| 1 | Installing One No. 4 way SatelliteConnector of size Main :16 to 95, Tap:4to 35 Sq.mm to the LT AB cable ofStandard size |
| 2 | Transporting LT ABC by hired vehicleto a distance up to 5 km and carring upto 2 drum including loading and unloading using crane |
| 3 | Stringing of 1.1 kV Aerial bunchedcable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messengerthrough existing poles |
| 4 | Erection of Anchor clamp / dead endclamp for LT ABC of any size |
| 5 | Installing One No. Insulation piercingconnector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 6 | Dismantling (without damage) one kmLT three phase 4 wire OH line conductorby dismantling cross arms, insulatorsand stacking the conductors in rollsproperly |
| 7 | Dismantling (without damage) one kmLT additional conductor line bydismantling cross arms, insulators andstacking the conductors in rolls properly |
| 8 | Erecting one LT PSC Pole in positionincluding digging & back filling pit inordinary soil |
| 9 | Labour charges for loading LT PSC polefrom the stacking place and unloadingthe same at work site (transportation byany vehicle) |
| 10 | Providing Stay for LT poles includingdigging & back filling pit in ordinarysoil. |
| 11 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit (0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinarysoil & backfilling. |
| 12 | Erection of suspension clamp for LTABC of any size |
| 13 | Installation of Pre-insulated straightthrough joints for 16sqmm cable |
| 14 | Installation of Pre-insulated straightthrough joints for 70sqmm cable |
| 15 | Installation of Insulation piercingconnector for main to service line main:16-95 sqmm, Tap 16-95 sqmm |
| 16 | Reconductoring (changing) one km LTsingle phase 3 wire OH Copper/oldAAC/ACSR conductor line with new 2ACSR Rabbit and one ACSR Weaselconductor including conveyance ofmaterials to and from the stacking place. |
| 17 | Reconductoring (changing) one km LTsingle phase 2 wire OH Copper/oldAAC/ACSR conductor line with newACSR Rabbit conductor includingconveyance of materials to and from thestacking place |
| 18 | Disconnecting and lowering down thesingle phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work |
| 19 | Disconnecting and lowering down thethree phase WP service connection withguy wire from the OH line andreconnecting the same after completingthe line work |
| 20 | Renewal of existing damaged/old LTPSC/RCC (three phase line) pole withnew PSC pole in place includingexcavation of pole pit, erection of newpole, backfilling pit and refitting of allitems except street light fitting etc. andconveyance of all materials except pole |
| 21 | Additional rate for refitting/redoing oneShackle Set, including reshacling onespan, while renewing any type of LTpole. |
| 22 | Renewal of existing damaged/old LT Flystay of any type of pole with new Flystay including renewal of PSC pole(used for fly stay) in place, excavation ofpit, erection of new Fly stay, backfilling,dismantling & refitting of all items andconveyance of all materials except pole |
| 23 | Renewal of existing damaged/broken oldLT stay in existing stay rod. |
| 24 | Renewal of existing damaged/old LTStrut of any type with new PSC strut inplace including excavation of pit,erection of new strut, backfilling,consolidating, dismantling and refittingof all items and conveyance of allmaterials except pole. Please Enable Macros to View BoQ information |