|
| 1 | M & L for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss effloerent salts and treading oil and greasy spots and applying one coat of white (lime) wash complete all as specified and directed by Engineer-in-Charge |
| 2 | All as specified in Item No 1 above but applying one coat of white wash on ceiling. |
| 3 | All as specified in Item No 1 above but applying two coat of white wash on ceiling. |
| 4 | All as specified in item No 1 above but applying one coat of Oil Bound distemper on walls complete |
| 5 | M & L for complete scraping down and complete removal of existing treatment of old decorative surface of walls with steel wire brushes of smoke spots, moulds, moss efflorecent salts and applying two coats of Oil bound distemper all as specified and directed by Engineer-in-Charge. |
| 6 | M & L for preparation of old surface of ceiling and applying one coat of oil bound distemper complete all as specified and directed. |
| 7 | M & L for one coat of synthetic enamel paint over wooden surfaces including preparation of old surfaces over 10cm width or girth all as specified and directed |
| 8 | M & L for painting one coat synthetic enamel paint on steel surface including preparation of old surface of any description , over 10 cm width or girth not otherwise described all as specified and directed |
| 9 | Taking down cement plaster on brick or stone walls or concrete surface etc including raking out joints, hacking for key scrubbing down with water all as specified and directed. |
| 10 | M&L rendering 10 mm thick cement plastering on brick /concrete surfaces in CM (1:6) finishing surfaces even and fair without using extra cement complete all as specified. |
| 11 | M&L preparing newly plastered surfaces of wall and applying complete wall with 2mm POP/Birla putty and making smooth surfaces and applying two coats of Oil bound distemper over a coat of primer all as specified and directed by Engineer-in-Charge. |
| 12 | M&L rendering 5 mm thick in CM 1:3 on ceiling, finished even and smooth without using extra cement complete all as specified. |
| 13 | M&L for preparation of newly plastered surfaces ceiling and applying three coats of white wash all as specified and directed. |
| 14 | S&F in repair stainless Steel Wire Cloth, 0.36mm nominal dia of Wire and average width of aperture 1.4 mm and fixed with Tinned Tacks of Mild Steel Wire Stapes, fixing and repair etc, complete all as specified and as directed. |
| 15 | M&L cover fillet (lipping) of tempered hard board 40mm wide, 6mm thick and fixing with screw complete all as specified and directed. |
| 16 | M&L for plain fillets,square, rectangular or triangular in section, clean sawn, secured with nails or brads, exc 3 sq cm & n.exc 6 sq. cm second class H/W complete all as specified |
| 17 | S&F fixed in repairs aluminium sheet 0.56 mm th fixed to door shutters with stainless steel screws all as specified and directed |
| 18 | S&F in repair curtain rods, 20 mm dia, rails, Aluminium powder coated incl brackets, stops, rollers etc. complete |
| 19 | M & L for Cleaning of shrubs growth on bldgs wall, chajja, applying hot bitumen and making good the damaged portion in CM 1:3 and match the existing surface at a height n.xc 15m from ground level including necessary scafolding, all saftey measures complete all as specified and as directed. |
| 20 | M & L for jet washing (90 to 150 bars as required) rubbing down and stopping of old paint and scales over surfaces and applying two coats of 100% premium acrylic emulsion paint ( Apex ultima or equivalent) having voc less than 50 gm/litre and UV resistance as per IS 15489 : 2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/10 Sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 Sqm over old and new surfaces.Note:-1.Tri party MOU shall be signed between MES, contractor and paint manufacturing company for pre , during an post work completion site inspetion.2. The quantity compress for Bldg of height upto G+4 and over head reservior of any height and capacity incl required necessary scaffolding and safety precaution. |
| 21 | M & L for preparation of old surfaces and applying one coats of 100% premium acrylic emulsion paint ( Apex ultima or equivalent) having voc less than 50 gm/litre and UV resistance as per IS 15489 : 2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/10 Sqm over complete all as specified and directed |
| 22 | (Applicable for above all items)(a). Contrator has to employ skilled/unskilled tradesman with adequate experience & required documents to be submitted to office , The rate shall be quotted by the contractor including scafolding to carry out the work for height more than 10.00 mtrs. (b). Labour should wear contractors uniform with firm logo, failing which recovery should be made.(c). Contractor has to complte welcome maints in all aspect witin time limit as per Offcier Quarter allowtment letter, failing which recovery will be initiated(d). Minimum of 02 x teams of each trades shall be available for maint of urgent nature whenever called upon of any trade, failing which recovery will be initiated for not employing adequate labour at site. |
| 23 | (e) Site clearance shall be done by contractor after finishing work.(f) All Scarps will be done with mechanical scaper(g) Mechanical scaper should be deposit in our store at the time of sample approval(h) Contractor has to procure and deposit total quantity of material as per manufacturer instruction and sample approved by GE, the quantity of material calculated as per CA is then kept under the safe custody of Engr In charge. (j) 2 mm thick POP/Birla putty shall be done by contractor whereever reqd and as directed by Engr-in-Charge Please Enable Macros to View BoQ information |