| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. (a) All kinds of soil |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (a) 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (a) Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 6 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. (a) 40 mm thick with 20 mm nominal size stone aggregate |
| 7 | Providing and fixing glass strips in joints of terrazo/ cement concrete floors. (a) 40 mm wide and 4 mm thick |
| 8 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer, of required shade and colour all complete : (a) Two coats |
| 9 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC (Volatile Organic Compound ) content less than 50 gram/ litre, of approved brand and of required shade and colour complete to give and even shade. (a) Old work (One or more coats) |
| 10 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : (a) One or more coats on old work |
| 12 | Renewing glass panes, with putty and nails wherever necessary including racking out the old putty: (a) Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm) |
| 13 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. (a) Nominal concrete 1:4:8 or leaner mix (i/c equivalentdesign mix) |
| 14 | Manual labour for uplifing/shifting of existing telecom equipment, racks and replacing on existing location for reconstruction of damaged floor etc. all complete as per direction of Engineer-in-charge. |
| 15 | Repairing of wooden door shutters by removing from hinges and refixing with required repairs for smooth operation etc. all complete as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |