| 1 | Comprehensive repair and maintenance / major Overhauling of Diesel Engine Pump Set (2280 LPM): Full servicing of 60 HF engine; replacement of Mobil oil (specifiec grade), air/fuel/oil filters; replacement of 12V/24V heavy-duty battery (Exide/ Amaron); radiator flushing and coolant replacement; testing of self-starter and charging alternator etc or inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 2 | Comprehensive repair and maintenance of Main Electric Fire Pump (60 HP): replacement of heavy-duty ball bearings (SKF/FAG); replacement of mechanical seal/gland packing; greasing and coupling bush replacement /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 3 | Comprehensive repair and maintenance of Jockey Pump (15 HP): Rewindinq of motor with 'F' class copper insulation; replacement of bearings ano mechanical seal; shaft trueing and dynamic balancing of impeller /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 4 | Comprehensive repair and maintenance of Terrace Pumps (7.5 HP): General servicing of 2 Nos pumps; replacement of grease, oil seals, and testing of automatic float switches /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 5 | Comprehensive repair and maintenance of RRL Hose Pipes (Type-A): 15m length, 63mm dia Reinforced Rubber Lined (RRL) as per IS:636 (Type A) with Gunmetal/SS couplings securely bound with copper wire /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 6 | Comprehensive repair and maintenance of SS Branch Pipes: Stainless Steel (Grade 304) short branch pipe with 20mm nozzle. PWD approved design/inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 7 | Comprehensive repair and maintenance of Main Control Panel: Replacement of faulty contactors (L&T/ Schneider), Ammeters, Voltmeters, and faulty LED indicators; recalibration of Single Phase Preventer (SPP) and Star-Delta Starters /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 8 | Comprehensive repair and maintenance of First-Aid Hose Reel of 30m braided hose (if cracked); nozzle cleaning and lubrication of the swinging hub to ensure 180° rotation /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 9 | Comprehensive repair and maintenance of Fire Alarm System Restoration faulty Smoke/Heat detectors; checking of end-of-line (EOL) resistors; battery backup replacement for the main Fire Alarm Control Panel (FACP) including Comprehensive servicing of the main Power Amplifier and Pre-amplifier unit Includes replacement of faulty internal circuits, cooling fans, fuse assemblies, and calibration of the Master Controller Ensuring integration with the Fire Alarm Panel /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 10 | Comprehensive repair and maintenance of Tank Hygiene & Pipeline Protection: De-silting and high-pressure cleaning of 1.0 Lakh Liter UG tank; application of two coats of anti-corrosive svnthetic enamel paint (Post Office Red) on all exposed MS piping /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 11 | Comprehensive repair and maintenance of Terrace Water Tanks: Includes high-pressure de-silting, chemical cleaning, and disinfection of 10,000L tanks. Work includes repairing of manhole covers. replacement/ fixing of ball valves (float valves), repairing of overflow/ vent pipes, and ensuring water-tightness. The rate also includes cleaning of the surrounding terrace area and disposal of sludge /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 12 | Comprehensive repair and maintenance of ABC Extinguishers (4kg): Refilling with MAP 50% / 90% powder; hydro-testing of cylinders; replacement of discharge hoses and squeeze grips where needed /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 13 | Comprehensive repair and maintenance of CO- Extinguishers (4.5kg): High-pressure CO2 gas refilling; weight verification; replacement of discharge horn and safety pins /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 14 | Comprehensive repair and maintenance of Component Replacement: Replacement of leaking Butterfly valves (PN1.6 ratina), non-return valves, Foot valve, air cushion tank, hose box and pressure switches including cleaning and refreshing static pressure of 7kg/sqm /inculding changing of above required parts etc complete in all respect or as required as per actual site requirement. |
| 15 | Comprehensive repair and maintenance of 100 mm & 80 mm dia 'C' class MS pipe after testing including cutting and welding wraping coating and painting etc as required with removing debris and mud from hydrant pipe line to prevent nozzel pipes with labour cahrges and required above materials with T&P used or complete in all respect or as required as per actual site requirement. |
| 16 | Comprehensive repair and maintenance of all size of cable faulty checking reparing including changing cable above as required with cast resin compound including aluminium lugs and other jointing materials for following size with labour cahrges and T&P used or complete in all respect or as required as per actual site requirement. |
| 17 | Comprehensive repair and maintenance of all type of earthing testing with megar and other requried equipements including required materials of following size of related earthing with reveting, jointing, chemical compound wiht salt and charcoal etc as required with labour cahrges and T&P used or complete in all respect or as required as per actual site requirement. Please Enable Macros to View BoQ information |