| 1 | Civil Work |
| 2 | Dismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. complete as per the direction of the Engineer-in-charge. |
| 3 | A) Earth work in ordinary soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles as directed by the Engineer-in-charge. |
| 4 | Brick work with fly ash bricks 25cm x 12cm x 8cm having crushing strength not less than 75 Kg/cm2 with dimensional tolerance +8 percent in cement mortar (1:6) in foundation.etc. complete with cost, coveyance, loading and unloading, royalties of all materials and cost of all labours,T&P etc. complete in all respect as desired by the Engineer in charge. |
| 5 | Ground Floor |
| 6 | First Floor |
| 7 | Providing 16mm. thick cement plaster in all floors at all height with cement mortar of mix with water proofing compound (1:6) finished smooth to outside smooth surface of brick masonry walls after racking out the joints including watering and curing, rounding of corners etc. complete with cost, coveyance, loading and unloading, royalties of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge. |
| 8 | Filling in foundation and plinth with filling sand including watering and ramming as directed by the Engineer-in-charge of earth work. |
| 9 | Providing & laying P.C.C. work of (1:4:8) using 40mm size crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete , including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. but excluding GST as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge. |
| 10 | 2.5cm artificial stone flooring with cement concrete (1:2:4) including punning using 12mm size crusher broken granite chips.including watering and curing etc.complete with cost, coveyance, royalties of all materials and cost of all labours, required for the work etc. complete in all respect as desired by the Engineer in charge. |
| 11 | Dismantling and removing 2.5cm thick grading concrete from roof slab, cleaning the surface, lowering and removing the debris within 50m lead.complete as per the direction of the Engineer-in-charge. |
| 12 | 2.5cm. thick grading concrete (1:2:2) on roof slab with 6mm. Size on new work crusher broken hard Granite chips . all complete with cost, conveyance, loading and unloading, royalties of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineering-in-charge/Consultant. |
| 13 | Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead.complete as per the direction of the Engineer-in-charge. |
| 14 | Ground Floor |
| 15 | 1st Floor |
| 16 | Providing and laying approved thick antiskid vertified Tiles of approved make, quality, colour and size 600mm x 600mm or other approved size as per design in floor & dado/skirting upto required height from floor level fixed in neat cement slurry after soaking the tiles in water and fixing over an under layer of 25mm thick cement mortar (1:1) , filling joints with white cement mixed with colouring pigments to match the colour and shade including washing and cleaning with Oxalic acid including polishing, cost of all materials, labour, ,, transportation, loading & unloading, royalties, sundries, T&P, watering and curing etc. complete as per the direction of the Engineer-in-Charge. |
| 17 | Ground Floor |
| 18 | First Floor |
| 19 | Providing and applying CHRYSO proof acrylic polymer based ELASTOMERIC heavy duty water proofing coating of 1 to 1.5mm thick having elongation 100%, including the cost of all materials, cost of all labour, conveyance, taxes,loading,unloading,scaffolding, T&P, etc, all complete as per the direction of Engineer-inCharge. (DAR-2021,P/N-1921-1922) |
| 20 | Providing and applying Cement based putty punning of approved make and shade over the plastered surface of wall to make the surface smooth by sand papering including cost of scaffolding, staging charges, cost, conveyance, taxes of all materials, cost of all labour, labour cess, T&P, etc. complete as per the direction of the Engineer-in-charge. |
| 21 | Providing and painting internal surface one coats with plastic emulsion paint over a coat of water based primer of approved quality and approved shade in all floors at all height by making the surface of wall smooth including cost, coveyance, loading and unloading of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge. |
| 22 | Ground Floor |
| 23 | First Floor |
| 24 | Painting to external surface of building with two coats of weather coat over a coat of water based primer of approved shade and quality of approved design, after cleaning by watering & removing the dirts etc. to the surface to be painted including watering, curing, cost, conveyance of all materials, cost of all labour, brushes, T&P etc. and necessary scaffolding work complete as directed by the Engineer-in-charge. Please Enable Macros to View BoQ information |