|
| 1 | Cleaning jungle including uprooting etc all complete |
| 2 | Scraping oid white or colour wash including of refuse materials all complete |
| 3 | E/W Excavation in foundation in ordinary soil including filling lift upto 1.5 mtr and lead upto 30m including filling watering and ramming of excavated earth into the trenches etc all compt. As per SI no. 251 |
| 4 | P/L PCC 1:6:12 in cement, Fine Sand and 40mm brick ballast including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete as per SI no. 273 |
| 5 | First class 150 brick work in 1:4 cement:C.sand mortar all compt. As per SI no. 305(b) |
| 6 | RCC 1:1.5:3 in cement, C. Sand and 20mm stone grit in RCC Slab. All complete as per SI no. 284 B |
| 7 | M.S. iron in plain work such as reinforced concrete or reinforced brick work worought to required shape as necessary including bendin for proper completion of work including supply of all steel and over laping and hook all compt. As per SI no. 504 |
| 8 | M-150 B/W in 1:4 cement &C sand all completeSI NO 305b |
| 9 | Plaster work with 1:3 cement and c-sand mortor side all complete SI NO 583 |
| 10 | P/A White cement based putty all complete SI NO 13.8 |
| 11 | Fiinishing wall with premium exterior all complete SI No 13.47 |
| 12 | Providing corrugated G.S all complete 275 gm 12-1-1 |
| 13 | M.S. iron in plain work heveay size such as door and window all complete laping and hook all compt. As per SI no. 503 |
| 14 | RUBBER INTERLOCKING |
| 15 | E/W Excavation in foundation in ordinary soil including filling lift upto 1.5 mtr and lead upto 30m including filling watering and ramming of excavated earth into the trenches etc all compt. As per SI no. 251 |
| 16 | P/L PCC 1:6:12 in cement, Fine Sand and 40mm brick ballast including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete as per SI no. 273 |
| 17 | First class 150 brick work in 1:4 cement:C.sand mortar all compt. As per SI no. 305(b) |
| 18 | 12mm thick plaster in 1:3 cement:C.sand mortar all compt. As per SI no. 583 |
| 19 | construction of granular sub- base all complete |
| 20 | P/L rubbermoulded reflective Zig-Zag 80mm providing and laying of interlocking concrete block pavement having thickness 80 mm as per drawing and technical specification clause 1504 SI no. 6.7 |
| 21 | P/L CC 1:2:4 in cement, C. Sand and 20mm stone grit and including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete as per SI no. 279(b) |
| 22 | CONSTRUCTION GATE |
| 23 | E/W Excavation in foundation in ordinary soil including filling lift upto 1.5 mtr and lead upto 30m including filling watering and ramming of excavated earth into the trenches etc all compt. As per SI no. 251 |
| 24 | P/L cement concrete 1:4:8 in cand cement all complete |
| 25 | R.C.C column in 1:2:4 cement csand stone all complete |
| 26 | R.C.C column in 1:1:5:3 cement csand stone all complete 286A |
| 27 | 12mm thick plaster in 1:3 cement:C.sand mortar all compt. As per SI no. 583 |
| 28 | M.S. iron in plain work such as reinforced concrete or reinforced brick work worought to required shape as necessary including bendin for proper completion of work including supply of all steel and over laping and hook all compt. As per SI no. 504 |
| 29 | Centering and shuttering all complete |
| 30 | P/F 18 mmthick gange saw all complete |
| 31 | Mild steel or iron work in heavy zize all complete |
| 32 | S/F marble white dungri 16to 18 mm all complete |
| 33 | P/F of façade at all hight all complete |
| 34 | S/F of sign board all complete Please Enable Macros to View BoQ information |