Sales : +91-777 804 8217
| Sl. No. | Item Description |
|---|---|
| 1 | PNEUMATIC SYSTEM COMPRISING OF MAIN AIR COMPRESSOR ALONG WITH MOUNTING FRAM E ASSEMBLED WITH 3 PHASE INDUCTION MOTOR, FILTERS, AND PRESSURE SWITCHES, CONTROL & AIR DRY ER, FILTERS ETC., AS PER CLAUSE 4.35, 4.36, 4.37 & 4.38 OF RDSO SPECIFICATION. NO. RDSO/PE/SPEC/EM U/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM.THE BIDDER SHOULD INDICATE THE TYPE OF COMPRESSOR OFFERED IN THIS BID.(ONE RAKE SET), as per Drawing: AS PER CLAUSE 4.35, 4.36, 4.37 & 4.38 OF RDSO SPECIFICATION. NO. RDSO/PE/SPEC/EMU/0196-2019 (REV-0) WITH LATEST ADDENDU M/CORRIGENDUM, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHE NE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDL Y .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Wa rranty Period: 30 Months after the date of delivery ] ] |
| 2 | TRACTION TRANSFORMER WITH REQUIRED NUMBER OF SECONDARY TRACTION WINDINGS A LONG WITH PROTECTION EQUIPMENT, SAFETY CHAIN ARRANGEMENT AND HT CABLE WITH PROTECTION SH IELD INCLUDING TERMINATION CRIMPING LUGS, CABLE MARKERS WITH HEAT SHRINKABLE SLEEVES FOR P OWER AND CONTROL CABLES, MATING CONNECTORS, EQUIPMENT MOUNTING AND EARTHING HARDWARE AND ACCESSORIES INCLUDING AUXILIARY MACHINES SUCH AS OIL PUMP, OIL COOLING BLOWERS ETC. AS P ER CLAUSE NO. 4.3 OF RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM (ONE SET PER BASIC UNIT), as per Drawing: AS PER CLAUSE NO. 4.3 O F RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 (REV-O) WITH LATEST ADDENDUM/CORRIGEND UM, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACK ED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKI NG SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTI ON OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 3 | Current transformer and Potential transformer for 25 KV AC as per clause no. 4.1.1 (ii) of RDS O specification no. RDSO/PE/SPEC/EMU/0196-2019 (one set per basic unit) Note: Cable entry in roof shall be from bottom of CT and PT., as per Drawing: As per clause no. 4.1.1 (ii) of RDSO specification no. RDSO/PE/S PEC/EMU/0196-2019, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYT HENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIEN DLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL' S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 4 | IGBT BASED PWM TRACTION CONVERTER SET INCLUDING DC LINK WITH 100 HZ RESONANCE FILTER, BRAKE CHOPPER RESISTOR, DC LINK EARTHING SWITCH, PRE-CHARGING RESISTERS AND CONTACT ORS AND/OR ANY OTHER EQUIPMENT NECESSARY TO REDUCE THE EFFECT OF OTHER HARMONICS ON S&T EQUIPMENT INCLUDING TERMINATION CRIMPING LUGS, CABLE MARKERS WITH HEAT SHRINKABLE SLEEVES FOR POWER AND CONTROL CABLES, MATING CONNECTORS, EQUIPMENT MOUNTING, EARTHING HARDWAR E AND ACCESSORIES INCLUDING AUXILIARY MACHINES AS REQUIRED AS PER CLAUSE NO. 4.5 OF RDSO SPE CIFICATION NO. RDSO/PE/SPEC /EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM.(O NE SET PER MOTOR COACH)., as per Drawing: As per clause no. 4.5 of RDSO specification no. RDSO/PE/SPE C/EMU/ 0196-2019 (REV-O) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COVE RED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USE D FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HAN DLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 5 | THREE-PHASE FULLY SUSPENDED ASYNCHRONOUS INDUCTION MOTORS COMPATIBLE WITH I GBT BASED TRACTION CONVERTER POWER SUPPLY, WITH COUPLING, GEAR BOX ASSEMBLY, SENSORS AND ASSOCIATED EQUIPMENT INCLUDING TERMINATION CRIMPING LUGS, CABLE MARKERS WITH HEAT SHRINKA BLE SLEEVES FOR POWER AND CONTROL CABLES, MATING CONNECTORS, EQUIPMENT MOUNTING AND EAR THING HARDWARE AND ACCESSORIES AS PER CLAUSE NO. 4.6 OF RDSO SPECIFICATION NO. RDSO/PE/SPEC /EMU/0196-2019 REV-O ALONG WITH LATEST ADDENDUM/CORRIGENDUM., as per Drawing: As per clause n o. 4.6 of RDSO specification no. RDSO/PE/ SPEC/EMU/0196-2019 (REV-O) WITH LATEST ADDENDUM/CORRIG ENDUM, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND P ACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH P ACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESC RIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Pe riod: 30 Months after the date of delivery ] ] |
| 6 | BATTERY AND BATTERY BOX AS PER CLAUSE 4.29 OF RDSO SPEC. NO. RDSO/ PE/SPEC/EMU/0 196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM (ONE SET PER BASIC UNIT). , as per Dra wing: AS PER CLAUSE 4.29 OF RDSO SPEC. NO. RDSO/PE/SPEC/EMU/0196-2019, Packing Instruction: SUITAB LY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/ LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the dat e of delivery ] ] |
| 7 | 3-PHASE TO SINGLE PHASE UNDERSLUNG TRANSFORMER OF ADEQUATE CAPACITY FOR AUXI LIARY LOADS (NOT LESS THAN 20 KVA RATING) GENERALLY CONFORMING BUT NOT LIMITED TO ICF SPECIFI CATION NO. ICF/ELEC/160 REV-0 OR LATEST (ONE NUMBER PER COACH)., as per Drawing: GENERALLY CON FORMING BUT NOT LIMITED TO ICF SPECIFICATION NO. ICF/ELEC/160 REV-0 OR LATEST, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/ LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the dat e of delivery ] ] |
| 8 | INTER-VEHICULAR COUPLERS (POWER AND CONTROL) WITH COACH JUMPER CABLE ASSEMBL Y ASSEMBLED ON SS PLATE INCLUDING TERMINATION CRIMPING LUGS, CABLE MARKERS WITH HEAT SHRIN KABLE SLEEVES, MATING CONNECTORS, EQUIPMENT MOUNTING AND EARTHING SS HARDWARE AND OTHE R ASSOCIATED ACCESSORIES AS PER CLAUSE NO. 4.42 OF RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0 196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM (ONE SET PER RAKE)., as per Drawing: A S PER CLAUSE NO. 4.42 OF RDSO SPECIFICATION NO.RDSO/PE/SPEC/EMU/0196-2019 (REV-0) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPAREN T POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE EC O-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDE R NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 9 | Design and supply of electrical cable ducts/trays/conduits up to various equipment with mou nting and earthing hardware and associated accessories including end covers & top covers forsaloon & und erframe for complete rake as per clause no. 4.42.13 of RDSO specification no. RDSO/PE/SPEC/EMU/0196-20 19 (one set per rake). Note: Cable trays shall be without sharp bends especially at cable entry points from Underframe to Superstructure to avoid any damage to cables; Cable trays shall be of hairline finish and fre e from waviness/undulations and without sharp edges. Supplier to ensure the quality of cable trays., as per Drawing: As per clause no. 4.42.13 of RDSO specification no. RDSO/PE/SPEC/EMU/0196-2019, Packing Instru ction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BO X.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STE NCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BAT CH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 10 | AUXILIARY SYSTEM COMPRISING IGBT/ SIC POWER MODULE BASED, AUXILIARY CONVERTER F OR AUXILIARY SUPPLIES INCLUDING AUXILIARY COMPRESSOR (AS PER CLAUSE 4.28) WITH AUTOMATIC BAT TERY CHARGER (AS PER CLAUSE 4.29) INCLUDING AUXILIARY COMPRESSOR AS PER CLAUSE 4.28.18 AND F ASTENERS INCLUDING TERMINATION CRIMPING LUGS, CABLE MARKERS WITH HEAT SHRINKABLE SLEEVES F OR POWER AND CONTROL CABLES, MATING CONNECTORS, EQUIPMENT MOUNTING AND EARTHING HARDW ARE AND ACCESSORIES INCLUDING AUXILIARY MACHINES AS REQUIRED AS PER CLAUSE NO. 4.28 OF RDSO SPECIFICATION NO. RDSO/PE/ SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDU M.(ONE SET PER BASIC UNIT)., as per Drawing: As per clause no. 4.28 of RDSO specification no. RDSO/PE/S PEC/ EMU/0196-2019 (REV-0) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COV ERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USE D FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HAN DLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 11 | LIGHTING SYSTEM (LED BASED) INCLUDING COACH LIGHTS, HEADLIGHT, TAIL LIGHT, MARKE R LIGHTS, FLASHER LIGHTS AND DISASTER MANAGEMENT LIGHT ETC. INCLUDING CONTROL SWITCHGEAR, TERMINATION CRIMPING LUGS, CABLE MARKERS WITH HEAT SHRINKABLE SLEEVES FOR POWER AND CONT ROL CABLES, MATING CONNECTORS, EQUIPMENT MOUNTING AND EARTHING HARDWAREAND ACCESSORIE S. CONTROL SWITCHGEAR FOR THESE ITEMS IS CONSIDERED INCLUSIVE AS PER CLAUSE NO. 4.30 OF RDSO SPECIFICATION NO. RDSO/PE /SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDU M. (ONE SET PER RAKE), as per Drawing: AS PER CLAUSE NO. 4.30 OF RDSO SPECIFICATION NO. RDSO/PE/S PEC/EMU/0196-2019 (REV-0) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COV ERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USE D FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HAN DLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 12 | CAB AC (ROOF MOUNTED AND OF MIN 2.0 TR) WITH CONTROL PANEL, MATING CONNECTORS, WATER DRAIN ARRANGEMENT INCLUDING MOUNTING FRAME AND ANCHORING ARRANGEMENT TO COACH BODY AND ALL ACCESSORIES/HARDWARE GENERALLY CONFORMING TO BUT NOT RESTRICTED TO RDSO SP ECIFICATION NO. RDSO/2007/ EL/SPEC/0055 (LATEST) (ONE SET PER DTC)., as per Drawing: GENERALLY CO NFORMING TO BUT NOT RESTRICTED TO RDSO SPECIFICATION NO. RDSO/2007/EL/SPEC/0055 (LATEST), Pac king Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN W OODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHA LL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF I TEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Mo nths after the date of delivery ] ] |
| 13 | POWER, CONTROL, DATA / COMMUNICATION CABLES, FIRE SURVIVAL CABLES AS MENTIONED IN THE RELEVANT CLAUSES,INCLUDING TERMINATION CRIMPING LUGS, CABLE MARKERS WITH HEAT SHRIN KABLE SLEEVES AND OTHER ACCESSORIES AS PER CLAUSE NO. 4.42 OF RDSO SPECIFICATION NO. RDSO/P E/ SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM (ONE SET PER RAKE)., as per Drawing: AS PER CLAUSE NO.4.42 OF RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 (REV-0) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE O F DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 14 | EPDM & EMC type cable glands for sealing & shielding including mounting hardware and fixin g brackets generally conforming to but not restricted to RDSO specification no. RDSO/2008/ EL/SPEC/0067(l atest). SS protection cover for RMPU cablesand at any other location as decided during prototype manufact ure stage shall also be provided along with EPDM modules (one set per rake), as per Drawing: As per gener ally conforming to but not restricted to RDSO specification no. RDSO/2008/ EL/SPEC/0067(latest)., Packing I nstruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODE N BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months a fter the date of delivery ] ] |
| 15 | MICROPROCESSOR BASED TRAIN CONTROL AND MANAGEMENT SYSTEM (TCMS) WITH BRAKE INTERFACE UNIT INCLUDING FAULT DIAGNOSIS AND DISPLAY SYSTEM IN THE DRIVING CAB AND MULTIPLEXING SYSTEM FOR RELEVANT CONTROL & OTHER SIGNALS (AS PER CLAUSE 4.1.1 (V) AND 4.1.1(V II)) OF RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/C ORRIGENDUM, WHEEL SLIP/SLIDE PROTECTION & ANTI SKID CONTROLS (AS PER CLAUSE NO. 4.1.1 (XXI) & 4 .24 OF RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/C ORRIGENDUM INCLUDING INTEGRATION WITH TCMS OF AUTOMATIC DOOR CLOSURE AND BRAKE SYSTEM, AS PER CLAUSE 4.1.1(XIII) OF RDSO SPEC.NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST A DDENDUM/CORRIGENDUM (ONE SET PER RAKE), as per Drawing: ALL CLAUSES i.e. 4.1.1 (v),4.1.1(vii), 4.1.1 (xxi) & 4.24,4.1.1(xiii) are as per RDSO Spec.no.RDSO/PE/SPEC /EMU/0196-2019 (REV-O) WITH LATEST ADD ENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT PO LYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRI ENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO, PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 16 | EVENT RECORDER AS PER CLAUSE 4.10 OF RDSO SPECIFICATION NO. RDSO/PE/ SPEC/EMU/0 196-2019 (REV-O) ALONG WITH LATEST ADDENDUM/CORRIGENDUM(ONE SET PER RAKE), as per Drawing: A s per clause 4.10 of RDSO specification no. RDSO/PE/ SPEC/EMU/0196-2019 (REV-O) WITH LATEST ADDEND UM/CORRIGENDUM, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO- FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH E TC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 17 | SPEED INDICATING CUM RECORDING EQUIPMENT AS PER CLAUSE 4.20 OF RDSO SPECIFICATI ON NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM (ONE SET PER DTC)., as per Drawing: AS PER CLAUSE 4.20 OF RDSO SPECIFICATION NO.RDSO/PE/SPEC/EMU/0196-20 19 (REV-0) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COVERED WITH BIODE GRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAM E, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 18 | SET OF TWO VCBS WITH EARTHING SWITCH FOR TRACTION CIRCUIT PROTECTION AND HT CA BLE PROTECTION AS PER CLAUSE NO.4.27 OF RDSO SPECIFICATION NO. RDSO/PE/ SPEC/EMU/0196-2019 RE V-0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM (ONE SET PER BASIC UNIT)., as per Drawing: As per c lause no. 4.27 of RDSO specification no. RDSO/PE/SPEC/EMU/0196-2019,REV.0 WITH LATEST ADDENDUM/C ORRIGENDUM, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .E ACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warran ty Period: 30 Months after the date of delivery ] ] |
| 19 | Design, development, manufacture, supply, integration, testing and commissioning of IGBT b ased 3-phase propulsion, control and other equipment for train sets suitable for operation on 25KV AC OHE system conforming to RDSO specification no. RDSO/PE/SPEC/ EMU/0196-2019 (rev.0) along with latest adde ndum/corrigendum including CAMC but without design and supply of bogie. Bidders should factor in the quo ted prices of the items of any other equipment on returnable basis, which the bidder feels necessary or shal l be required during manufacturing, installation, testing/trials of the train sets but not included in item detai ls of tender document from s.no.1 to 43., as per Drawing: RDSO/PE/SPEC/EMU//0196-2019 (REV-0) ALONG WITH ADDENDUM/COR., Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT PO LYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRI ENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO, PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 20 | INFOTAINMENT SYSTEM AS PER SPECIFICATION FOR DESIGN, SUPPLY, INSTALLATION, TESTIN G AND COMMISSIONING OF WI-FI BASED INFOTAINMENT SYSTEM FOR AIR-CONDITIONED CHAIR CARS OF TR AIN SET (INTERCITY TRAIN) AS PER ICF SPECIFICATION NUMBER ICF/ELEC/961 REVISION-0 OR LATEST (ONE SET PER RAKE)., as per Drawing: AS PER ICF SPECIFICATION NUMBER ICF/ELEC/961 REVISION-0 OR LATEST, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING S HALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 21 | AUTOMATIC SMOKE/FIRE DETECTION WITH ALARM SYSTEM HAVING ASPIRATION SENSOR BAS ED FIRE DETECTION TECHNOLOGY GENERALLY CONFORMING TO RDSO SPECIFICATION NO. RDSO/2008/CG- 04 REV V (ONE SET PER RAKE) (MINIMUM CRITERIA OF RDSO SPECIFICATION SHOULD BE MET)., as per Dra wing: AS PER RDSO SPECIFICATION NO. RDSO/2008/CG-04 REV V (Minimum criteria of RDSO specification s hould be met)., Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .E ACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warran ty Period: 30 Months after the date of delivery ] ] |
| 22 | PANTOGRAPH & EARTHING SWITCH WITH MOUNTING INSULATORS, PNEUMATIC CONTROL PA NEL, PANTO ISOLATING COCKS INCLUDING INTERCONNECTING BUS-BARS AND ASSOCIATED HARDWARE - S INGLE PANTOGRAPH SUITABLE FOR 25KV AC SUPPLY SHALL BE USED ON EACH BASIC UNIT AS PER CLAUSE 4.43 NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM(ONE SET PER BASIC UNIT)., as per Drawing: AS PER CLAUSE 4.43 OF RDSO SPEC. NO. RDSO/PE/SPEC/EMU/0196-201 9 (REV-0) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COVERED WITH BIODEG RADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT P ACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, C ONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME , & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 23 | COMPLETE AIR-CONDITIONING SYSTEM (PASSENGER COACHES) WITH NECESSARY EQUIPMEN T SUCH AS ROOF MOUNTED PACKAGE UNIT (RMPU), CONTROL PANEL, MICRO-CONTROLLER ETC. INCLUDIN G TERMINATION CRIMPING LUGS, CABLE MARKERS WITH HEAT SHRINKABLE SLEEVES FOR POWER AND CO NTROL CABLES, MATING CONNECTORS, EQUIPMENT MOUNTING AND EARTHING HARDWARE AND ACCESSO RIES AS PER CLAUSE 4.39 NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CO RRIGENDUM.(ONE SET PER COACH), as per Drawing: AS PER CLAUSE 4.39 OF RDSO SPEC. NO. RDSO/PE/SP EC/EMU/0196-2019 (REV-0) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COVE RED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USE D FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HAN DLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 24 | VOICE COMMUNICATION SYSTEM, PASSENGER INFORMATION SYSTEM INCLUDING THEIR INTE GRATION, COACH DISPLAYS (BOTH INTERNAL AND EXTERNAL), FRONT DESTINATION BOARD (HEAD CODE I N DTCS), AUDIO COMMUNICATION SYSTEM, EMERGENCY TALK BACK SYSTEM AND INTERFACE WITH THE TR AIN MONITORING SYSTEM (TMS), FLUSH MOUNTED ALARM PUSH BUTTON MECHANISM WITH INTEGRATED D UAL LEDS INCLUDING POLYCARBONATE ENCLOSURE (RESETTING ARRANGEMENT AT DOORWAYS) , EXTERN AL FLUSH MOUNTED LED BASED PASSENGER ALARM INDICATOR ON EACH SIDE OF THE COACH AND ANY O THER EQUIPMENT REQUIRED FOR INTERFACING PIS WITH THE RECEIVER-EQUIPMENT OF TMS AS PER CLAUS E 4.11,4.12 ALONG WITH ANNEXURE-A OF RDSO LETTER NO. EL/1.3.17.1/TRAIN SET DATED 18/11/21 AND 4 .21 OF RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019. RECEIVER EQUIPMENT OF EXISTING TRAI N MONITORING SYSTEM (TMS) SHALL BE IN THE SCOPE OF SUPPLY OF THE PURCHASER AND MAY BE MOUN TED IN THE DRIVING CAB (ONE SET PER RAKE). , as per Drawing: As per clause 4.11,4.12 along with Annex ure-A of RDSO letter no. EL/1.3.17.1/Train set dated 18/11/21 and 4.21 of RDSO spec.no. RDSO/PE/SPEC/EM U/0196-2019 (REV-0) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COVERED W ITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WI TH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FI RM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 25 | Supervision of installation and Commissioning. (One set is equal to one rake) [ Warranty Pe riod: 30 Months after the date of delivery ] ] |
| 26 | Upgradation/modification of existing IVC (power and control) with coach jumper cable assem bly assembled on SS plate including termination crimping lugs, cable markers with heat shrinkable sleeves, mating connectors, equipment mounting and earthing SS hardware and other associated accessories as pe r clause no. 4.42 of RDSO specification no. RDSO/PE/SPEC/EMU/0196-2019 for vande Bharat to make it suita ble for Vande Metro, including all accessories required for completion of installation. (Rake set is for 16 Car Vande Metro Rake as per Rake Configuration, RCF SKED-921). [ Warranty Period: 36 Months after the dat e of delivery ] ] |
| 27 | Up gradation of existing 7 Ton Vande Bharat RMPU with 15-ton RMPU confirming to RDSO spe cification No-RDSO/PE/SPEC/AC/D/0168-2012, Rev-(0) including complete accessories as per clause 2.2 for Vande Metro, Heating arrangement (9KW) for heating & dehumidification mode with associated switchgear and protection scheme (prior approval shall be taken from RCF for Vande Metro) OGA drawing no. ICF/SK3- 7-6-040, alt 'ba' Controller generally conforming to but not limited to RDSO/PE/SPEC/AC/0139-2009 (Rev- 1) with display unit and Auto/Manual changeover selection. OGA drawing no. ICF/SK3- 7-5-026 Col. I & II. assoc iated switchgear including all accessories required for complete installation and commissioning.(Set compri ses of two nos, 15Ton RMPUs with individual controller and accessories) Note. Controller shall be provided i n on-board electrical panels for ease of maintenance. [ Warranty Period: 30 Months after the date of deli very ] ] |
| 28 | Modification in length of existing Lighting system (LED based) including coach lights, Headlig ht, tail light, marker lights, flasher lights and Disaster management lights etc. including control switchgear, termination crimping lugs, cable markers with heat shrinkable sleeves for power lugs, cable markers with h eat shrinkable sleeves for power and control cables, mating connectors, equipment mounting and earthing hardware, control switchgear and accessories as per clause no. 4.30 of RDSO specification no. RDSO/PE/SP EC/EMU/0196-2019 for Vande Bharat to make Direct and Indirect LED light fittings suitable for Vande Metro to match the layout/interiors of Vande Metro coach variants. (Set comprises of one rake set of light fittings and all accessories). [ Warranty Period: 30 Months after the date of delivery ] ] |
| 29 | Three phase fully suspended asynchronous induction motor for Vande Bharat with gear drive and associated accessories upgraded as per Underslung EMU traction motor (248 KW) and gear drive. (Set comprises of one Traction Motor along with its Gear Drive and all accessories) Note:1. The Traction motor s hall be suitable for proposed 16-car Vande Metro rake planned with Medha Electrics as per RDSO specificati on RDSO/PE/SPEC/EMU/0096- 20 (Rev.4) along with ICF Annexure-lCF/AEMU/0096- 01(Rev.02). 2. Modificati on of Gearbox and coupling of Vande Bharat Trainset to make it compatible for Vande Metro Train as per R CF-Desc-TS-05. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 30 | SET OF METAL OXIDE GAPLESS LIGHTNING ARRESTORS (02 NOS.) FOR 25 KV AC AS PER CLA USE NO. 4.4 OF RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADD ENDUM/CORRIGENDUM (ONE SET PER BASIC UNIT)., as per Drawing: AS PER CLAUSE NO. 4.4 OF RDSO SPE CIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 (REV-O) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOOD EN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL B E STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM , BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 31 | APC RECEIVER COMPATIBLE WITH EXISTING TRACK MAGNETS AS PER CLAUSE NO. 4.1.1 (XXX VII) OF RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/C ORRIGENDUM.(ONE SET PER DTC), as per Drawing: As per clause no. 4.1.1 (XXXVII) of RDSO specification n o. RDSO/PE/SPEC/EMU/0196-2019(REV.0) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: SU ITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE M ATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/L ABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, D RG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 32 | COMPLETE PRE-FABRICATED DRIVER DESK HOUSING ALL THE NECESSARY EQUIPMENT AND D RIVER/ GUARD SEAT, MASTER CUM BRAKE CONTROLLER, CAB RECORDING EQUIPMENT, CCMS (CENTRALIZE D COACH MONITORING SYSTEM) , INCLUDING TERMINATION CRIMPING LUGS, CABLE MARKERS WITH HEAT SHRINKABLE SLEEVES FOR POWER AND CONTROL CABLES, MATING CONNECTORS, EQUIPMENT MOUNTING AND EARTHING HARDWARE AND ACCESSORIES AS PER CLAUSE 4.14,4.16, 4.17 AND 4.44 OF RDSO SPECIFI CATION NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM. NOTE: CAB RADIO SHALL BE PROVIDED BY IR FOR SECTIONS WITH GSM-R (ONE SET PER DTC)., as per Drawing: As per clause 4.14,4.16, 4.17 and 4.44 of RDSO specification no. RDSO/PE/SPEC/EMU/0196-2019 (REV-0) WITH LATEST ADDENDUM/CORRIGENDUM., Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRAN SPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHAL L BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME , ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DES PATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 33 | SET OF CONTROL EQUIPMENT SUCH AS RELAYS, CONTACTORS, CIRCUIT BREAKERS AND REL ATED SWITCHGEARS ETC. FOR PROPULSION SYSTEM, CONTROLS AND AUXILIARIES IN THE ASSEMBLED FOR M VIZ. CUBICLE OR CABINET AS PER CLAUSE 4.22 NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH L ATEST ADDENDUM/CORRIGENDUM OF RDSO SPECIFICATION (ONE SET PER RAKE)., as per Drawing: AS PER CLAUSE 4.22 OF RDSO SPECIFICATION NO.RDSO/PE/SPEC/EMU/0196-2019 (REV-0) WITH LATEST ADDENDU M/CORRIGENDUM, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHE NE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDL Y .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Wa rranty Period: 30 Months after the date of delivery ] ] |
| 34 | Electrically operated wiper system with washer tank as per clause no. 4.17.1 (iii) of RDSO sp ecification no. RDSO/PE/SPEC/EMU/0196-2019 (one set per DTC), as per Drawing: As per clause no. 4.17.1 ( iii) of RDSO specification no.RDSO/PE/SPEC/EMU/0196-2019, Packing Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRO DUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM' S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 35 | PASSENGER CAR SURVEILLANCE SYSTEM WITH FACILITY TO STREAM VIDEO IN CENTRAL SER VER AS PER CLAUSE 4.13 OF RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 REV.0 ALONG WITH LATEST ADDENDUM/CORRIGENDUM (ONE SET PER RAKE)., as per Drawing: AS PER CLAUSE 4.13 OF RDSO S PECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 (REV-O) WITH LATEST ADDENDUM/CORRIGENDUM, Packi ng Instruction: SUITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WO ODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHAL L BE STENCILED/LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF IT EM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Mont hs after the date of delivery ] ] |
| 36 | LOAD WEIGHING SYSTEM INCLUDING REDUNDANT WEIGHT SENSORS AT BOGIE LEVEL, JUNCT ION BOXES FOR INTERFACING CABLES, MATING CONNECTORS, SS HARDWARE, CABLE MARKERS AND CRIM P CONTACTS. THE SCOPE OF SUPPLY OF PRESSURE TRANSDUCERS SHALL BE WITH SUPPLIER AS PER CLAU SE 4.26 OF RDSO SPECIFICATION NO. RDSO/PE/SPEC/EMU/0196-2019 REV-0 ALONG WITH LATEST ADDEND UM/CORRIGENDUM.(ONE SET PER RAKE)., as per Drawing: AS PER CLAUSE 4.26 OF RDSO SPECIFICATION N O. RDSO/PE/SPEC/EMU/0196-2019 (REV-0) WITH LATEST ADDENDUM/CORRIGENDUM, Packing Instruction: S UITABLY COVERED WITH BIODEGRADABLE TRANSPARENT POLYTHENE AND PACKED IN WOODEN BOX.THE MATERIAL USED FOR PRODUCT PACKAGING SHALL BE ECO-FRIENDLY .EACH PACKING SHALL BE STENCILED/ LABELED HANDLE WITH CARE, CONSIGNEE NAME, ORDER NO,PL'S NO , DESCRIPTION OF ITEM, BATCH NO, DRG/SPEC NO, QTY,FIRM'S NAME, & DATE OF DESPATCH ETC. [ Warranty Period: 30 Months after the dat e of delivery ] ] |
| 37 | Comprehensive Maintenance Contract (CMC) shall cover item no 5 (PL No. 31711741), 6 (PL No. 31720778), 7 (PL No. 31720780), 8 (PL No. 31761112), 10 (PL No. 31903629), 12 (PL No. 31720791), 1 3 (PL No. 31903630), 14 (PL No. 31903812), 15 (PL No. 31711753 along with up gradation) and 16 (PL No. 31711832) of Schedule of Requirements. CMC is for eight-years and will start immediately after warranty. R CF shall enter into a rate contract for CMC with successful bidder. Individual Railway shall enter into a contr act for CMC on the basis of this rate contract, after satisfying itself of rate reasonability as on date of enteri ng into CMC. In financial evaluation of bids, Net Present Value (NPV) of CMC charges shall be reckoned with discounting rate of 10%. CMC rates have been called for eight-years in Schedule of Requirement. [ Warran ty Period: 2 years, AMC Period: 8 years, Rate of Discounting: 10 % ] ] |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail