| 1 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed within 50m initial lead & 1.5m initial lifts with sundries & T&P requried for the work complete |
| 2 | Filling foundation and plinth with sand well watered and rammed (per Cum.)including all costs of labour, T&P etc. complete as per direction of EIC. |
| 3 | Providing & laying PCC (1:3:6) with 40mm size black hard granite metal in including all labour, materials & royality etc. complete as per direction of EIC. |
| 4 | R.C.C. work M-20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials Including centring and shuttering etc. complete as per direction of Engg-in-Charge . A. COLUMN BASE |
| 5 | PLINTH BAND |
| 6 | COLUMN & BEAM(G.FLOOR) |
| 7 | LINTEL(G.FLOOR) |
| 8 | CHAJJA(G.FLOOR) |
| 9 | ROOF SLAB (G.FLOOR) |
| 10 | Supplying,fitting and placing uncoated HYSD bar reinforcement as per drawing and technical specification including cost,conveyance and all taxes of steel and binding wire etc.complete as per direction of Engg-in-Charge .(G.FLOOR) |
| 11 | Fly ash Brick masonry work in cm (1:6) in F&P using fly ash bricks (25cmx12cmx8cm) having minimum crushing strength not less than 35 kg /cm2 with dimesional tolerance + 8 %after immersing the bricks for six hour in water before use in F&Pincluding splays cutting & circular mouilding, hoisting,, watering, curing etc with cost of all labour T&P for the work in all respect as per the direction of Engineer in-charge. Cost and conveyance of all materials labours all taxes T&P etc all complete. |
| 12 | Fly ash Brick masonry work in cm (1:6) in S/S using fly ash bricks (25cmx12cmx8cm) having minimum crushing strength not less than 35 kg /cm2 with dimesional tolerance + 8 %after immersing the bricks for six hour in water before use in F&Pincluding splays cutting & circular mouilding, hoisting,, watering, curing etc with cost of all labour T&P for the work in all respect as per the direction of Engineer in-charge. Cost and conveyance of all materials labours all taxes T&P etc all complete. |
| 13 | 12mm thick cement plaster in CM (1:6) to outer wall surface on brick work both side including all costs of labour etc. complete as per direction of E.I.C.(Outer side wall) |
| 14 | 16mm thick cement plaster in CM (1:6) to inner wall surface on brick masonary in side including all costs of labour etc. complete as per direction of E.I.C. |
| 15 | 6mm thick cement plaster (1:4) to ceiling R.C.C surface including all cost of labour complete as per direction of E.I.C. |
| 16 | 20mm. thick grading plaster in c.m. 1:4 over roof slab and chujja including cost conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge . |
| 17 | Supplying fitting fixing of M.S.Grill using 12mmx12mm size MS square bars, 20mmx5mm MS flats, MS angles of approved size for Grill gate, PCC(1:2:4) for clamp fixing cost & conveyance of all materials, labours , T&P, all fabrication, erection and fitting in position etc all complete as per direction of E.I.C. |
| 18 | Supplying, fitting and fixing vitrified tile 60x60cm 8 to 10 mm thick in floors of approved make confirming to IS : 13755 laid on 20mm thick C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, takes labour T&P etc required for the work. per 1 sqm (Data for 10 sq.mt.) |
| 19 | Vitrified tile in dado over 12mm thick cm(1:3) with cost conveyance taxes & royalties of all materials &cost of all labours T&P required for work etc. complete in all respect as per the direction of Engineer in charge. |
| 20 | Finishing wall surface with acylic putty shade two coat over new plaster surface including all cost, conveyance & royalty etc complete as per direction of the Engineer-in-charge. |
| 21 | Priming one coats to wall with water bound cement primer of approved shade including all cost, conveyance & royalty etc complete as per direction of the Engineer-in-charge. |
| 22 | Distempering two coats to walls Finishing wall with with distemper of approved shade on new work to give an even shade,including cost, conveyence, royalties, taxes etc of all materials, costs of all labour sundries T& P etc complete as per direction of engineer in charge. |
| 23 | Wall painting 2 coats with weather coat cement paint of approved shade on outer wall surface over a coat of water bound wall cement primer to give an even shade including cost of brushes and putty including cost of paint scrapping, cleaning rubbing, scaffolding including all costs of labour etc. complete as per direction of E.I.C. |
| 24 | Painting two coats with enamel paint with one coat of wood/steel primer including cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes etc all completes in all respects as per the direction of Engineer charges. Please Enable Macros to View BoQ information |