway crest, spillway training walls, piers, abutments, slab etc. with downstream face, energy dissipating structures, intake structures,Concrete Mixer including shuttering and scaffolding, placing, compacting, curing with and initial lead of 1 km and all lifts etc. complete as directed |
| 8 | ITEAM NO-8-Providing and construction of a gabion structure for retaining earth with segments of wire crates each divided into 1.5 m compartments by cross netting, made form 4 mm galvanized steel wire @ 32kg per 10 sqm having minimum tensile strength of 300Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826 woven into mesh with double twist, mesh size not exceeding 100x100mm, filled with boulders with least dimension of 200mm, all loose ends to be tied with 4mm galvanized steel wire etc. complete |
| 9 | ITEAM NO-9 Providing and laying rubble soling below foundation in layers including filling with rubble chips, murum etc. complete as directed. |
| 10 | ITEAM NO-10 Providing casing embankment using selected pervious material from approved borrow areas (Government acquired land) in layers of including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of water etc., complete with lead up to1 km and all lifts as directed. |
| 11 | ITEAM NO-11 Providing R.C.C .pipe of NP2 class conforming to IS458 2003 of following diameter including cost of all material and labour required, inspection charges, transportation to stores, transit insurance, loading, unloading and stacking excluding GST levied by GOI and GOM in all respect etc. complete as directed.c) 900 mm dia |
| 12 | ITEAM NO-12 Laying and jointing R.C.C. pipe of NP2 class or IRC standard in C.M. 1:2, proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing etc. complete with all lifts as directed.Laying and jointing R.C.C. pipe of NP2, 900mm dia |
| 13 | ITEAM NO-13 Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing etc.,complete with lead up to 1 km and all lifts as directed |
| 14 | ITEAM NO-14 Back filling up to ground level behind the C.N.B. structure etc. complete wirh out Royalty with suitable Material of approve qulity in layer not exceeding 20 cm with out distubring the stucture etc. complete. |
| 15 | TEAM NO-15 Roylaty Charges |
| 16 | Add for 1% Govt.Insurance |
| 17 | Add for 1% contingencies |
| 18 | Add for 1% supervision charges Please Enable Macros to View BoQ information |