| 1 | PART-A |
| 2 | DISMANTLING WORK OF OLD & USED 20 MVA T/F |
| 3 | Partially drain out the Transformer oil into empty oil drum up to required level from main tank for opening of radiator , conservator tank , bushing, electrical connections , earthing , Jumper etc. at 132 KV S/s Rajapakar. |
| 4 | Complete & Safe Dismantling the accessories of 132/33 KV used 20 MVA T/F (NGEF make) including opening of Jumpers , removal of earthing , opening of cable connection, Pipe , HV Bushing , Cooling Fans , Marshalling Box , conservator tank , turret etc. with proper stacking , blanking plate including bolts & nuts shall be provided by the contractor. |
| 5 | Packing and placing into store the dismanteled HV/LV/Neutral bushing of 20 MVA T/F in new 63 MVA T/F empty wooden creates at 132 KV S/s Rajapakar, Kushinagar. |
| 6 | Shifting of used 20 MVA T/F from plinth to safe place up to 30 Mtrs. Distance including turning to main tank if required including all T&P and work required to complete the job satisfactorily. |
| 7 | Additional Shifting 30 Mtrs. @ 5 Mtrs. Per Job. |
| 8 | Dismantling of used 33 KV Current Transformer (800-400-200/1A) with the help of derik pole , pully and rope arrangement. Shifting of dismantled CT from work site to store all cost of men, T&P etc. to be provided by the contractor at his own cost for completion of work. |
| 9 | ERECTION OF NEW 63 MVA T/F |
| 10 | Shifting of new 63 MVA T/F tank from unloading place to plinth up to 20 Mtrs. Distance including turning to main tank if required including all T&P and work required to complete the job satisfactorily. |
| 11 | Additional Shifting 70 Mtrs. @ 5 Mtrs. Per Job. |
| 12 | Complete Erection of 63 MVA , 132/33 KV Power Transformer by erection of its radiators, conservator tank , all bushings, their turrets, connecting oil pipe line, cooling fans , motor drive mechanism of tap changer, oil pimps and associated pipe lines , HV LA etc. to complete the job satisfactorily including first filling if oil and topping up of transformer oil (Not circulation) in tank , radiators oil pipe line, conservator tank etc. and attending the oil leakage if any and all othe associated works for satisfactory completion of work at 132 KV S/s Rajapakar, Kushinagar. COntractor shall provide all assistance getting the transformer succesfully commissioned by providing qualified manpiwer till commissioning , including the cost of all men , T&P and aoosicted arrangements. |
| 13 | Centrifusing of complete Transformer oil (20 KL) of new 63 MVA ,132/33 KV Power Transformer in transformer tank or oil tanker by connecting centrifusing pipes, circulating the transformer oil through centrifusing machine to be provided by the contractor and taking the BDV values of the oil periodically till the required value of the oil is achieved as per direction of supervising Engineer at 132 KV S/s Rajapakar, Kushinagar. All T&P , labour , centrifusing machine and other associated arrangements shall be provided by the contractor at his own cost. |
| 14 | Dismantling of all cable connection of 20 MVA T/F and its RTCC panel , re-termination along with re-glanding and re-ferruling as per new cable schedule of 63 MVA T/F and its RTCC panel. |
| 15 | Laying of control cable in cable trenches from control panel to marshalling box of 63 MVA T/F as per schedule and interconnection with control cable at marshalling box and RTCC panel to each fan with ferruling and cable marking with all other associated works to complete the job satisfactory. |
| 16 | Earthing of main tank of 63 MVA T/F , RTCC panel by using of size 75x10/50x6 mm, MS Flat m its jointing with already lain earth mat preparing neutral bushing support, excavation of trenches for earthing work, its back filling etc. MS Flat will be provided by Contractor at his own cost. |
| 17 | Jumpering of T/F from HV with Moose/ Zebra conductor and LV side with double Moose/ Panther complete up to 33 KV Main Bus. |
| 18 | Erection of new 33 KV Current Transformer (1200-800/1A) with the help of derik pole pulley, skilled labour and rope arrangement . Shifting and dragging of new CT from store to work site. All cost of men , T&P shall be provided by the contractor as his own cost for completion of work. |
| 19 | Meking new Delta for new 63 MVA power transformer HV & LV side by placing 03 Mtr. Long 40 mm dia MS earth Electrodes inside earth (As per standard specification) and connecting with X-Y earth mat by 75x10 mm MS Flat (MS Flat shall be provided by department free of cost). Painting the joints with black japaan paint with all other associated work to complete the job satisfactory, earth including all cost of material as per Technical specification. |
| 20 | Laying of 40 mm dia 3000mm MS Earth electrodes on the distance of 6 Mtrs. Along the side of grid 6x6 Sq. Mtr. Work including soil excavation and boaring of Electands and welding , Joint using angle bars , painting by Black paint welding joints and then back filling of soil . Required 40 mm dia 3 Mtr. long MS earth Electrodes are to be provided by contractor at his own cost . |
| 21 | Earthing of main and auxiliary structure after cutting, bending , laying of following size of MS Flat for equipment structure , CT, PT, CB, LSI, BSI etc. including welding with main earth mat 700 mm or old layed made with object to each excavation of trenches its back filling , painting with synthetic enemal green color above ground and all associated work to complete the job satisfactorily excluding cost of MS Flat. |
| 22 | MS Flat of size 75x10 mm |
| 23 | MS Flat of size 50x6 mm |
| 24 | Transformer oil sample collection testing of Transformer oil at CPRI or any other NABL accredited Lab including cost of Transportation of each sample in standard sampling bottels, |
| 25 | Break Down Voltage |
| 26 | Moisture Content |
| 27 | Dissolve Gas Analysis |
| 28 | Repairing of Pale Fencing by providing new nut and bolts whereever required and welding of upright and runner , damaged/broken/ rusted places as per actual needs including cost of all materials, labour, T&P at 132 KV S/s Rajapakar. |
| 29 | Painting of above repaired pale fencing at 132 KV S/s Rajapakar with one coat of red oxide primer and two coat of good quality green synthetic enameled paints including cost of labour , T&P and materials. |
| 30 | PART-B |
| 31 | MS Flat for Earthing |
| 32 | 75x10 mm |
| 33 | 50x6 mm |
| 34 | Pale Fencing |
| 35 | PG Clamp & Fittings |
| 36 | PG Clamp Suitable for Moose/Moose |
| 37 | PG Clamp Suitable for Moose/Panther |
| 38 | Clamp (All type) and Connectors ( for 132 KV Work) including rigid, expension , TEE type etc. |
| 39 | 120 KV LA Clamp Suitable for Twon Moose |
| 40 | 132 KV CT Clamp suitable for twin Moose |
| 41 | 132 KV CB Clamp suitable for Twin Moose |
| 42 | 132 KV Isolator Clamp suitable for Twin Moose |
| 43 | 132 KV LA Clamp suitable for Zebra |
| 44 | 132 KV CT Clamp suitable for Zebra |
| 45 | 132 KV PT Clamp suitable for Zebra |
| 46 | 132 KV CB Clamp suitable for Zebra |
| 47 | 132 KV Isolator Clamp suitable for Zebra |
| 48 | PG Clamp suitable for Zebra to Zebra |
| 49 | Clamps and Connectors (For 72.5 KV & 36 KV Work) |
| 50 | 36 KV , Isolator Clamp suitable for Twin Moose |
| 51 | 36 KV , CT Clamp suitable for Twin Moose |
| 52 | 36 KV , VCB Clamp suitable for Twin Moose |
| 53 | 36 KV Post Insulator (P.I.) |
| 54 | Fire Fighting Equipments |
| 55 | Supply of following Fire extonguisher carbon dioxide as per IS Specn. No. 2878/1986 and Tech. Specification. |
| 56 | Mechanical Foam 50 Litre |
| 57 | Mechanical Foam 09 Litre |
| 58 | Co2 22.5 KG |
| 59 | Co2 9 KG |
| 60 | Co2 4.5 KG |
| 61 | ABC Powder 4.50 KG |
| 62 | Supply of Sand Buxket as per Tech. Specification. |
| 63 | Sand Bucket Stand suitable for 10 Nos. bucket as per Tech. Specn. |
| 64 | Single headed Hydrant Valve 63 |
| 65 | Hose Box (suitable for 2x15M Hose) |
| 66 | Hose Pipe 63 x15M Long |
| 67 | Branch Pipe with Nozzle 63 |
| 68 | Lighting System |
| 69 | Lighting Panel type ACP-3 as per Technical Specification |
| 70 | LED Flood Light Lumaniries type FL-1 (150W) as per Technical Specification. Please Enable Macros to View BoQ information |