| 1 | Dismounting of Electro mechanical machinery (V.T. Motor) from its installed position. The job also includes remounting of the same after repairs & making connections & testing on full load conditions. The job includes cost of labour, tools & tackles. |
| 2 | Dismounting of Electro mechanical machinery (25 kVA Electric Transformer) from its installed position. The job also includes remounting of the same after repairs & making connections & testing on full load conditions. The job includes cost of labour, tools & tackles. |
| 3 | Manual / Mechanical carriage of Electro Mechanical Equipment (V.T. Motor and Electric Transformer) from T/well site to W/shop & then back to T/well site after repairs. The job includes cost of labour, carriage, tools & tackles (Complete Job). |
| 4 | Restoration of collapsed Electric Sub Station by way of Supply, Transportation, Erection of 9 mtr. long 2 No. PCC Poles including excavation of pit and back filling of soil and consolidating by ramming, watering, etc. The job includes supply, transportation and fixing of G.I. channel, cross arms, angle iron braces, clamps including all necessary nuts, bolts, etc. The job also includes supply installation and testing of 11 kV GO, AB Switch 3 phase, 3 pole, 200 Amp, 11 kV horn gap fuse set 3 phase 200 Amp, gapless surge arrestor 9 kV, 120mm single core cable 40 mtr in length along with distribution box for 63 kVA DTR with MCCB along with other allied equipments required as per site. |
| 5 | Complete Dismantling of Electro Mechanical Equipment (V.T. Motor) and extraction of old burnt out / worn out / damaged parts. The job also includes assembling the same after repairs. The job includes cost of labour, tools & tackles, carriage, etc. (Complete Job). |
| 6 | Complete rewinding of stator of 20 H.P. Vertical Turbine Motor by way of cleaning of slots & rewinding with copper wire of required specifications, then complete insulating and varnishing of stator. The job includes cost of material, labour, tools & tackles (Complete Job). |
| 7 | Complete Dismantling of Electro Mechanical Equipment (25 kVA Electric Transformer) and extraction of old burnt out / worn out / damaged parts. The job also includes assembling the same after repairs. The job includes cost of labour, tools & tackles, carriage, etc. (Complete Job). |
| 8 | Complete rewinding of H.V & L.V leg coil of electrical transformer by Providing & Fitting of new H.V / L.V leg coils. The job includes cost of material, labour, tools & tackles (Complete job). |
| 9 | H.V leg coil with insulation (AL) |
| 10 | L.V leg coil with insulation (AL) |
| 11 | H.V Bush |
| 12 | L.V Bush |
| 13 | H.V Bush Rod |
| 14 | L.V Bush Rod |
| 15 | Gasket Set |
| 16 | Insulation Material |
| 17 | Providing & Fitting of new parts listed below in place of old burnt out / worn out / damaged ones:- The job includes cost of material, labour, tools & tackles, carriage. (Complete job). |
| 18 | Volt meter |
| 19 | Ampere meter |
| 20 | Finger connector (Copper) |
| 21 | Moving connector (Copper) |
| 22 | No volt coil |
| 23 | 100 Amps Kit Kat Fuse |
| 24 | Sundry items |
| 25 | Transformer Oil Please Enable Macros to View BoQ information |